Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
21 Apr 2026, 4:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ELECT.G
17 conditions · 6 needing a document upload
Financial Eligibility Criteria: (Ref: RB letter No. 2022/CE-I/CT/GCC- 2022/POLICY : Advance Correction Slip No.-1 dt 14.07.2022) The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tender should have a valid Electrical contractor license from the concerned statutory authority. The above said Electrical contractor license is to be submitted along with the offer otherwise the offer shall be summarily rejected. OR OEM (Original equipment manufacturer) shall submit valid Electrical contractor license in name of their executing agency for carrying out the work at the time of agreement signing otherwise the offer shall be summarily rejected.
All requisite documents mentioned in clause 3.7 of the tender document attached pertaining to constitution of firm/concern. (As applicable).
34 conditions · 5 needing a document upload
The rate to be quoted by tenderer shall be inclusive of all state/central taxes including GST. THE TENDERER SHOULD UPLOAD VALID GST REGISTRATION CERTIFICATE ALONG WITH THE OFFER.
The tender shall comply with General Condition of contract (GCC),2022 of Indian Railways (file attached). and its latest amendment, if any. The tenderer shall submit the offer after duly satisfying himself/herself with the GCC,2022 in general.
Tenderers are required to upload the Bank details as per Annexure-XII (Real Time Gross Saving (RTGS)/National Electronic Fund Transfer (NEFT) Model Mandate Form)of tender document.
Tenderers are required to upload the requisite details as per Tender form-4A (STATEMENT OF WORKS EXECUTED/COMPLETED BY THE TENDERER/S DURING LAST SEVEN YEARS ENDING LAST DAY OF MONTH PREVIOUS TO THE ONE IN WHICH TENDER IS INVITED FROM THE DATE OF PUBLISHING OF TENDER)of tender document.
Tenderers are required to upload requisite details as per Annexure-VII B(DETAILS OF CONTRACTUAL PAYMENT RECEIVED IN LAST THREE FINANCIAL YEARS AND CURRENT FINANCIAL YEAR) without which the offer is liable to be rejected.
Tenderers are compulsorily required to upload Affidavit as per Annexure-XXIV along with tender document, without which the offer will be considered incomplete and will be rejected summarily.
All requisite documents/credentials mentioned in clause 3.5 of the tender document attached pertaining to his/their technical and financial eligibility. (As applicable).
All requisite documents mentioned in clause 3.7 of the tender document attached pertaining to constitution of firm/concern. (As applicable).
i)After opening of tender, any document/credential pertaining to technical, financial eligibility and available Bid Capacity constitution of firm etc. shall neither be asked nor be entertained/ considered under any circumstances and no claim or representation whatsoever from the tenderer in this regard shall be entertained. Scanned copy of the documents, uploaded by the tenderer shall be clear & readable. However Railway reserves the right to ask for any clarification on the documents/credentials already submitted by the tenderer along with the offer. ii)Tenderer may have to produce the original Documents in physical form at short notice whenever asked by Railway at any stage of tender evaluation process or even after finalization of tender. iii)In E-tender, all submissions of documents are to be uploaded on web-site. There may be last minute hic-cups and delay in uploading the Documents and payment of Earnest Money etc. Tenderer's/Prospective bidders are advised to upload their offer well in time. Railway will not be responsible for any delay/non submission of offer due to any reason whatsoever.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenderer/s shall be treated as Null & Void.
No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenderer/s shall be treated as Null & Void.
The rate to be quoted by tenderer shall be inclusive of all state/central taxes including GST. tenderer shall submit GST certificate along with the offer.
This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no. 2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017.
IF ANY DISCREPANCY IS FOUND IN THE TENDER DOCUMENT, NAMELY SOR ITEM DESCRIPTION, SPECIAL TENDER CONDITION ETC., CLARIFICATION CAN BE SOUGHT FROM THE OFFICE OF SRDEE/G/DLI, DRM OFFICE, STATE ENTRY ROAD, NEW DELHI.
This tender complies with Railway Board instructions for Startups (recognized by Department of Industrial Policy and Promotion, Ministry of Commerce and Industry) for exemption from payment of Bid Security as detailed in GCC 2022 as amended from time to time. Such Startup firms may note that no other exemption is applicable to them in this particular tender.
On account payment, contractor shall submitted indemnity bond with validity up to the completion/extended period in the prescribed format (please refer Annexure-W) at the contractor's cost, vesting the ownership of such material with the railways.
This tender shall also complies with "Indian Railways Standard General Conditions of Contract, April 2022 (Advance Correction Slip No. 11)" vide Railway Board letter No. 2022/CE-I/CT/GCC- 2022/POLICY/Pt.I (E-3320424), dated: 13.03.2026 (attached)
Design, Supply, Installation, Testing and Commissioning of Rooftop type Solar Plants with other allied works at stations, service buildings, residential buildings and LC gate in the sections of DUK, MTC & SMQL of Delhi Division along with CAMC for five years.
73-SRDEE-G-DLI-2025-26
73-SRDEE-G-DLI-2025-26
Open
Works - General
9 Months
Delhi, Delhi
₹0
₹9.6 L
21 Apr 2026
30 Mar 2026
7 Apr 2026
13 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,81,02,962 | ||
| — | 778.00 | — | — | ||
| Design, supply, installation, testing and commissioning of ON GRID solar photovoltaic power plants with required solar PV modules, MS Hot dipped Galvanized structure for mounting of panels /on the platform shelters, sheds /service buildings suitably strengthening the supporting structures as per site condition, suitable power conditioning units able to adjust voltage and frequency level to suit the grid voltage frequency, Array and main junction boxes with IP65 protection, required AC & DC distribution boards with switchgear , armoured power and control cables, remote data monitoring system, EB approved Bi- directional energy metering system, Earthing arrangements, suitable lightning and surge protection etc., as per detailed specifications including all necessary works, accessories as per site conditions. Tentative list of locations and capacity of solar plants are enclosed. Liasoning, registration and inspection charges of EB to be born by contractor. Sites to be surveyed for feasibility and GADs to be submitted for approval before starting of work. | — | — | — | 4,50,29,084 | |
| — | 778.00 | — | — | ||
| Comprehensive Annual maintenance contract for the complete roof top solar installation including preventive and breakdown maintenance for the first year subsequent to expiry of warranty. | — | — | — | 5,43,822 | |
| — | 778.00 | — | — | ||
| Comprehensive Annual maintenance contract for the complete roof top solar installation including preventive and breakdown maintenance for the second year subsequent to expiry of warranty. | — | — | — | 5,91,280 | |
| — | 778.00 | — | — | ||
| Comprehensive Annual maintenance contract for the complete roof top solar installation including preventive and breakdown maintenance for the third year subsequent to expiry of warranty. | — | — | — | 6,21,622 | |
| — | 778.00 | — | — | ||
| Comprehensive Annual maintenance contract for the complete roof top solar installation including preventive and breakdown maintenance for the fourth year subsequent to expiry of warranty. | — | — | — | 6,45,740 | |
| — | 778.00 | — | — | ||
| Comprehensive Annual maintenance contract for the complete roof top solar installation including preventive and breakdown maintenance for the fifth year subsequent to expiry of warranty. | — | — | — | 6,71,414 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TECH SPEC I MNRE
ATTACHMENT
ALMMOrderList.pdf
ATTACHMENT
GCC-2022-ACS10_merged_1.pdf
ATTACHMENT
SPECIAL CONDITIONS
ATTACHMENT
TENDER DOCUMENT
ATTACHMENT
Tentative site location
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11.pdf GCC ACS No 11
ATTACHMENT
TECHSPEC-IMNREPART-APART-B_1.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11.pdf
ATTACHMENT
SpecialCondition-73-SOLAR-DUK-MTC-SMQL.pdf
ATTACHMENT
TenderDocument-73-SOLAR-DUK-MTC-SMQL.pdf
ATTACHMENT
TentativeSiteofSolarInstallation-73.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .