Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical BHUBANESWAR | JAJAPUR | ODISHA | 755007 | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
| 5 | Not Admitted-Fee/PreQual/Technical AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | Not Admitted-Fee/PreQual/Technical Others-Original documents not furnished as per requirement of bid criteria |
Tender Value
₹80.5 L
EMD Value
₹80,482
Closing Date
13 Jun 2026, 5:00 pmClosed
DPP, OUAT, BBSR
OUAT CAMPUS, SIRIPUR, BHUBANESWAR
Construction of specialized Seed Storage Godown at AICRP on Ground Nut Campus inside Horticulture Vatika OUAT Orchard Bhubaneswar Civil construction work
2026_OUAT_130196_1
01/2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
BHUBANESWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
DPP OUAT
₹80,482
Yes
10 Jul 2026
30 May 2026
18 Jun 2026
30 May 2026
13 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum stoney earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and leveling the bed upto the required depth and depositing the excavated materials away from the work site with all lead and lift including shoring, shuttering & dewatering (if required) with cost of all Labour, Hire & Running charges of the water pumps, Sundries, T & P required for the work complete in all respect excluding GST as directed by the Engineer- in- charge. | 0.2 | Cum | 311.53 | ₹62.31 |
| 2 | Filling in foundation and plinth with excavated materials etc including watering and ramming as directed by the Engineer-in-charge of earth work etc. | 0.2 | Cum | 173.07 | ₹34.61 |
| 3 | Filling in foundation and plinth with with clean coarse river sand including watering and ramming including cost & conveyance of all materials, labours, & T & P all taxes royalty etc complete in all respect as per direction of engineer in charge. | 0.6 | Cum | 521.23 | ₹312.22 |
| 4 | Providing Plain Cement Concrete (1:4:8) in foundation/floor bed concrete using 40 mm & below size b.h.c.b granite stone metal of approved quality from approved quarry including lowering laying concrete watering ramming &curing etc compacting to required level laid in layers not exceeding 4’’ thick including cost conveyance all taxes royalty &cost of all material & labours T&P required for the works etc complete in all respects as per the direction of Engineer in Charge | 1 | Cum | 5,545.72 | ₹5,540.17 |
| 5RCC work M/25 Grade having crushing strength of 250 kg/cm2 after 28 days curing as per using 12mm to 20 mm size b.h.c.b granite chips 20mm size not exceeding 25% including hoisting lowering laying concrete and compacting by using vibrators watering & curing for 28 days including centering, shuttering ,dismemdering to form work &finishing the exposed surface smooth providing grooves beads when ever necessary including cost, conveyance, taxes & royalty of all materials & cost of all labour T&P hire charges of concrete mixture machine & vibrator machine required for the work etc. complete in all respect but excluding the cost of M S rod or tor steel & binding wires & labour charges for cutting bending, binding & tying the grills. As per the direction of Engineer in charge. | |||||
| 5.01 | GROUND FLOOR
Column footing | 1 | Cum | 6,815.54 | ₹6,808.72 |
| 5.02 | Column Super Str. | 1 | Cum | 16,198.39 | ₹16,182.19 |
| 5.03 | (PLINTH BEAM)Frame BEAM for Ratproof slab Lev Beam (oo+/-)-1.20 Lev. | - | Cum | 7,689.96 | - |
| 5.04 | Wall Beam at 3.850m Lev. | - | Cum | 16,198.39 | - |
| 5.05 | Lintel at 2.10m Lev. | - | Cum | 14,529.26 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_593332.xls
BOQ • 0.35 MB
dtcn01.pdf
Tender Documents • 1.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .