| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.4 CrAccepted-AOC ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | ₹19.4 Cr Quoted ₹21.9 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹21.9 CrSame as 1Rejected-Finance BARABANKI | UTTAR PRADESH | 225001 | ₹21.9 CrSame as 1 | 2 | Rejected-Finance L2 |
| 3 | 3₹21.9 CrSame as 1Rejected-Finance D 39 DIVYA NAGAR GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹21.9 CrSame as 1 | 3 | Rejected-Finance L3 |
| 4 | 4₹21.9 CrSame as 1Rejected-Finance 534 ASHIRVAD MAL GODAM ROAD SULTANPUR 228001 | SULTANPUR | SULTANPUR | UTTAR PRADESH | 228001 | ₹21.9 CrSame as 1 | 4 | Rejected-Finance L4 |
| 5 | Rejected-Technical MADHEPURA | - | - | Rejected-Technical Fail |
Tender Value
₹21.9 Cr
EMD Value
₹31.9 L
Closing Date
11 Mar 2026, 12:00 pmClosed
SUPRINTENDING ENGINEER
OFFICE OF SE PMGSY CIRCLE PWD KANPUR
BUILDING WORK
2026_WBEAP_1116996_1
184_167 C_PMGSY C_2026 Date 24.01.2026
Open Tender
Civil Works - Buildings
Percentage
547 days
MAHOBA
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,714
₹31.9 L
Yes
KANPUR
17 Apr 2026
17 Feb 2026
11 Mar 2026
17 Feb 2026
11 Mar 2026
17 Feb 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil
From 0.00 mt to 1.50 mt(2.6.1) | 3,725 | CUM | 122.78 | ₹4,57,355.5 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil
1.50mt to 3.0 mt(2.6.1+2.26.1) | 176.84 | CUM | 210.5 | ₹37,224.82 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil
3.0 mt to 4.50 mt(2.6.1+2.26.1*2) | 95.41 | CUM | 298.2 | ₹28,451.26 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil
In all kind of soil upto 4.5 m to 6.0m. depth(2.6.1 + 3 x 2.26.1) | 10.55 | CUM | 385.91 | ₹4,071.35 |
| 5 | Excavating, supplying and filling of carted earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.(1.1.2) | 6,122.49 | CUM | 225.97 | ₹13,83,499.07 |
| 6 | 1:4:8 (1 Cement OPC: 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
(With O.P.C Cement) (4.1.8) | 822.29 | CUM | 4,712.02 | ₹38,74,646.93 |
| 7 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work.(2.27) | 2,043.17 | CUM | 1,469.05 | ₹30,01,518.89 |
| 8 | Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete.
(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm
(4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution)(2.35.3) | 3,530.38 | SQM | 214.47 | ₹7,57,160.6 |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, PortlandPozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the followinggrades of concrete.: Note: Extra cement up to 10% of the minimum specified cement contentin design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement
content of 330 kg /cum (With O.P.C Cement)
R.C.C. work foundation upto Plinth Lvl./column upto plinth Lvl /Tie beam/Band at plinth Lvl/ (5.33.1.1) | 926.64 | CUM | 6,574.67 | ₹60,92,352.21 |
| 10 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.. All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum (With O.P.C Cement)
Lintel / Lintel Band/ R.C.C. work in slab/
R.C.C.work in Beams /R.C.C.work in Column/ (5.33.2.1) | 1,992.85 | CUM | 6,820.68 | ₹1,35,92,592.14 |
stage.html
html • 0.05 MB
technical_2074826.pdf
techsummary_2074826.pdf
BOQ Comparative Chart
xlsx
finsummary_2074826.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 3.45 MB
BOQ_2074826.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .