| 1 | L1₹5.3 LAccepted-AOC NO 28 KUTHIRAI KATTI STREET KARUNTATTANKUDI THANJAVUR 613 002 | THANJAVUR | THANJAVUR | TAMIL NADU | 613002 | ₹5.3 L | L1 | Accepted-AOC LER |
| 2 | L2₹5.3 LRejected-Finance | ₹5.3 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Ramprasath L1 | Sivagurunathan L2 |
|---|---|---|---|---|---|
| 1.00Construction of Waiting Shed @ Mayanam in Mariyammankovil panchayat. | |||||
| 2.00 | Earth work excavation in all classess of except hard rock requiring blasting with initial lead and lift etc., Complete for foundation as per SS 20B. | 14.17 | Cum | 262.9 ₹3,725.29 Lowest | 265.75 ₹3,765.68 |
| 3.00 | Supplying and filling with good M.Sand including cost , conveyance and labour charges etc., | 4.12 | Cum | 2,254.2 ₹9,287.3 Lowest | 2,256.75 ₹9,297.81 |
| 4.00 | Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 7.2 | Cum | 529.7 ₹3,813.84 Lowest | 532.75 ₹3,835.8 |
| 5.00 | C.C 1:4:8 mix using 40mm HBG Metal including cost and conveyance and labour charges etc.Complete. | 4.12 | Cum | 6,043.4 ₹24,898.81 Lowest | 6,045.75 ₹24,908.49 |
| 6.00 | R.C.C ( 1:11/2:3 ) mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc.Complete. | 8.98 | Cum | 9,765.1 ₹87,690.6 Lowest | 9,767.75 ₹87,714.4 |
| 7.00 | Supply and Fabrication and placing in Position of Steel rods including cost and conveyance of all materials labour charges etc.Complete. | 0.79 | Mt | 91,857.6 ₹72,200.07 Lowest | 91,860.75 ₹72,202.55 |
| 8.00 | Best Steel centering using GI Sheet and L angle including cost and conveyance and labour charges etc.Complete. (Below basement) | 16.59 | Sqm | 546.6 ₹9,068.09 Lowest | 549.75 ₹9,120.35 |
| 9.00 | Best Steel centering using GI Sheet and L angle including cost and conveyance and labour charges etc.Complete. (Above basement) | 56.99 | Sqm | 1,094.1 ₹62,352.76 Lowest | 1,096.75 ₹62,503.78 |
| 10.00 | B.W. in cm 1:5 mix using country bricks of size 8 3/4 x4 1/4 x 2 1/4 including cost and conveyance and labour charges etc.,complete (Upto Basement) | 4.34 | Cum | 6,245.4 ₹27,105.04 Lowest | 6,247.75 ₹27,115.24 |
Tender Value
₹5.4 L
EMD Value
₹5,390
Closing Date
3 Mar 2026, 3:00 pmClosed
Block Development Officer (BP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District - Thanjavur Block - Construction of Waiting Shed at Mayanam in Mariyammankovil panchayat under MLACDS 2025-2026
2026_RDTN_666696_1
Rc.No. 2463/2025/A2 Dated 23.02.2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thanjavur
As per Tender bid document
2 documents required · 2 mandatory
₹0
₹5,390
30 Jul 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Waiting Shed @ Mayanam in Mariyammankovil panchayat. | - | - | - | - |
| 2 | Earth work excavation in all classess of except hard rock requiring blasting with initial lead and lift etc., Complete for foundation as per SS 20B. | 14.17 | Cum | - | - |
| 3 | Supplying and filling with good M.Sand including cost , conveyance and labour charges etc., | 4.12 | Cum | - | - |
| 4 | Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 7.2 | Cum | - | - |
| 5 | C.C 1:4:8 mix using 40mm HBG Metal including cost and conveyance and labour charges etc.Complete. | 4.12 | Cum | - | - |
| 6 | R.C.C ( 1:11/2:3 ) mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc.Complete. | 8.98 | Cum | - | - |
| 7 | Supply and Fabrication and placing in Position of Steel rods including cost and conveyance of all materials labour charges etc.Complete. | - | Mt | - | - |
| 8 | Best Steel centering using GI Sheet and L angle including cost and conveyance and labour charges etc.Complete. (Below basement) | 16.59 | Sqm | - | - |
| 9 | Best Steel centering using GI Sheet and L angle including cost and conveyance and labour charges etc.Complete. (Above basement) | 56.99 | Sqm | - | - |
| 10 | B.W. in cm 1:5 mix using country bricks of size 8 3/4 x4 1/4 x 2 1/4 including cost and conveyance and labour charges etc.,complete (Upto Basement) | 4.34 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_800875.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].