| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.4 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹82.1 L+₹2.7 L (3.41%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Due to incomplete documents | |
| 4 | Rejected-Technical | - | Rejected-Technical Due to incomplete documents |
Tender Value
₹91 L
EMD Value
₹91,000
Closing Date
25 Sept 2024, 12:00 pmClosed
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
FOR SHIFTING OF 33KV LINE, 11KV LINE, L.T. LINE AND OTHER ASSOCIATED WORKS, DUE TO WIDENING OF MASURI DHAULANA GULAOTHI ROAD, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-II. HAPUR, UNDER EDC., HAPUR.
2024_PVVNL_955417_1
24(W)/EDCH/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Hapur
enclosed
2 documents required · 2 mandatory
₹3,540
SE, EDC, Hapur
₹91,000
28 Sept 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
Amount
FOR SHIFTING OF 33KV LINE AND OTHER ASSOCIATED WORKS, DUE TO WIDENING OF MASURI-DHAULANA-GULAOTHI ROAD, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-II HAPUR, UNDER EDC., HAPUR. (All work will be completed as per Sanctioned estimate).
Carriage of all petty material of estimate, from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of all type cable/conductor of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends, as per direction of site incharge.
Carriage of ST Pole 13 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Erection of double pole structure with all accessories on ST Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 33 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection of Four-pole structure with all accessories on ST Pole 13 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 33 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection & Fixing of ST Pole 11 mtr. long in 33 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, as per direction of site incharge.
Laying, Stringing and final sagging of ACSR Dog Conductor, as per RESPO/Drawing Norms and as per direction of site incharge
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, as per direction of site incharge.
Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, as per direction of site incharge.
Grouting of ST supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site incharge.
Trenchless laying (60X2=120mtrs. Double Circuit) of 140/160mm O/D PN-4PE-80 PN-4 grade UV stabilized HDPE pipe as per IS of 6meter, for laying of underground Cable as per RESPO/Norms, including cost of above HDPE pipe, as per direction of site incharge.
Laying of 33KV XLPE Cable 3x300Sqmm, undergound (75x2=150 Double Circuit) into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms and as per direction of site incharge
Providing & Fixing of G.I. pipe 6"dia Class-B over 33 KV 3X300 Sq.mm XLPE cable and LT XLPE Cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be burried under earth about 500mm earch including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends, as per direction of site incharge.
Making and filling of 33KV Cable Jointing Kit 3x300Sqmm, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms, and as per direction of site incharge.
Dismantling of existing 33KV Line and old & used conductor and opening of all accessories. (Iron/steel Scrap 200Kg., Conductor-1080Kg, including carriage of above material form site of work to JE Store/ESC-Hapur, with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Dismantling of old & used STP and opening of all accessories, including carriage of above material form site of work to JE Store/ESC-Hapur, with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge.
FOR SHIFTING OF 11KV LINE AND OTHER ASSOCIATED WORKS, DUE TO WIDENING OF MASURI-DHAULANA-GULAOTHI ROAD, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-II HAPUR, UNDER EDC., HAPUR. (All work will be completed as per Sanctioned estimate).
Carriage of all petty material of estimate, from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of all type cable/conductor of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends, as per direction of site incharge.
Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Carriage of ST Pole 13 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Erection of double pole structure with all accessories on ST Pole 13 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection of double pole structure with all accessories on ST Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection of Four-pole structure with all accessories on ST Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection of double pole structure with all accessories on PCC Pole 8.50 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection & Fixing of PCC Pole 8.50 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, as per direction of site incharge.
Erection & Fixing of ST Pole 11 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, as per direction of site incharge.
Trenchless laying (1270X2=2540mtrs. Double Circuit) of 140/160mm O/D PN-4PE-80 PN-4 grade UV stabilized HDPE pipe as per IS of 6meter, for laying of underground Cable as per RESPO/Norms, including cost of above HDPE pipe, as per direction of site incharge.
Laying of 11KV XLPE Cable 3x185Sqmm, undergound (1575x2=3150 Double Circuit) into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms and as per direction of site incharge
Providing & Fixing of G.I. pipe 6"dia Class-B over 11 KV 3X185 Sq.mm XLPE cable and LT XLPE Cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be burried under earth about 500mm earch including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends, as per direction of site incharge.
Making and filling of 11KV Cable Jointing Kit 3x185Sqmm, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms, and as per direction of site incharge.
Laying, Stringing and final sagging of 11KV XLPE Cable 3x185Sqmm,, including providing all fixing materils (Over head line) (Double circuit 250x2=500mtrs.), as per RESPO/Drawing Norms and as per direction of site incharge
Laying, Stringing and final sagging of ACSR Dog Conductor, as per RESPO/Drawing Norms and as per direction of site incharge
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, as per direction of site incharge.
Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, as per direction of site incharge.
Grouting of ST supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site incharge.
Dismantling of existing 11KV Line and old & used conductor and opening of all accessories. (Iron/steel Scrap 650Kg., Conductor-2400Kg, including carriage of above material form site of work to JE Store/ESC-Hapur, with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Dismantling of old & used STP and opening of all accessories, including carriage of above material form site of work to JE Store/ESC-Hapur, with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge.
FOR SHIFTING OF L.T. AND 11KV LINE AND OTHER ASSOCIATED WORKS, DUE TO WIDENING OF MASURI-DHAULANA-GULAOTHI ROAD, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-II HAPUR, UNDER EDC., HAPUR. (All work will be completed as per Sanctioned estimate).
Carriage of all petty material of estimate, from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of all type cable/conductor of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends, as per direction of site incharge.
Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Carriage of Transformers (25KVA-03Nos., 63KVA-01 Nos. and 100KVA-01Nos.) from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road,as per direction of site incharge.
Erection of double pole structure with all accessories on ST Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection & Fixing of ST Pole 11 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, as per direction of site incharge.
Erection & Fixing of PCC Pole 8.5 mtr. long in LT. line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing L.T. Pin Clamps, M.S. Flat of size 50x6 & Schacle Insulator of size 75x90mm, with proper size nuts and bolts, as per direction of site incharge.
Trenchless laying (255X2=510mtrs. Double Circuit) of 140/160mm O/D PN-4PE-80 PN-4 grade UV stabilized HDPE pipe as per IS of 6meter, for laying of underground Cable as per RESPO/Norms, including cost of above HDPE pipe, as per direction of site incharge.
Laying of 11KV XLPE Cable 3x185Sqmm, undergound (435x2=870 Double Circuit) into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms and as per direction of site incharge
Providing & Fixing of G.I. pipe 6"dia Class-B over 11 KV 3X185 Sq.mm XLPE cable and LT XLPE Cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be burried under earth about 500mm earch including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends, as per direction of site incharge.
Making and filling of 11KV Cable Jointing Kit 3x185Sqmm, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms, and as per direction of site incharge.
Laying, Stringing and final sagging of ACSR Dog Conductor, as per RESPO/Drawing Norms and as per direction of site incharge
Laying of LT ABC (95Sqmm.) and completion work properly, as per RESPO/Norms, and as per direction of site incharge.
Safely installing the transformer (25KVA-03Nos., 63KVA-01 Nos. and 100KVA-01Nos.) at LT Sub-Station Double Pole/Plinth, as per direction of site incharge.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, as per direction of site incharge.
Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, as per direction of site incharge.
Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site incharge.
Construction of T/F plinth suitable for 250KVA T/F (size of 2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour, as per direction of site incharge.
Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrod size 80mm x 3000mm complete with 50KG backfill compound with all required accessories for Body/neutral earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms and as per direction of site incharge.
Erection & Fixing of 03 Phase Distribution Box on pole by provding 02 Nos. D/B Clamps & proper size nut & bolts, as per direction of site incharge.
Erection & Fixing of 01 Phase Distribution Box on pole by provding 02 Nos. D/B Clamps & proper size nut & bolts, as per direction of site incharge.
Providing and fixing of Dead End Clamp, as per RESPO/Norms and as per direction of site incharge.
Providing and fixing of I-Hook, as per RESPO/Norms and as per direction of site incharge.
Providing and fixing of PRC, as per RESPO/Norms and as per direction of site incharge.
Dismantling of existing Line and old & used conductor and opening of all accessories. (Iron/steel Scrap 400Kg., Conductor-663Kg, L.T. ABC-2400Kg., including carriage of above material form site of work to JE Store/ESC-Hapur, with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Dismantling of old & used STP and opening of all accessories, including carriage of above material form site of work to JE Store/ESC-Hapur, with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge.
AAYANSH ELECTRICAL SOLUTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .