Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹4.9 Cr Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | ₹4.9 Cr | L1 |
| 2 | L2₹5.2 Cr+₹28.4 L (5.78%) Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | ₹5.2 Cr+₹28.4 L (5.78%) | L2 |
| 3 | L3₹5.3 Cr+₹35.9 L (7.32%) Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | ₹5.3 Cr+₹35.9 L (7.32%) | L3 |
| 4 | L4₹5.4 Cr+₹46.0 L (9.38%) Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | ₹5.4 Cr+₹46.0 L (9.38%) | L4 |
| 5 | L5₹5.7 Cr+₹79.3 L (16.2%) Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.) | ₹5.7 Cr+₹79.3 L (16.2%) | L5 |
Tender Value
₹6.2 Cr
EMD Value
₹12.5 L
Closing Date
21 Feb 2026, 3:00 pmClosed
EE(E)-I
Ravinder Pal
EE(E), DED-101, CPWD, North Block, New Delhi.
Special Repair/Replacement of VRF Air Conditioning System at AHQ Vayu Bhawan (Phase-II) (SH: 1. SITC of VRF AC system at AHQ Vayu Bhawan) (SH: 2. RMO VRF Central AC Plant installed at Air HQ, Vayu Bhawan.)
140244
47/CE/NDZ-1/DED-101/2025-26
OPEN
Electrical and Maintenance Works
NCB
6 months
North Delhi, Delhi
1 document required · 1 mandatory
₹12.5 L
In the chamber of CE, NDZ1, CPWD, New Delhi.
21 Feb 2026
17 Jan 2026
21 Feb 2026
21 Feb 2026
24 Jan 2026
24 Jan 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT47CENDZ-1DED101202526.pdf
document • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .