Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-AOC | ₹5.5 Cr Quoted ₹5.7 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹5.8 Cr+₹11.0 L (1.94%)Rejected-Finance | ₹5.8 Cr+₹11.0 L (1.94%) | L2 | Rejected-Finance Higher than lowest |
| 3 | L3₹5.9 Cr+₹22.1 L (3.88%)Rejected-Finance | ₹5.9 Cr+₹22.1 L (3.88%) | L3 | Rejected-Finance Higher than lowest |
Tender Value
₹5.5 Cr
EMD Value
₹2.9 L
Closing Date
31 Dec 2019, 3:00 pmClosed
Superintending Engineer-H-C and M Villupuram
Office of the Superintending Engineer-H-C and M- Circle Ellis Chatram Road-Vazhudareddy-Villupuram
Widening-Strengthening-Improvements- Improvements to Riding quality-Culvert and Retaining wall including upkeeping works in Ulundurpet-H-C and M Subdivision Jurisdiction Package 52
2019_HWAY_149538_1
TN30-2019-20-HDO-Dt.25.11.2019
Open Tender
Civil Works - Highways
Percentage
180 days
Kallakurichi
Please Refer PQ Document VOL-I
8 documents required · 8 mandatory
₹0
₹2.9 L
Yes
29 Jan 2020
29 Nov 2019
3 Jan 2020
29 Nov 2019
31 Dec 2019
9 Dec 2019
2 Dec 2019 - 4 Dec 2019
eProcurement System Government of Tamil Nadu Created By: Rajababu A Created Date/Time: 08-Jan-2020 10:57 AM Tender Title: CRIDP_2019-20_Package_52 Tender ID: 2019_HWAY_149538_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Villupuram Circle
Widening, Strengthening, Improvements, Improvements to Riding quality, Culvert and Retaining wall including upkeeping works in Ulundurpet (H) C&M Subdivision Jurisdiction (Package 52) A-Widening from Intermediate lane to Two lane and Strengthening of M.Kunnathur Naripalayam road at km 3/100 - 4/300 including Reconstruction of narrow culvert in Km.3/6, 3/8, 3/10, 4/2 (4 Nos) and construction of Retaining wall in Km 3/6-8 (MD 620) including upkeeping for a period of 60 months B-Widening from Intermediate lane to Two lane and Strengthening of M. Kunnathur Naripalayam road at km 4/300 - 5/900 including reconstruction of culverts Km.4/8, 5/6(MD 620) including upkeeping for a period of 60 months C-Widening from Intermediate lane to Two lane and Improvements of M. Kunnathur Naripalayam road at km 16/8 - 17/8 (MD 620)including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 21/6 - 25/2 of Rishivandhiyam Nemili Road via Eraiyur Palayam (MD 672) including upkeeping for a period of 60 months E-Improvements to Riding Quality at km 0/0 - 0/4 of Ulundurpet Railway feeder Road (MD 513) including upkeeping for a period of 60 months F-Improvements to Riding Quality at km 2/6 - 2/900 of Eraiyur Adhanur Road including upkeeping for a period of 60 months G-Reconstruction RCC slab culvert across Local odai at km 9/2 of Parikkal Periyasevalai road (MD-336) including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 RENGARAJU RAMKUMAR 49271258.930 5.000 57943001.000 Five Crore Seventy Nine Lakh Fourty Three Thousand One
2.00 Kaliyan 49271258.930 3.000 56839325.000 Five Crore Sixty Eight Lakh Thirty Nine Thousand Three Hundred and Twenty Five
3.00 Ayub Constuctions 49271258.930 7.000 59046677.000 Five Crore Ninty Lakh Fourty Six Thousand Six Hundred and Seventy Seven
Lowest Amount Quoted BY: Kaliyan(56839325.000)
BOQ Summary Details Tender Title: CRIDP_2019-20_Package_52 Tender ID: 2019_HWAY_149538_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Kaliyan 56839325.000 L1
2 RENGARAJU RAMKUMAR 57943001.000 L2
3 Ayub Constuctions 59046677.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .