Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Finance NARANARAYAN ROAD P O DIST COOCH BEHAR PIN CODE 736101 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | L1 | Admitted-Finance | ||
| 2 | L2₹9.7 L+₹1,941.35 (0.20%)Admitted-Finance 1206 LASKARHAT TAGORE PARK BL D 1ST FLOOR KOLKATA 700039 | KOLKATA | KOLKATA | WEST BENGAL | 700039 | L2 | Admitted-Finance | ||
| 3 | L3₹9.8 L+₹12,133.46 (1.25%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹19,414
Closing Date
14 Oct 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL EXECUTIVE OFFICER
COOCH BEHAR ZILLA PARISHAD
Construction of Fencing of 20 KLD FSTP at Dinhata-I Development Block under Cooch Behar Zilla Parishad.
2026_ZPHD_5075370_2
WBZP/09/DE-ET/COB/2026-27(2nd Call)
Open Tender
CIVIL WORKS
Percentage
60 days
COOCH BEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,414
COOCH BEHAR ZILLA PARISHAD
27 Oct 2026
28 Sept 2026
14 Oct 2026
28 Sept 2026
14 Oct 2026
28 Sept 2026
13 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)| manual means over areas (exceeding 30 cm in depth, 1.5 min width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 20.67 | cum | 205.51 | ₹4,247.88 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 4.13 | cum | 226.93 | ₹937.22 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lIll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Ground Floor | 6.11 | cum | 9,657.04 | ₹59,004.49 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Ground Floor | 8.1 | cum | 9,121.73 | ₹73,885.99 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns | 121.26 | sqm | 454.03 | ₹55,055.83 |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,252.95 | kg | 135.87 | ₹3,06,103.43 |
| 7 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in- charge.
Made of G.I. wire of dia 4 mm | 306 | sqm | 1,178.41 | ₹3,60,593.11 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-IIl) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Ground Floor | 1.67 | cum | 10,473.17 | ₹17,490.19 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Ground Floor | 0.45 | cum | 12,565.55 | ₹5,654.5 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Columns, piers, abutments, pillars, posts and struts | 6 | sqm | 1,112.99 | ₹6,677.96 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
OID.pdf
Other Document • 0.06 MB
EMD.pdf
Additional Documents • 0.00 MB
BOQ_5165831.xls
BOQ • 0.35 MB
TenderCommitteeNEW.pdf
PDF • 0.21 MB
TenderCommitteeNEW.pdf
PDF • 0.21 MB
TenderCommitteeNEW.pdf
PDF • 0.21 MB
TenderCommitteeNEW.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .