| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC MD 1 236 SECTOR D1 LDA COLONY KANPUR ROAD LUCKNOW U P PIN 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹27.5 L+₹2.2 L (8.57%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹27.9 L+₹2.6 L (10.2%)Rejected-Finance 123 2 H 16 ACHARYA PRAFULLA CHANDRA ROAD MANICKTALLA KOLKATA WEST BENGAL 700006 | KOLKATA | WEST BENGAL | 700006 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹28.4 L+₹3.1 L (12.2%)Rejected-Finance A 1 DEEPMALA BUNGLOW CADILLA ROAD GODASAR AHMEDABAD CITY | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹28.5 L+₹3.2 L (12.6%)Rejected-Finance | L5 | Rejected-Finance Other than lowest |
Tender Value
₹36.5 L
EMD Value
₹73,000
Closing Date
30 May 2022, 6:00 pmClosed
GE West Lucknow
GE West Lucknow, 11 Sardar Patel Marg, Lucknow Cantt - 226002
SPL REPAIR TO ROOF TREATMENT AT BLDG NO 1B, 2B, 3B, 4B, 2, 3, 1A, 3A AND 4 AT CARIAPPA ENCLAVE UNDER GE (WEST) LUCKNOW
2022_MES_521539_1
GE/W/LKO/15OF 2022-23
Open Tender
Civil Works
Item Rate
180 days
Lucknow
As per NIT and Tender Documents
9 documents required · 9 mandatory
₹500
GE West Lucknow
₹73,000
Yes
15 Jun 2022
2 May 2022
1 Jun 2022
2 May 2022
30 May 2022
16 May 2022
2 May 2022 - 9 May 2022
Amount
Taking down cement or cement lime plaster on brick or stone walls etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed.
Material and Labour for rendering 15mm thick in CM 1:6 on brick work or concrete surface and finishing the surface even and smooth without using extra cement complete all as specified and directed..
Material and Labour for rendering 15 mm thick cement plaster in CM 1:4 with water proofing compound (@ 2% by weight of cement) on fair faces of brick work or concrete surface and finishing the surface even and smooth without using extra cement all as specified and directed. (Note:- Water proofing compound shall be measured and paid seprately.)
Supply only integral water proofing compound conforming to IS 2645 complete all as specified and directed.
Material and Labour for preparing new plastered surface of walls and applying two coats of distemper oil emulsion of approved shade over a coat of chalk whitening complete all as specified and directed.
M & L for plain cement concrete 1:2:4 type B-0 (using 12.5mm graded stone aggregate) at roof top for roof padding/ roof kerbs/ benching/ coving rounded or chamfered on edges complete all as specified and directed.
M & L for provision of roof treatment with polymeric water proofing membrane as specified here under :- (a) Taking down existing water proofing treatment and cleaning roof surface by washing and rubbing etc. and removing the material retrieved to a distance not exceeding 500 m where directed. (b) Applying a coat of bituminous primer conforming to IS : 3384-1986 @ 0.40 Iitres/sqm on prepared surface and allowed to dry. (c) Applying and laying 3mm thick APP membrane having non woven polyester matt at core and covered with high quality polymeric asphaltic protected thermo fusible HMHDPE film on both sides with over laps 10cm and 15 cm at longitudinal and transverse direction respectively and sealed by flame, sealing all overlaps complete including treatment at all junctions and corners. The membrane shall be torched into groove on vertical plane and groove sealed with cement mortar 1:3. (d) M & L for two coats of aluminium paint @ 0.10 litre/Sqm (each coat) on membrane surface all as specified and directed. Note:- (i) PCC padding or rendering for leveling of undulations on roof shall be measured and paid separately (ii) For filling undulation or levelling either PCC or rendering shall only be allowed for payment purpose.
Material and Labour for rendering 10mm thick in CM 1:3 on roof surface/parapet (using 100% coarse sand) with using water proofing compound (@ 2% by weight of cement and finishing the surface even and smooth without using extra cement complete all as specified and directed. (Note:- Water proofing compound shall be measured and paid seprately.)
Material and Labour for preparation of newly plastered surface of wall and finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) complete all as specified and directed
Material and Labour complete removal of existing treatment on walls any numbers of layers by scrapping with steel scraper or by other means and preparation of surface of wall and finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) complete all as specified and directed
M/s SHIVAM CONSTRUCTIONS
S S TRADING CO
A ONE ENGINEERING
m/s durgesh traders & constractions
M/S SWATI CONSTRUCTION
M/S KAUSHIK CONSTRUCTION
M/S S S A ASSOCIATES
QUALITY CONSTRUCTIONS CO
M/S S&R Construction
NAVSURAJ CONSTRUCTION AND INFRADEVELOPERS
M/s Chandra Mohan and Sons
sidhi vinayak construction
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .