Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
16 Oct 2023, 5:00 pmClosed
Superintending Engineer
EDC, Ayodhya
Increasing Capacity of Transformers at Different Places and Construction of Transformer Plinth and Fencing of Transfomer Under Electricity Distribution Division-Rudauli, Ayodhya
2023_MVVNL_844873_1
102 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Faizabad
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EDC
₹16,000
31 Oct 2023
30 Sept 2023
17 Oct 2023
30 Sept 2023
16 Oct 2023
30 Sept 2023
Amount
Part - A ( Material) Following Material Supplied by the Contractor:-
Clamp for Top & S/s
Stay Clamp
Stay Insulator
Suspension Clamp
Dead And Clamp
LT Clamp for PCC Pole
Copper L Pices For 400 KVA T/F
Aluminum Lug 25 KVA T/F
Aluminum Lug 63 KVA T/F
Aluminum Lug 400 KVA T/F
Holding Clamp Top & Dropper Channel
Stone Pad
Nut & Bolt
Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 70 Kms. (distance approx)
PCC Pole 8.5 Mtr. Long
XLPE Cable 1x400 sqmm
LT XLPE Cable 3x70 sqmm
AB Cable 3x50
ACSR Weasel Conductor
Transformer 25 KVA
Transformer 63 KVA
Transformer 250 KVA
Transformer 400 KVA
Other matching Materials
Dragging of PCC/ST Pole from dump site to pit site
Fabrication and Errection of Double Pole Support on PCC/ST Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, Binding and jumpering of ACSR Conductor as per RESSPO Norms
Stringing, Sagging, Binding and jumpering of AB Cable 3x50 Conductor as per RESSPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Construction of Transformer Plinth including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
Fencing of Transformer Plinth with the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc.
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Mounting of 25 KVA Transformer as per RESSPO Norms.
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 250 KVA Transformer as per RESSPO Norms.
Mounting of 400 KVA Transformer as per RESSPO Norms.
Connection of L.T. XLPE Cable Different Size
Rect. Back old and used 10 KVA T/F
Rect. Back old and used 16 KVA T/F
Rect. Back old and used 100 KVA T/F
Rect. Back old and used 250 KVA T/F
Hindustan Electric Work
ANCHAL CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .