Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.3 L
EMD Value
₹8,400
Closing Date
16 Oct 2026, 2:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ZONAL OFFICER-3
Greater Chennai Corporation Aminity Buildng, CMDA Truck Terminal Madhavaram,Chennai-600060
Repair and Improvements work for RRC centre at Secretriate officer colony in Div-25, Unit-7, Zone-3
2026_CoC_711173_1
Z.O.III.C.NO.E1/6428/2026
Open Tender
Civil Works
Works
120 days
CHENNAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,400
6 Oct 2026
6 Oct 2026
16 Oct 2026
6 Oct 2026
16 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling - Brick / Stone Masonry in cement mortar walls under 3m high | 10 | CUM | 302.96 | ₹3,029.6 |
| 2 | Charges for developing the Borewell with air compr...e Borewell with air compressor of 600 CFM capacity | 1 | NOS | 3,090.37 | ₹3,090.37 |
| 3 | Installation of Vertical Bored cast in situ RCC pi...eparately ) Grade of Concrete: M25 450 mm dia pile | 62 | R/M | 2,358.13 | ₹1,46,204.06 |
| 4 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 4 | CUM | 368.55 | ₹1,474.2 |
| 5 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers | 2 | CUM | 391.95 | ₹783.9 |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means | 2 | CUM | 7,255.21 | ₹14,510.42 |
| 7 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 1,233 | KGS | 96.53 | ₹1,19,021.49 |
| 8 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION | 26 | SQM | 756.34 | ₹19,664.84 |
| 9 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMN | 49 | SQM | 669.67 | ₹32,813.83 |
| 10 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials) | 6 | CUM | 8,197.92 | ₹49,187.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
6428.pdf
Tender Documents • 1.61 MB
BOQ_854404.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .