Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC A | |
| 2 | L2₹2.3 L+₹4,187.20 (1.83%)Rejected-AOC VILLAGE DHABKI GUJJAR DISTT SAHARANPUR UTTAR PRADESH | SAHARANPUR | UTTAR PRADESH | 247001 | L2 | Rejected-AOC A |
| Sl No | Description | Qty | Unit | M/S SHIV GORAKH CONSTRUCTION L2 | PREM DEVCHAUDHARY ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds. | 1,303 | nos | 35 ₹45,605 | 34.3 ₹44,692.9 Lowest |
| 2.00 | Earth Work in Silt Clearance i/c lift up to 1.5 M and lead up to 30M i/c ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks. | 954.8 | cum | 45.6 ₹43,538.88 | 45.08 ₹43,042.38 Lowest |
| 3.00 | Scrapping of internal section of Existing channel i.c Bed & slope with silt upto 5cm. | 20,980 | sqm | 4.55 ₹95,459 | 4.51 ₹94,577.84 Lowest |
| 4.00 | Cleaning thick bushes and throny jungle without uprooting. | 7,380 | sqm | 4.5 ₹33,210 | 4.31 ₹31,822.56 Lowest |
| 5.00 | Video Graphy/Photography of Silt Clearance works in canal and drains before & after Silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer-in-charge. | 8.2 | per km | 1,250 ₹10,250 | 1,200 ₹9,840 Lowest |
| 6.00 | Painting & Letter Writing on Old Iron Sign Board i/c all cost of material, labour, T & P etc. | 1 | nos | 4,600 ₹4,600 | 4,500 ₹4,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
22 May 2026, 11:00 amClosed
EE LOWER DIVISION YAMUNA CANAL SHAMLI
EE LOWER DIVISION YAMUNA CANAL OFFICE SHAMLI.
04- SILT CLEARANCE OF DOGAT MR. FROM KM. 00.00 TO KM. 8.200.
2026_UPIDC_1149312_4
C-29/03/EE/2026-27 DT 15.05.2026
Open Tender
Civil Works
Item Rate
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹25,000
5 Jun 2026
16 May 2026
22 May 2026
16 May 2026
22 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds. | 1,303 | nos | - | - |
| 2 | Earth Work in Silt Clearance i/c lift up to 1.5 M and lead up to 30M i/c ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks. | 954.8 | cum | - | - |
| 3 | Scrapping of internal section of Existing channel i.c Bed & slope with silt upto 5cm. | 20,980 | sqm | - | - |
| 4 | Cleaning thick bushes and throny jungle without uprooting. | 7,380 | sqm | - | - |
| 5 | Video Graphy/Photography of Silt Clearance works in canal and drains before & after Silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer-in-charge. | 8.2 | per km | - | - |
| 6 | Painting & Letter Writing on Old Iron Sign Board i/c all cost of material, labour, T & P etc. | 1 | nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
BOQ_2151646.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .