Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹36,000
Closing Date
16 Oct 2021, 5:00 pmClosed
Executive Engineer PHE Mech. Rural Division
Executive Engineer PHE Mech. Rural Division
For fixing of rate contract for repairs to different types of damaged pumps and motors installed at various WSSs of District Ganerbal, Budgam and Srinagar
2021_PHE_139870_1
PHE/MRD/TS/ 52 of 09/2021
Open Tender
Miscellaneous Works
Item Rate
7 days
Executive Engineer PHE Mech. Rural Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer PHE Mech. Rural Division
₹36,000
Yes
20 Oct 2021
16 Sept 2021
18 Oct 2021
16 Sept 2021
16 Oct 2021
16 Sept 2021
Amount
Repairs to 3-Phase 5HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 7.5HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 10HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 12HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 15HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 17.5HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 20HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 25HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 30HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 40HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 45HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 50HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 60HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 75HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to 3-Phase 100HP Horizontal Motor by of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged fans as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Horizontal motor as per sample.
Repairs to Horizontal Pump having discharge from and above 3000GPH and below 10000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items: -
Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
Fabrication providing and fitting of Split type MS gland (Machined/Finished)
Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
Remetalling of bearing seats, and finishing to size for proper fitment of bearings
Remetalling of Pump shaft and finishing to size for proper fitment of bearings
Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
Providing and fitting of metallic Palmative packing
Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
Repairs to Horizontal Pump having discharge from and above 10000GPH and below 30000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items: -
Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
Fabrication providing and fitting of Split type MS gland (Machined/Finished)
Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
Remetalling of bearing seats, and finishing to size for proper fitment of bearings
Remetalling of Pump shaft and finishing to size for proper fitment of bearings
Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
Providing and fitting of metallic Palmative packing
Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
Repairs to Horizontal Pump having discharge from and above 30000GPH and below 50000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items: -
Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
Fabrication providing and fitting of Split type MS gland (Machined/Finished)
Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
Remetalling of bearing seats, and finishing to size for proper fitment of bearings
Remetalling of Pump shaft and finishing to size for proper fitment of bearings
Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
Providing and fitting of metallic Palmative packing
Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
Repairs to Horizontal Pump having discharge from and above 50000GPH and below 90000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items: -
Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
Fabrication providing and fitting of Split type MS gland (Machined/Finished)
Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
Remetalling of bearing seats, and finishing to size for proper fitment of bearings
Remetalling of Pump shaft and finishing to size for proper fitment of bearings
Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
Providing and fitting of metallic Palmative packing
Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
Replacement of MS Hub TC-series rubber tyre motor couplings ( complete assembly) of following sizes:-
Providing and fitting of rubber tyre part only to TC couplings of following sizes
Providing of metallic rope/gland packing of following thickness
Repairs to 3-Phase 25HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 30HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 40HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 45HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 50HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 60HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 75HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 100HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to 3-Phase 120HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. The job includes repairing / fabrication and providing / replacement of following items.
Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
Replacement of damaged Bearing Housing as per sample.
Replacement of damaged fan as per sample.
Repairs to Bearing Housing by way of remetalling, machining etc
Providing/fitting of connection plate for Vertical motor as per sample.
Repairs to VT Pump having discharge from and above 3000GPH and below 10000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
Line shaft (finished) out of SS-410 material as per sample
Head shaft (finished) out of SS-410 material as per sample
Rubber liner centre kit bush
Muff coupling (finished) out of SS-400 material as per sample
Gun metal gland bush (finished) as per sample
MS gland (finished) as per sample
Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
GM Wearing Ring (finished) as per sample
Cooling ring (finished) as per sample
Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
Check nut (finished) as per sample
Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
Cost of scrap copper dismattled windings
Repairs to VT Pump having discharge from and above 10000GPH and below 30000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
Line shaft (finished) out of SS-410 material as per sample
Head shaft (finished) out of SS-410 material as per sample
Rubber liner centre kit bush
Muff coupling (finished) out of SS-400 material as per sample
Gun metal gland bush (finished) as per sample
MS gland (finished) as per sample
Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
GM Wearing Ring (finished) as per sample
Cooling ring (finished) as per sample
Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
Check nut (finished) as per sample
Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
Cost of scrap copper dismattled windings
Repairs to VT Pump having discharge from and above 30000GPH and below 50000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
Line shaft (finished) out of SS-410 material as per sample
Head shaft (finished) out of SS-410 material as per sample
Rubber liner centre kit bush
Muff coupling (finished) out of SS-400 material as per sample
Gun metal gland bush (finished) as per sample
MS gland (finished) as per sample
Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
GM Wearing Ring (finished) as per sample
Cooling ring (finished) as per sample
Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
Check nut (finished) as per sample
Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
Cost of scrap copper dismattled windings
Repairs to VT Pump having discharge from and above 50000GPH and below 90000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
Line shaft (finished) out of SS-410 material as per sample
Head shaft (finished) out of SS-410 material as per sample
Rubber liner centre kit bush
Muff coupling (finished) out of SS-400 material as per sample
Gun metal gland bush (finished) as per sample
MS gland (finished) as per sample
Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
GM Wearing Ring (finished) as per sample
Cooling ring (finished) as per sample
Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
Check nut (finished) as per sample
Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
Cost of scrap copper dismattled windings
Replacement of damaged Ball/Thrust bearing for different capacity motors with below mentioned sizes of reputed make with all technical labour for disassembling/assembling, transportation/carriage, fitting the new bearing to both DE and NDE and reassembling of pumping unit thereof:
Bearing : 6308
Bearing : 6309
Bearing : 6311
Bearing : 6312
Bearing : 51220
Bearing : 6220
Bearing : 6311
Bearing : 7220
Bearing : 7214
Bearing : 7322
Bearing : 6313/C3
Bearing : N 313 ECP
Bearing : 6316
Bearing : 3310
Bearing : 6306
Bearing : 6312 2Z
Bearing : 6313 2Z
Bearing : 6311 2Z
Bearing : 6310 2Z
Bearing : 6315 ZZ
Bearing : 6316 ZZ
Bearing : 6408
Bearing : 7309
M/S ADIL ENGINEERING WORKS
SHAWL ENGINEERING WORKS
M/S TARUS TRADERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .