Loading…
Loading…
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
29 Aug 2026, 6:00 pm4d left
GE Alwar
Alwar
REPAIR/ MAINT OF DISTRIBUTION OF WATER SUPPLY PIPE LINE AND CONNECTED ITEMS FOR OFFICERS AND OR/JCOS MD ACCN AT ITARANA CANTT ALWAR
2026_MES_781904_1
8546/E8
Open Tender
Civil Works
Item Rate
330 days
Alwar
As per NIT documents
6 documents required · 6 mandatory
₹500
Yes
GE Alwar
₹70,000
Yes
29 Aug 2026
31 Jul 2026
5 Sept 2026
31 Jul 2026
29 Aug 2026
15 Aug 2026
31 Jul 2026 - 14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches not exc 1.5 metre wide and not exc 1.5 metre in depth for foundation etc or for laying of cables, pipes etc and getting out in soft/loose soil complete all as specified and directed | 690 | Cum | 1.25 | ₹862.5 |
| 2 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick in soft/loose soil complete all as specified. | 610 | Cum | 100 | ₹61,000 |
| 3 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed. | 80 | Cum | 53 | ₹4,240 |
| 4 | Taking up or down GI tubing and connections of 15 mm bore, fixed in walls, ceiling, floors, trenches etc complete all as specified and directed. Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 700 | RM | 10 | ₹7,000 |
| 5 | Taking up or down steel water tubing and connections of 20mm bore, fixed in walls, ceiling, floors, trenches etc complete all as specified and directed
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 650 | RM | 11 | ₹7,150 |
| 6 | Taking up or down steel water tubing and connections of 25mm bore, fixed in walls, ceiling, floors, trenches etc complete all as specified and directed
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 680 | RM | 1.25 | ₹850 |
| 7 | Taking up or down steel water tubing and connections of 40mm bore, laid in trenches etc complete all as specified and directed
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 270 | RM | - | - |
| 8 | Taking up or down steel water tubing and connections of 50mm bore,laid in trenches etc complete all as specified and directed
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 610 | RM | - | - |
| 9 | Taking up or down GI water tubing and connections of 80mm bore laid in trenches etc complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 580 | RM | 100 | ₹58,000 |
| 10 | Taking up or down water tubing and connections of 100mm bore laid in trenches etc complete all as specified and directed
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 291 | RM | 100 | ₹29,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender8546.pdf
Tender Documents • 0.92 MB
BOQ_875945.xls
BOQ • 3.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].