| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC | ₹16.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.8 LRejected-Finance H NO 3 B M J COMPOUND NEAR BENARA FACTORY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | ₹16.8 L | L2 | Rejected-Finance Second Lowest |
| 3 | L3₹17.0 LRejected-Finance NOT AVAILABLE | ₹17.0 L | L3 | Rejected-Finance Third Lowest |
| 4 | L4₹18.6 LRejected-Finance HARDAHA BALUWA VARANASI CHANDAULE | ₹18.6 L | L4 | Rejected-Finance Fourth Lowest |
| 5 | L5₹18.7 LRejected-Finance | ₹18.7 L | L5 | Rejected-Finance Fifth Lowest |
| Sl No | Description | Qty | Unit | S S CONSTRUCTION COMPANY L3 | DINESH KUMAR L2 | M/S BUDHA CONTRACTOR L7 | m/s sharam singh contractors L5 | M/S KUNWAR PAL CONTRACTOR L6 | SHRI JAGANNATH SHARMA CONSTRUCTIONS L1 | M/S SHIV CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T&P, leads and lift etc complete. | 154.36 | cum | 62.74 ₹9,684.55 | 90 ₹13,892.40 | 78 ₹12,040.08 | 69 ₹10,650.84 | 70 ₹10,805.20 | 20 ₹3,087.20 | 150 ₹23,154 |
| 2.00 | Providing and Laying M-10 (C.C. 1:3:6) cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work /Cum | 32.52 | cum | 4,714.18 ₹1.5 L | 5,200 ₹1.7 L | 5,860.5 ₹1.9 L | 5,181 ₹1.7 L | 5,600 ₹1.8 L | 5,000 ₹1.6 L | 5,500 ₹1.8 L |
| 3.00 | Providing and Laying lean concrtet (1:4:8) cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work /Cum | 6.4 | cum | 4,551.69 ₹29,130.82 | 4,500 ₹28,800 | 5,658 ₹36,211.20 | 5,002 ₹32,012.80 | 5,400 ₹34,560 | 5,200 ₹33,280 | 5,000 ₹32,000 |
| 4.00 | Providing first class M-100 brick work in 1:4 Cement Mortar including cost of all materials, labour T&P, etc. for proper completion of work. | 96.66 | cum | 4,312.71 ₹4.2 L | 5,900 ₹5.7 L | 5,361 ₹5.2 L | 4,739 ₹4.6 L | 5,000 ₹4.8 L | 4,500 ₹4.3 L | 6,600 ₹6.4 L |
| 5.00 | Providing and fixing Centering & shuttering for R.C.C. and C.C. works (form work of concrete) i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum | 117.23 | sqm | 452.07 ₹52,996.17 | 550 ₹64,476.50 | 562 ₹65,883.26 | 497 ₹58,263.31 | 500 ₹58,615 | 500 ₹58,615 | 550 ₹64,476.50 |
| 6.00 | Providing and Laying M-25 C.C. 1:1:2 cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum | 3.16 | cum | 6,196.85 ₹19,582.05 | 7,200 ₹22,752 | 7,703 ₹24,341.48 | 6,810 ₹21,519.60 | 6,500 ₹20,540 | 6,800 ₹21,488 | 7,700 ₹24,332 |
| 7.00 | Reinforced Cement concrete 1:1.5:3 (M-20 Grade) in nominal mix design with using 7.90 cement bags /m3 (cement, coarse sand and crushed aggregate)i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum | 20.66 | cum | 5,467.22 ₹1.1 L | 7,000 ₹1.4 L | 6,796 ₹1.4 L | 6,008 ₹1.2 L | 6,500 ₹1.3 L | 6,400 ₹1.3 L | 7,500 ₹1.5 L |
| 8.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all labour and T&P etc. for proper completion of work. | 19.46 | Qtl | 6,243.93 ₹1.2 L | 9,000 ₹1.8 L | 7,986 ₹1.6 L | 7,050 ₹1.4 L | 7,200 ₹1.4 L | 6,000 ₹1.2 L | 9,000 ₹1.8 L |
| 9.00 | Providing and fixing of 75 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing, labour, T&P, etc compete as per direction of Engineer-in-charge. | 3.28 | RM | 201.1 ₹659.61 | 120 ₹393.60 | 250 ₹820 | 221 ₹724.88 | 230 ₹754.40 | 200 ₹656 | 120 ₹393.60 |
| 10.00 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P etc. for proper completion of work. | 151.2 | sqm | 210.79 ₹31,871.45 | 180 ₹27,216 | 262 ₹39,614.40 | 232 ₹35,078.40 | 220 ₹33,264 | 200 ₹30,240 | 180 ₹27,216 |
Tender Value
₹19.9 L
EMD Value
₹40,000
Closing Date
25 Apr 2026, 12:00 pmClosed
EEMGCCDIV15MBD
EEMGCCDIV15MBD
Construction of V.R.B. At km 8.300 and km 8.900 of Prahladpur Dy.
2026_UPIDC_1135692_4
01/EE/2026-27
Open Tender
Civil Works
45 days
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹40,000
22 May 2026
15 Apr 2026
25 Apr 2026
15 Apr 2026
25 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T&P, leads and lift etc complete. | - | cum | - | - |
| 2 | Providing and Laying M-10 (C.C. 1:3:6) cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work /Cum | - | cum | - | - |
| 3 | Providing and Laying lean concrtet (1:4:8) cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work /Cum | - | cum | - | - |
| 4 | Providing first class M-100 brick work in 1:4 Cement Mortar including cost of all materials, labour T&P, etc. for proper completion of work. | 1 | cum | - | - |
| 5 | Providing and fixing Centering & shuttering for R.C.C. and C.C. works (form work of concrete) i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum | - | sqm | - | - |
| 6 | Providing and Laying M-25 C.C. 1:1:2 cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum | - | cum | - | - |
| 7 | Reinforced Cement concrete 1:1.5:3 (M-20 Grade) in nominal mix design with using 7.90 cement bags /m3 (cement, coarse sand and crushed aggregate)i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum | - | cum | - | - |
| 8 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all labour and T&P etc. for proper completion of work. | - | Qtl | - | - |
| 9 | Providing and fixing of 75 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing, labour, T&P, etc compete as per direction of Engineer-in-charge. | 1 | RM | - | - |
| 10 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P etc. for proper completion of work. | 1 | sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_2121218.xls
BOQ • 0.32 MB
tenderdocumentslot4.pdf
Tender Documents • 1.67 MB
Download all tender documents and submit your bid