| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹30.2 L+₹1,676 (0.06%)Rejected-Finance | L2 | Rejected-Finance Above Amount |
| Sl No | Description | Qty | Unit | SRINIVAS CONSTRUCTION L2 | mitesh construction L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 254 | M3 | 6,59,892 ₹6,59,892 | 6,59,384 ₹6,59,384 Lowest |
| 2.00 | Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification | 180 | M3 | 5,17,500 ₹5,17,500 Lowest | 5,17,500 ₹5,17,500 Lowest |
| 3.00 | Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502 | 1,796 | M2 | 1,47,810.8 ₹1,47,810.8 | 1,47,272 ₹1,47,272 Lowest |
| 4.00 | Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification | 1,796 | M2 | 34,483.2 ₹34,483.2 | 34,124 ₹34,124 Lowest |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5 | 90 | M3 | 10,04,220 ₹10,04,220 Lowest | 10,04,220 ₹10,04,220 Lowest |
| 6.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 54 | M3 | 6,34,770 ₹6,34,770 | 6,34,500 ₹6,34,500 Lowest |
| 7.00 | Providing and laying US Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH | 27 | M3 | 18,900 ₹18,900 Lowest | 18,900 ₹18,900 Lowest |
Tender Value
₹36 L
EMD Value
₹36,000
Closing Date
20 May 2025, 3:00 pmClosed
Executive Officer
27-1, Kamaraja Nagar, Swamimalai
Formation of BT Road at Chandra nagar I, Chandra Nagar II, SSR Nagar Main, SSR nagar I Cross, SSR Nagar II Cross, Abinaya Nagar extention, Abinaya Nagar extention I cross and Jayam nagar in Swamimalai Town Panchayat
2025_DTP_557354_1
168/2025
Open Tender
Civil Works - Roads
Works
90 days
Swamimalai Town Panchayat
See The Tender Notice
3 documents required · 3 mandatory
₹0
₹36,000
Yes
Swamimalai Town Panchayat
24 Sept 2025
13 May 2025
20 May 2025
13 May 2025
20 May 2025
13 May 2025
13 May 2025 - 20 May 2025
14 May 2025
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification
Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502
Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying US Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
SRINIVAS CONSTRUCTION (BID ID -1343034)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .