| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹41.0 L+₹2.0 L (5.17%)Rejected-Finance NO 15 KANNAGI NAGAR KORATTUR CHENNAI 600 080 | CHENNAI | CHENNAI | TAMIL NADU | 600080 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JAGAN ENTERPRISES L2 | KSM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation soil and depositing on bank with initial lead of 10m 100m and lift of 2m in Hard stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 237.85 | M3 | 150 ₹35,677.5 | 125 ₹29,731.25 Lowest |
| 2.00 | Transporting the surplus excavated earth , debris etc away from the site to lead of 5 KM including cost of all lead , lift, conveyyance , loading unloading etc.,complete.As department enigineer at site | 10 | M3 | 140 ₹1,400 | 120 ₹1,200 Lowest |
| 3.00 | Labour charges for Re-Filling the foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated of all labour, material, lead and lift etc., complete. as directed by the department at site. | 10 | M3 | 50 ₹500 | 43 ₹430 Lowest |
| 4.00 | Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 38.59 | M3 | 7,000 ₹2,70,130 | 6,756 ₹2,60,714.04 Lowest |
| 5.00 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 124.1 | M3 | 8,000 ₹9,92,800 | 7,700 ₹9,55,570 Lowest |
| 6.00 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal including form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 21.59 | M3 | 10,000 ₹2,15,900 | 9,400 ₹2,02,946 Lowest |
| 7.00 | Providing and laying R:C:C 1:1.5:3 with minimum cement content of 315Kg/cum using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. With form work | 44.91 | M3 | 11,500 ₹5,16,465 | 11,000 ₹4,94,010 Lowest |
| 8.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Column Below GL | 0.51 | M3 | 11,300 ₹5,763 | 11,250 ₹5,737.5 Lowest |
| 9.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Column Above GL | 1.09 | M3 | 11,900 ₹12,971 | 11,800 ₹12,862 Lowest |
| 10.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Wall | 12.15 | M3 | 14,000 ₹1,70,100 | 13,100 ₹1,59,165 Lowest |
Tender Value
₹37.6 L
EMD Value
₹37,600
Closing Date
10 May 2025, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2025_EB_552528_1
OT-011/25-26 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Thirunindravur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹37,600
Yes
26 Sept 2025
29 Apr 2025
12 May 2025
29 Apr 2025
10 May 2025
29 Apr 2025
Amount
Earth work excavation soil and depositing on bank with initial lead of 10m 100m and lift of 2m in Hard stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Transporting the surplus excavated earth , debris etc away from the site to lead of 5 KM including cost of all lead , lift, conveyyance , loading unloading etc.,complete.As department enigineer at site
Labour charges for Re-Filling the foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated of all labour, material, lead and lift etc., complete. as directed by the department at site.
Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal including form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying R:C:C 1:1.5:3 with minimum cement content of 315Kg/cum using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. With form work
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Column Below GL
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Column Above GL
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Wall
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Precast slab
Supplying and fabricating and placing in position of steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc. comlete as directed by the department engineer at site.
Fabrication, Supplying and fixing of 20mm dia GI Bolts & nutts of specified length threading for a length of 10cm at top and 15cm L at bottom and hot dip galvanising of bolt including supply of 2nos. of GI nuts & washers and fixing in the position as dir
Providing Grout holes for equipment structures including cost of all materials , form work , labour, cost of binding wire etc. comlete as directed by the department engineer at site.
Labour charges for assembling and re-fixing of template in correct position and alligenment for various equipment plinth and grouting the foundation bolt including cost of all material transport , labour,lead, lift etc, complete as directed by the dept. Engineer at site. (The templete will be make own arrangement by the contractor)
Supplying and providing 90 lbs rails in transformer plint and labour charges for fixing in correct position and aligenment as directed by dept.Engineer at site including cost of Rail, cutting charges , transport to site, labour, lead, lift etc. Complete as directed by the department engineer at site.
Plastering in CM 1:5 20 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
Supplying and fixing Gun Metal wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete as per standard specification and as directed by the department Engineer at site. 32 mm dia
Supplying and fixing Gun Metal wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete as per standard specification and as directed by the department Engineer at site. 25 mm dia
Supplying and fixing Gun Metal wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete as per standard specification and as directed by the department Engineer at site. 20 mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 32mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 25 mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 20 mm dia
Levelling the ups and downs of the location by engaging JCB for marking of foundations etc., with all hire charges as directed by the department at site.
providing and laying of 900mm dia NP3 Hume pipes confirming to IS 458/ 2003 at required intervels at required layers as directed by the department at site.
Painting 2 coats with plastic Emulsion paint over one coat of priming coat of plastic emulsion paint over cement plastered wall surface , celling and other new surface and including cleaning , preparing the surface and curinng all materials, scoffolding, labour with all lead, lift etc., complete as per specification and as directed and approved by the dept engineer at site
Dismantling of existing PCC in the ground level during execution including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Dismantling of existing RCC in the ground level during execution including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Dismantling of Brick / Stone masonry in cement mortar removing the debris away from the site including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Supplying, fabrication of MS channel including cost of GI angle, flats as per drawing and specification and galvanising placing in position including cost of angle including cost of all materials, transport, labour, lead etc., complete as directed by the department engineer at site.
Filling with good quality gravel including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site.
Filling with stone dust including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site.
Filling with 20 mm B.G metal including cost of all labour, materials, transport, leads, lift,etc., complete and as directed by the department engineer at site.
Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 12mm thick to full width and depth of 150mm thick plastering with CM 1:3, 20mm thick plasterining ncluding cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site.
Supplying & fixing PVC coated chain link fencing 50X50mm square (12G) of 1.80m ht including cost of GI binding wire all materials , transport, leads, lift,etc., complete and as directed by the department engineer at site.
Supplying & fixing Ms grill gates , MS Grills, name bord, hand rail , lader etc., at various levels as per approved drawing using channel, squar rods, ornamental grill parts and flat including fixing in position with suitable hold fast locking arrangements etc.,as directed by the department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
JAGAN ENTERPRISES (BID ID -1331321)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .