| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAdmitted-Finance 52 A CUDDALORE ROAD VRIDDHACHALAM 606 001 CUDDALORE DIST | VRIDDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | L1 | Admitted-Finance | |
| 2 | L2₹41.8 L+₹4.8 L (12.9%)Admitted-Finance 11 B EAST VEERAPANDIYAN STREET VIRUDHACHALAM 606001 | VIRUDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Samsudeen L2 | ZIYAVUDEEN L1 |
|---|---|---|---|---|---|
| 1.00SCHEDULE -A | |||||
| 2.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 495 | Cum | 180 ₹89,100 | 150 ₹74,250 Lowest |
| 3.00 | Supplying and filling M.Sand sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete | 18 | Cum | 1,500 ₹27,000 | 1,300 ₹23,400 Lowest |
| 4.00 | PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 17 | Cum | 5,800 ₹98,600 | 5,000 ₹85,000 Lowest |
| 5.00 | PCC 1:2:4, with 20mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 8 | Cum | 7,200 ₹57,600 | 5,100 ₹40,800 Lowest |
| 6.00 | PCC 1:2:4, with 20 mm HBG m/c metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 2 | Cum | 8,300 ₹16,600 | 5,500 ₹11,000 Lowest |
| 7.00 | RCC M20, mix, with 12 to 20mm HBG m/c metal with out form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.(Raft foundation) | 70 | Cum | 9,500 ₹6,65,000 | 8,500 ₹5,95,000 Lowest |
| 8.00 | RCC M20, mix, with 12 to 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete. | 22.5 | Cum | 12,999 ₹2,92,477.5 | 10,900 ₹2,45,250 Lowest |
| 9.00 | Refilling with excavated earth other than sand and consolidation as per standard specification etc. complete. | 360 | Cum | 42 ₹15,120 | 19 ₹6,840 Lowest |
| 10.00 | Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete. | 5,550 | Kg | 101 ₹5,60,550 | 89 ₹4,93,950 Lowest |
Tender Value
Refer Docs
EMD Value
₹40,600
Closing Date
9 Jul 2025, 2:00 pmClosed
AEE GL GCC TRICHY
OFFICE OF THE SE GCC TRICHY
Establishment of standby energy metering at 230 KV GT bay in 230KV switch yard and metering room under DCW basis chargeable to existing M/S TAQA 250MW IPP Uthangal Cuddalore EDC
2025_EB_572715_1
GCC 015 GL 002 2025 2026
Open Tender
Civil Works
Works
90 days
UTHANGAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,600
Yes
6 Aug 2025
23 Jun 2025
10 Jul 2025
23 Jun 2025
9 Jul 2025
23 Jun 2025
Amount
SCHEDULE -A
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.
Supplying and filling M.Sand sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete
PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
PCC 1:2:4, with 20mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
PCC 1:2:4, with 20 mm HBG m/c metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
RCC M20, mix, with 12 to 20mm HBG m/c metal with out form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.(Raft foundation)
RCC M20, mix, with 12 to 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.
Refilling with excavated earth other than sand and consolidation as per standard specification etc. complete.
Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with CM 1:3-12mm thick for wall both interior and exterior faces including cost of all materials lead lift etc complete.
Colour washing two coats with Ultima paint over one coat of white cement primer for outside wall including cost of all materials, labour, lead, lift, etc., complete.
Supply and Labour charges for providing 25 mm dia pipe type earthing with GI Pipe on earth strips all labour lead, lift etc., complete.
Assembling of T4 type tower template with stubs & cleats to correct level and alignment including shifting of template from Location to location and reassemblilng etc including cost of all labour, lead ,lift etc, complete.
Fabrication and supplying of 20mm dia Bolt and nut of length 2.10 m, threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of template, all material, labour, lead, lift etc., complete
Labour charges for setting of template set for T1S/T5/T4 type columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete
Labour charges erection of structure parts including cutting , drilling holes , galvanizing as per IS 2629-1985 and IS 4759 -1966 with hot dip process as per Technical specification and bending as directed by the engineer in charge of the work including cost of all materials , galvanizing charges ,all labour ,lead and lift etc. complete.
Fabrication and supplying of 56 dia M28 / M20 foundation Bolt and nut of length 1.80m,threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of template, all material, labour, lead, lift etc., complete
Supply and erection of truss work for cladding and roofing as per the design using IS steel hollow sections with all accessories and as per the direction of the engineer at site including cost of transport, all labour, lead,lift etc., complete.
Supplying and fixing of 3mm thick Cement sheet on the fabricated trusses as directed by the engineer at site including cost of transport, all labour, lead,lift etc., complete.
Supply and transporting aligning and erection of RCC fencing posts Viz. corner post, post as directed by the site engineer including all labour lead lifts etc complete
Supply and fixing of 50 Sq.mm GI Chain link fencing of 9 gauge with standard width of 2.40m height including cost of all material, labour for fixing, transportion, lead, lift, etc., complete.
SCHEDULE -B
Supply of Tower Parts, Bolts & Nuts as Per IS and technical specification including transport Charge etc complete.Fabrication, galvanising and supply of various type of tower parts and tower body/leg extensions & (complete excluding bolts, nuts and stubs) and including transport charges, hangers, D-shackles, and all taxes etc.
Supply of Hot dipped GI bolts & nuts including step bolts and electro-galvanised spring Washers as per relevant latest IS for towers, extensions, stubs including transport charges and all Taxes etc complete
Samsudeen (BID ID -1396219)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .