Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-Finance | ₹2.9 Cr | L1 | Accepted-Finance accepted |
| 2 | L2₹2.9 CrAccepted-Finance | ₹2.9 Cr | L2 | Accepted-Finance accepted |
| 3 | L3₹3.3 CrAccepted-Finance | ₹3.3 Cr | L3 | Accepted-Finance accepted |
Tender Value
₹3.0 Cr
EMD Value
₹6.1 L
Closing Date
1 Aug 2026, 3:00 pmClosed
Executive Engineer, CD-XIII. I and FC Deptt.
Executive Engineer, CD-XIII. I and FC Deptt.
Construction of Road from intersection point of Kair village and Mundella Kalan village towards B.C Drain upto Jagrat Pur village (Haryana Border) in Najafgarh, AC 35.
2026_IFC_295806_1
EE/CD-XIII/Acs./2025-26/NIT No. 60 (3rd Call)
Open Tender
Civil Works
Works
90 days
Najafgarh
Please refer Tender Document
8 documents required · 8 mandatory
₹0
₹6.1 L
1 Aug 2026
23 Jul 2026
1 Aug 2026
23 Jul 2026
1 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and filling building rubbish in trenches, plinth, road in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering with all lead and lifts. | 118 | Cum | 470.43 | ₹55,510.74 |
| 2 | Supply of earth including royality, excavation, and carriage earth by mechanical transport upto all lead & lifts and banking the same in layers not exceeding 20 cm. in depth breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers and dressing up embankments for road, flood banks, marginal banks and guide banks or filling up ground depression. | 108 | Cum | 663.65 | ₹71,674.2 |
| 3 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level :
(Note:- The cement considered In RMC 10 is 220Kg/Cum. If any deviation in quantity on lower side is observed subject to approval of Job Mix formula by engineer-in-charge, a recovery of cement @ Rs. 10 per Kg. will be deducted. RMC M-10 with cement content less than 200 KG/cum shall be rejected. Excess cement used more than 220 kg/cum will not be paid) | 1,012 | Cum | 8,854.49 | ₹89,60,743.88 |
| 4 | Providing and laying (RMC) of M-30 grade by using minimum 400 kg of cement ( 43 grade O.P.C) per cum of concrete, in roads/streets using manufactured in automatic RMC using coarse sand and graded stone aggregate of 20 mm nominal size in appropriate as per approved design criteria, including transportation to site in transit mixer, including cost of so mixture in recommended proportion as per IS 9103 to accelerates / retard setting of concrete to improve workability with out impairing strength and durability as per specification including spreading and compacting mechanically using needle and surface vibrators, leveling to required slope & camber, finishing by floating & brooming with wire brushes etc and curing including making provision for contraction expansion construction of cross longitudinal joints (10mm wide x 50 mm deep) by groove cutting machine providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer in- charge ( Cost of joint filler & sealants shall be paid for separately under relevant items ).
(Note:- The cement considered in RMC-30 is 400Kg/Cum. If any deviation in quantity on lower side is observed subject to approval of Job Mix formula by engineer-in-charge, a recovery of cement @ Rs. 10 per Kg. will be deducted RMC M-30 with cement content less than 360 KG/cum shall be rejected. Excess cement used more than 400 kg/cum will not be paid). | 2,024 | Cum | 10,549.66 | ₹2,13,52,511.84 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_393595.xls
BOQ • 0.26 MB
NIT60fy2526.pdf
Tender Documents • 1.51 MB
PWD6Corrigendum60.pdf
PDF • 0.64 MB
corridendum60Date.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].