| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.6 LAdmitted-Finance | -30.00% | ₹22.6 L | L1 | Admitted-Finance |
| 2 | L2₹27.7 L+₹5.2 L (22.9%)Admitted-Finance | -14.00% | ₹27.7 L+₹5.2 L (22.9%) | L2 | Admitted-Finance |
| 3 | L3₹29.9 L+₹7.3 L (32.4%)Admitted-Finance | -7.35% | ₹29.9 L+₹7.3 L (32.4%) | L3 | Admitted-Finance |
| 4 | L4₹30.0 L+₹7.4 L (32.7%)Admitted-Finance | -7.10% | ₹30.0 L+₹7.4 L (32.7%) | L4 | Admitted-Finance |
| 5 | L5₹31.4 L+₹8.9 L (39.2%)Admitted-Finance | -2.53% | ₹31.4 L+₹8.9 L (39.2%) | L5 | Admitted-Finance |
Tender Value
₹32.3 L
EMD Value
₹65,000
Closing Date
26 May 2026, 3:00 pmClosed
CEO
3rd floor, old admin building
Tender for Desilting and repairing of the existing storm water drains at Chennai Fishing Harbour
2026_ChPT_907778_1
T/FHMC1/12/2026/E
Open Tender
Civil Works
Works
180 days
Kasimedu chennai fishing harbour
please refer tender document
2 documents required · 2 mandatory
₹0
₹65,000
Yes
11 Aug 2026
7 May 2026
27 May 2026
7 May 2026
26 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. Demolishing damaged R.C.C. work manually / by mechanical means including stacking of steel bars wherever required without damaging the nearby structures including collecting, and depositing the debris nearby within a lead of 50m for disposal all as specified and all as directed at site of work, including , all labour, tools, tackles, equipments, fuel, etc., complete | 67 | 1 M3 (One Cubic Meter) | 3,310 | ₹2,21,770 |
| 1.02 | 2.Dismantling the existing damaged PCC Rich mix concrete wherever required without damaging the nearby structures including collecting, and depositing the debris nearby within a lead of 50m for disposal all as specified and all as directed at site of work, including , all labour,tools, tackles,equipments,fuel, etc., complete | 20 | 1 M3 (One Cubic Meter) | 1,402 | ₹28,040 |
| 1.03 | 3.Dismantling and removing the damaged brick work manually / by mechanical means in Cement Mortar to the required size wherever required without damaging the nearby structures including collecting and depositing the debris within a lead of 50m for disposing all as specified and as directed at site, including all all labour, tools, tackles, equipments, fuel, etc., complete.. | 7 | 1 M3 (One Cubic Meter) | 1,920 | ₹13,440 |
| 1.04 | 4.Earthwork excavation by manually / mechanically in ordinary soil upto 1.50m depth, sand, clay, mixed with roots, boulders, weighing individually less than 250 kg. debris, rubbish etc., for foundation and wherever required, including dressing of sides, ramming of bottom as specififed under relevant schedules and drawings, depositing the excavated earth within a lead of 50m all as directed including shoring, shuttering, labour, tools, tackles, equipments, fuel, etc., complete. | 117 | 1 M3 (One Cubic Meter) | 243 | ₹28,431 |
| 1.05 | 5.Dewatering in the excavated area by pumping the water from foundation trench and wherever required hiring of Diesel pump motor as per site condition and as directed including pumping the water carefully without affecting the near by site including all labour, tools, plants, equipment, transport, fuel etc., complete. | 24 | 1 Hr (One Hour) | 871 | ₹20,904 |
| 1.06 | 6.Providing and laying of Plain Cement Concrete of mix 1:4:8 in volumetric proportion (1 cement : 4 CS sand : 8 Hard granite graded stone aggregate 40 mm nominal size) for levelling course for drains and wherever required including shuttering, mixing, transporting, placing, ramming, consolidating, curing all as per relevant specifications, drawings and as directed including all labour, materials, tools, plants,equipments, fuel, etc, complete. | 21 | 1M3 (One Cubic metre) | 6,713 | ₹1,40,973 |
| 1.07 | 7.Hiring of JCB for removing , lifting of precast drain cover slab, desilting / sludge removal work from drains and wherever required and re fixing of existing Precast slabs on the drain wall all as directed at site of work including all materials, labour, tools, equipment, fuel, etc., complete. | 6 | 1 Shift (One Shift) | 7,088 | ₹42,528 |
| 1.08 | 8.Providing and laying RCC of mix in 1:1.5:3, in volumetirc proportions (1 cement :1.5 CS sand : 3 Hard granite graded stone aggregate 20 mm graded down to 12mm size) in volumetric proportions for base slab of drain and wherever required including mixing, transporting, placing, ramming, consolidating, including the cost of centering, shuttering, finishing and reinforcement all as per relevant specification and as directed including all materials, labour, curing, tools, plants, equipments, transport, fuel, etc., complete.
Note:
1.Supplying, fabricating and fixing in position of reinforcement steel will be measured paid seperately under relevant item of this schedule. | 15 | 1 M3 (One Cubic Meter) | 8,653 | ₹1,29,795 |
| 1.09 | 9.Providing and laying RCC of mix in 1:1.5:3 in volumetirc proportions (1 cement :1.5 CS sand : 3 Hard granite graded stone aggregate 20 mm graded down to 12mm size) in volumetric proportions for side wall of drain and wherever required including mixing, transporting, placing, ramming, consolidating,including the cost of centering, shuttering, finishing and reinforcement all as per relevant specification and as directed including all materials, labour, curing, tools, plants, equipments, transport, fuel, etc., complete.
Note:
1. Supplying, fabricating and fixing in position of reinforcement steel will be measured paid seperately under relevant item of this schedule. | 40 | 1M3 (One Cubic metre) | 9,073 | ₹3,62,920 |
| 1.1 | 10.(a) Providing, casting and fixing in postion of RCC 1:1.5:3 mix precast Cover slab 75mm thick for drains of required size in cement concrete (1 cement :1.5 CS sand : 3 hard granite graded stone aggregate 20 mm graded down to 12 mm size) in volumetric proportion as per relevant specifications and as directed at site including shuttering, mixing, transporting, placing, ramming, consolidating, curing, etc, including lifting, transporting, placing of precast slabs in position over the drain, all labour, materials, transport, equipment, fuel, tools etc., complete Note:
1. Supplying, fabricating and fixing in position of reinforcement steel will be measured paid seperately under relevant item of this schedule. | 19 | 1M3 (One Cubic metre) | 12,947 | ₹2,45,993 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
TD.pdf
Tender Documents • 1.99 MB
BOQ_954121.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .