Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance 233 PLATINUM PLAZA OPP IOCL PUMP NR JUDGES BUNGLOW CROSS ROAD BODAKDEV AHMEDABAD GUJARAT 380054 | AHMADABAD | GUJARAT | 380054 | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.0 Cr+₹24.3 L (6.54%)Admitted-Finance 154 D OKHLA PHASE 1 VILLAGE TOWN INDUSTRIAL AREA CITY NEW DELHI SOUTH DELHI 110020 INDIA | SOUTH EAST DELHI | DELHI | 110020 | ₹4.0 Cr+₹24.3 L (6.54%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 Cr+₹27.9 L (7.51%)Admitted-Finance | ₹4.0 Cr+₹27.9 L (7.51%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹28.8 L (7.73%)Admitted-Finance | ₹4.0 Cr+₹28.8 L (7.73%) | L4 | Admitted-Finance |
| 5 | L5₹4.3 Cr+₹56.3 L (15.1%)Admitted-Finance | ₹4.3 Cr+₹56.3 L (15.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | EVERCREST PROJECTS PVT LTD. L1 | BRITE INDUSTRIES L8 | Gemini Cooling Systems Projects Private Limited L7 | Sri Venkateswaraa Engineering L4 | HV AIRCONDITIONING SYSTEMS PVT. LTD. L6 | TRAC FUJICO AIR SYSTEMS LLP L5 | UNIVERSAL MEP PROJECTS & ENGINEERING SERVICES LIMITED L9 | ENGINEERING CONSOLIDATED L3 | Harcomp Airflex Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Centrifugal fan: The scope of work includes supply, handling, installation, testing and commissioning of upblast type centrifugal fans along with inverted duty energy efficient motor (IE3). The scope also includes erection of accessories like flexible connections at fan inlet and outlet along with woven glass cloth, base frame, vibration isolators, seismic arrestors, V-belt guard, grouting bolts, grouting etc., as per technical specification. Capacity 20,000 CMH, St. Pressure 2600 Pa | 2 | No | 14,22,064 ₹28,44,128 | 16,50,000 ₹33,00,000 | 14,00,000 ₹28,00,000 | 18,70,450 ₹37,40,900 | 7,65,000 ₹15,30,000 Lowest | 10,18,863 ₹20,37,726 | 11,03,147 ₹22,06,294 | 17,00,000 ₹34,00,000 | 19,57,863 ₹39,15,726 |
| 2.00 | GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16)
22 Gauge | 450 | sqm | 1,472 ₹6,62,400 Lowest | 1,500 ₹6,75,000 | 1,500 ₹6,75,000 | 1,497 ₹6,73,650 | 1,700 ₹7,65,000 | 1,691 ₹7,60,950 | 1,658 ₹7,46,100 | 1,900 ₹8,55,000 | 1,521 ₹6,84,450 |
| 3.00 | GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16)
20 Gauge | 350 | sqm | 1,644 ₹5,75,400 Lowest | 1,650 ₹5,77,500 | 1,700 ₹5,95,000 | 1,830 ₹6,40,500 | 2,000 ₹7,00,000 | 1,930 ₹6,75,500 | 1,847 ₹6,46,450 | 2,200 ₹7,70,000 | 1,760 ₹6,16,000 |
| 4.00 | GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16)
18 Gauge | 300 | sqm | 1,868 ₹5,60,400 | 1,850 ₹5,55,000 Lowest | 1,900 ₹5,70,000 | 1,900 ₹5,70,000 | 2,250 ₹6,75,000 | 2,242 ₹6,72,600 | 2,091 ₹6,27,300 | 2,800 ₹8,40,000 | 1,900 ₹5,70,000 |
| 5.00 | GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16)
16 Gauge | 700 | sqm | 2,110 ₹14,77,000 | 2,400 ₹16,80,000 | 2,100 ₹14,70,000 | 2,098 ₹14,68,600 Lowest | 2,600 ₹18,20,000 | 2,486 ₹17,40,200 | 2,569 ₹17,98,300 | 3,500 ₹24,50,000 | 2,395 ₹16,76,500 |
| 6.00 | SS304L duct: Supply, fabrication, erection and testing of exhaust air ducting with AISI SS304L, complying to ASTM A 240 complete with SS reinforcement, pickling & passivation, TIG welding, third party inspection, SS fasteners, etc., as per technical specification and drawings. The duct weld joints shall be 100 % DP tested. Duct welding and construction shall be as per ASME Sec VIII Div 1 and SMACNA standard. (Note: Necessary duct supporting structural material is covered under item no. 16 & 17) 3.0 mm thick | 550 | sqm | 19,008 ₹1,04,54,400 | 21,700 ₹1,19,35,000 | 20,000 ₹1,10,00,000 | 13,200 ₹72,60,000 Lowest | 21,500 ₹1,18,25,000 | 19,756 ₹1,08,65,800 | 23,461 ₹1,29,03,550 | 14,000 ₹77,00,000 | 15,765 ₹86,70,750 |
| 7.00 | SS304L duct: Supply, fabrication, erection and testing of exhaust air ducting with AISI SS304L, complying to ASTM A 240 complete with SS reinforcement, pickling & passivation, TIG welding, third party inspection, SS fasteners, etc., as per technical specification and drawings. The duct weld joints shall be 100 % DP tested. Duct welding and construction shall be as per ASME Sec VIII Div 1 and SMACNA standard. (Note: Necessary duct supporting structural material is covered under item no. 16 & 17) 5.0 mm thick | 420 | sqm | 31,209 ₹1,31,07,780 | 32,100 ₹1,34,82,000 | 33,000 ₹1,38,60,000 | 22,000 ₹92,40,000 Lowest | 35,000 ₹1,47,00,000 | 32,071 ₹1,34,69,820 | 38,771 ₹1,62,83,820 | 23,000 ₹96,60,000 | 25,700 ₹1,07,94,000 |
| 8.00 | Thermal insulation:Supply and installation of closed cell Nitrile rubber (class“O”) thermal insulation duly laminated with aluminum foil of mat finish on supply air duct. Insulation shall be sticked by applying two coats of cold setting adhesive as per technical specification. | 1,800 | sqm | 1,001 ₹18,01,800 | 1,150 ₹20,70,000 | 2,500 ₹45,00,000 | 710 ₹12,78,000 Lowest | 1,205 ₹21,69,000 | 1,124 ₹20,23,200 | 1,127 ₹20,28,600 | 1,700 ₹30,60,000 | 956 ₹17,20,800 |
| 9.00 | Grilles: Supply and installation of double deflection type exhaust air grill with SS 304L material, 1.5 mm thick, adjustable and locking type SS 304L volume controll damper.The louvers shall be adjustable in horizontal and vertical directions. The louvers portion shall be removable type for adjusting volume control damper. | 2 | sqm | 62,012 ₹1,24,024 | 25,500 ₹51,000 | 25,000 ₹50,000 Lowest | 30,400 ₹60,800 | 80,000 ₹1,60,000 | 38,340 ₹76,680 | 1,55,320 ₹3,10,640 | 90,000 ₹1,80,000 | 75,024 ₹1,50,048 |
| 10.00 | Diffuser: Supply and installation of square shape ceiling diffusers, 16 G thick extruded aluminium powder coated material, along with removable core & anti smudge ring type volume control dampers. | 16 | sqm | 14,317 ₹2,29,072 | 19,000 ₹3,04,000 | 13,000 ₹2,08,000 Lowest | 13,620 ₹2,17,920 | 21,500 ₹3,44,000 | 27,561 ₹4,40,976 | 13,126 ₹2,10,016 | 20,000 ₹3,20,000 | 23,494 ₹3,75,904 |
Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
20 Jan 2025, 3:00 pmClosed
Project Director, FRFCF
Office of the Project Director, FRFCF-NRB, Kalpakkam
Supply, Installation, Testing and Commissioning of Air Conditioning and Ventilation of RUP Enclosure exhaust system at FRFCF, Kalpakkam
2024_BARC_840254_1
BARCF/FRFCF/ME/TR-050/2024
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
365 days
FRFCF, KALPAKKAM
Please Refer Tender Document
8 documents required · 8 mandatory
₹0
₹9.6 L
Yes
FRFCF, KALPAKKAM
26 Mar 2025
19 Dec 2024
22 Jan 2025
20 Dec 2024
20 Jan 2025
10 Jan 2025
20 Dec 2024 - 31 Dec 2024
2 Jan 2025
Amount
Centrifugal fan: The scope of work includes supply, handling, installation, testing and commissioning of upblast type centrifugal fans along with inverted duty energy efficient motor (IE3). The scope also includes erection of accessories like flexible connections at fan inlet and outlet along with woven glass cloth, base frame, vibration isolators, seismic arrestors, V-belt guard, grouting bolts, grouting etc., as per technical specification. Capacity 20,000 CMH, St. Pressure 2600 Pa
GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16) 22 Gauge
GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16) 20 Gauge
GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16) 18 Gauge
GI duct: Supply, fabrication, erection and testing of supply air duct with GI material, complying to IS: 277, Class IV, Grade 275 GSM, necessary reinforcement, supply air collars, vanes, splitters, fasteners, etc., as per technical specification and duct layout drawings. Duct construction shall be as per SMACNA standard. (Note: Necessary duct support and reinforcement structural material (MS) are covered under item no. 16) 16 Gauge
SS304L duct: Supply, fabrication, erection and testing of exhaust air ducting with AISI SS304L, complying to ASTM A 240 complete with SS reinforcement, pickling & passivation, TIG welding, third party inspection, SS fasteners, etc., as per technical specification and drawings. The duct weld joints shall be 100 % DP tested. Duct welding and construction shall be as per ASME Sec VIII Div 1 and SMACNA standard. (Note: Necessary duct supporting structural material is covered under item no. 16 & 17) 3.0 mm thick
SS304L duct: Supply, fabrication, erection and testing of exhaust air ducting with AISI SS304L, complying to ASTM A 240 complete with SS reinforcement, pickling & passivation, TIG welding, third party inspection, SS fasteners, etc., as per technical specification and drawings. The duct weld joints shall be 100 % DP tested. Duct welding and construction shall be as per ASME Sec VIII Div 1 and SMACNA standard. (Note: Necessary duct supporting structural material is covered under item no. 16 & 17) 5.0 mm thick
Thermal insulation:Supply and installation of closed cell Nitrile rubber (class“O”) thermal insulation duly laminated with aluminum foil of mat finish on supply air duct. Insulation shall be sticked by applying two coats of cold setting adhesive as per technical specification.
Grilles: Supply and installation of double deflection type exhaust air grill with SS 304L material, 1.5 mm thick, adjustable and locking type SS 304L volume controll damper.The louvers shall be adjustable in horizontal and vertical directions. The louvers portion shall be removable type for adjusting volume control damper.
Diffuser: Supply and installation of square shape ceiling diffusers, 16 G thick extruded aluminium powder coated material, along with removable core & anti smudge ring type volume control dampers.
Volume Control damper: Supply and installation of multi opposed blade type manual volume control damper, rectangular/circular shape, 16 G GSS casing & 16 G GSS blades, shaft, bearing etc locking arrangement and OPEN/CLOSE inidcation etc., as per technical specification.
Leak tight isolation dampers with metallic seal (Exhaust filter bank rooms): Supply, installation, testing and commissioning of single louver, butterfly type, manual gear operated isolation dampers for inlet and outlet of exhaust filter bank room. It shall consists of SS 304L body & disc, gear box, limit switches for OPEN/CLOSE position indication, SS flexible metallic seal, necessary matching flanges, SS fasteners etc. as per technical specification. The design and construction of the dampers shall be as per ASME AG1-class B. (Note: Necessary MS structural material for supporting dampers is covered under item no. 16) Size 1300 mm x 1000 mm
Leak tight isolation dampers with metallic seal (Exhaust filter bank rooms): Supply, installation, testing and commissioning of single louver, butterfly type, manual gear operated isolation dampers for inlet and outlet of exhaust filter bank room. It shall consists of SS 304L body & disc, gear box, limit switches for OPEN/CLOSE position indication, SS flexible metallic seal, necessary matching flanges, SS fasteners etc. as per technical specification. The design and construction of the dampers shall be as per ASME AG1-class B. (Note: Necessary MS structural material for supporting dampers is covered under item no. 16) Size 1600 mm x 1200 mm
Erection of pneumatic damper: Transportation, handling and erection of pneumatically operated isolation dampers at fan inlet and outlet. Note: Supply of all pneumatically operated butterfly dameprs is in department scope. Dia 650 mm
Erection of pneumatic damper: Transportation, handling and erection of pneumatically operated isolation dampers at fan inlet and outlet. Note: Supply of all pneumatically operated butterfly dameprs is in department scope. Size 650 mmx500 mm
MS Supports: Supply of materials, fabrication and erection of MS structural steel confirming to IS 2062 Gr.B for supporting ducts, plenums, isolation dampers, pipes, equipment supports etc., including one coat of epoxy primer and two coat of epoxy painting. The structural material shall be in the form of angle, channel, beam, plate, pipe, rod, fasteners, clamp etc.
SS304 Supports: Supply of materials, fabrication and erection of SS304 structural steel in the form of angle, channel, beam, plate, 3mm/6mm flats/sheet, rod, fasteners, clamp etc as per ASTMA240 with original linkable mill test certificate. 3mm flats/sheets shall be provided whereever CS to SS contact is there.
Supply and installation of Heavy Duty Anchor or equivalent for providing pipe supports where ever embedded plates are not available / provided. The anchor shall be galvanized steel HSL4-G M12 x 141 mm
Opening and enclosing of brick wall: Opening of brick wall of average thickness of 150 mm to 300mm for routing of pipe & ducts and enclosing the same with proper PVC sleeves, providing brick filling and cement mixture at various locations.
Opening and enclosing of concrete wall: Opening of concrete wall of average thickness of 150 mm to 300mm for routing of pipe & ducts and enclosing the same with proper PVC sleeves, providing brick filling and cement mixture at various locations.
Supply, Installation and Testing of portable type confined space ventilation blower along with attached flexible ducting/hose at either flange for intake or exhaust ventilation. Duct size of atleast 10 metres, retractable for easier, safer storage as per technical specification. Capacity of 1500 CFM (2550 CMH) St Pressure 200-300 Pa
Supply, Installation, Testing and Commissioning of Reciprocating type no-lub air compressor with air receiver of capacity 70 litres; Pressure: 9.0 kg/cm2 (g) with all accessories as per techincal specification.
Harcomp Airflex Pvt. Ltd. (BID ID -3157007)
ENGINEERING CONSOLIDATED (BID ID -3155850)
Sri Venkateswaraa Engineering (BID ID -3158182)
TRAC FUJICO AIR SYSTEMS LLP (BID ID -3158325)
HV AIRCONDITIONING SYSTEMS PVT. LTD. (BID ID -3158248)
Gemini Cooling Systems Projects Private Limited (BID ID -3158170)
BRITE INDUSTRIES (BID ID -3157333)
UNIVERSAL MEP PROJECTS & ENGINEERING SERVICES LIMITED (BID ID -3158238)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .