Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAdmitted-Finance | ₹5.8 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SEKAR CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00Part-A Civil Work | ||||
| 1.01 | Earthwork Excavation in all Sorts of Soil murrum ,boulders,& soft rock for foundation trenches, walls, drains, plinths, footings, pedestals, colunmns and for all other miscellaneous foundation works etc., including Shoring, strutting, bailing out water by De watering with required size dewatering PUMP & motor [if necessary], dressing, leveling & hand ramming he bottom of foundation base using wooden hand rammer with proper watering, refilling the sides of the foundation with excavated available good quality of Soil, leveling & hand ramming the sides of foundation base using wooden hand rammer with proper watering, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the waste soil or surplus soil, generated waste, costruction waste up to a lead of 2000 to 3000 meters . from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift & height.
Excavation from ground level to 1.5m depth | 959 | cum | 950 ₹9,11,050 Lowest |
| 1.02 | Earthwork Excavation in all Sorts of Soil murrum ,boulders,& soft rock for foundation trenches, walls, drains, plinths, footings, pedestals, colunmns and for all other miscellaneous foundation works etc., including Shoring, strutting, bailing out water by De watering with required size dewatering PUMP & motor [if necessary], dressing, leveling & hand ramming he bottom of foundation base using wooden hand rammer with proper watering, refilling the sides of the foundation with excavated available good quality of Soil, leveling & hand ramming the sides of foundation base using wooden hand rammer with proper watering, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the waste soil or surplus soil, generated waste, costruction waste up to a lead of 2000 to 3000 meters . from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift & height.
Excavation from 1.5m to 3m depth | 230 | cum | 1,100 ₹2,53,000 Lowest |
| 1.03 | Excavation in Hard Rock for foundation of walls, trenches, walls, drains, plinths, footings, pedestals, columns, underground water sump & pits, pipe line works and for all other miscellaneous foundation works etc. including , shoring; strutting; bailing out water by De watering with required size dewatering PUMP & motor [if necessary]; leveling / dressing the bottom of foundations, refilling the sides of the foundation with excavated available good quality Soil [soil obtained from above item/s]; leveling / dressing , collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. | 108 | cum | 2,500 ₹2,70,000 Lowest |
| 1.04 | Back filling: Supplying of good quality earth to site brought from outside free from weeds, roots, pebbles, rubble and other foreighn materials, including royalty & carriage and filling the same in trenches, plinth and sides of foundation etc… in layers not exceeding 300mm in depth consolidating each filled layer by ramming and watering for lift upt to required level etc...all complete with safety as per drawings, specifications and as directed by Engineer-In-Charge. Note : Only consolidated filled volume shall be measured and paid. | 108 | cum | 1,500 ₹1,62,000 Lowest |
| 1.05 | Providing and laying 230 mm thick Stone Soling below floor & foundations bed etc. using hard, durable & approved quality stones, rubbles, filling interstices using small size stones, stone chips, murum & watering [to fill uip all gaps] etc. including preparation of base properly, levelling, dressing & hand ramming, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. | 643 | sqm | 680 ₹4,37,240 Lowest |
| 1.06 | Providing and laying PCC M-15 using 20 mm & downsize, clean, crushed, well graded, aggregates of hard, durable & approved quality for foundation, plinth works including preparation of base by close hacking / chipping the old surface, racking out the joints & cleaning, mixing, transporting, laying, spreading, consolidation, levelling, finishing, curing, providing; fixing & removing necessary formwork, providing, fixing & removing staging / platform / scaffoldiong, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. | 91 | cum | 11,800 ₹10,73,800 Lowest |
| 1.07 | Providing and laying Heavy Dencity [designed] Concrete of Grade H/30/20 of minimum density 3.75g/cc usinging 20 mm & downsize clean, crushed, well graded, Heavy aggrigate & sand of hard, durable & approved quality for foundation, rafts, bedding, platform, Hatch blocks and all insitu,pre cast concrete works including preparation of base by close hacking / chipping the old surface, racking out the joints & cleaning, mechanical mixing, transporting, laying, spreading, consolidation, levelling, finishing, joints filling (All joints shall be sealed with Polysulphide Caulking compound ) & curing, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard & manufacturers technical specification and as per drawing. | 61 | cum | 1,49,500 ₹91,19,500 Lowest |
| 1.08 | Providing and laying RCC M 30 grade using 20 mm & downsize clean, crushed, well graded, aggregates of hard, durable , approved quality for foundation, rafts, columns, beams, walls, bedding, platform, pathways, and water tightness test of the vault shall be conducted from inside to outside and outside to inside etc all insitu concrete works including preparation of base by close hacking / chipping the old surface, racking out the joints & cleaning, mechanical mixing, transporting, laying, spreading, consolidation, levelling, finishing, and curing, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. Note : (1) Minimum Cement content shall not be less than 360 Kg/Cum. (2) Weigh Batching shall be adopted to measure Sand , Aggregate & Cement | 471 | Cum | 16,500 ₹77,71,500 Lowest |
| 1.09 | Providing, placing and removing formwork for Concrete Works such as foundation, raft, columns, beams, slab, footings, Wall, & all other miscellaneous RCC works including providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. Note: The measurement for the form work will be actual area of form in contact with the concrete surfaces. | 884 | sqm | 1,350 ₹11,93,400 Lowest |
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
20 Jul 2026, 5:00 pmClosed
Sr Manager, CMM (Works)
Sr Manager, CMM (Works), MAPS, Kalpakkam
Construction of RC Vaults for Storage of Pressure tube and End Fittings and Garter Spring for MAPS UNIT-2 EMCCR at CWMF Facility, Kalpakkam.
2026_NPCIL_282167_1
MAPS/CMM(W)/CSM/PUB/ET919/2026
Open Tender
Civil Works
Item Rate
365 days
CWMF Facility, Kalpakkam
Construction of Building or Civil Structures (With or Without Supply of
Materials)
3 documents required · 3 mandatory
₹0
₹11.2 L
Office of DGM(Works), MAPS
16 Sept 2026
26 Jun 2026
21 Jul 2026
29 Jun 2026
20 Jul 2026
9 Jul 2026
29 Jun 2026 - 7 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part-A Civil Work | |||||
| 1.01 | Earthwork Excavation in all Sorts of Soil murrum ,boulders,& soft rock for foundation trenches, walls, drains, plinths, footings, pedestals, colunmns and for all other miscellaneous foundation works etc., including Shoring, strutting, bailing out water by De watering with required size dewatering PUMP & motor [if necessary], dressing, leveling & hand ramming he bottom of foundation base using wooden hand rammer with proper watering, refilling the sides of the foundation with excavated available good quality of Soil, leveling & hand ramming the sides of foundation base using wooden hand rammer with proper watering, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the waste soil or surplus soil, generated waste, costruction waste up to a lead of 2000 to 3000 meters . from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift & height.
Excavation from ground level to 1.5m depth | - | cum | 1,020 | - |
| 1.02 | Earthwork Excavation in all Sorts of Soil murrum ,boulders,& soft rock for foundation trenches, walls, drains, plinths, footings, pedestals, colunmns and for all other miscellaneous foundation works etc., including Shoring, strutting, bailing out water by De watering with required size dewatering PUMP & motor [if necessary], dressing, leveling & hand ramming he bottom of foundation base using wooden hand rammer with proper watering, refilling the sides of the foundation with excavated available good quality of Soil, leveling & hand ramming the sides of foundation base using wooden hand rammer with proper watering, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the waste soil or surplus soil, generated waste, costruction waste up to a lead of 2000 to 3000 meters . from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift & height.
Excavation from 1.5m to 3m depth | - | cum | 1,232 | - |
| 1.03 | Excavation in Hard Rock for foundation of walls, trenches, walls, drains, plinths, footings, pedestals, columns, underground water sump & pits, pipe line works and for all other miscellaneous foundation works etc. including , shoring; strutting; bailing out water by De watering with required size dewatering PUMP & motor [if necessary]; leveling / dressing the bottom of foundations, refilling the sides of the foundation with excavated available good quality Soil [soil obtained from above item/s]; leveling / dressing , collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. | - | cum | 2,377 | - |
| 1.04 | Back filling: Supplying of good quality earth to site brought from outside free from weeds, roots, pebbles, rubble and other foreighn materials, including royalty & carriage and filling the same in trenches, plinth and sides of foundation etc… in layers not exceeding 300mm in depth consolidating each filled layer by ramming and watering for lift upt to required level etc...all complete with safety as per drawings, specifications and as directed by Engineer-In-Charge. Note : Only consolidated filled volume shall be measured and paid. | - | cum | 1,450 | - |
| 1.05 | Providing and laying 230 mm thick Stone Soling below floor & foundations bed etc. using hard, durable & approved quality stones, rubbles, filling interstices using small size stones, stone chips, murum & watering [to fill uip all gaps] etc. including preparation of base properly, levelling, dressing & hand ramming, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. | - | sqm | 613 | - |
| 1.06 | Providing and laying PCC M-15 using 20 mm & downsize, clean, crushed, well graded, aggregates of hard, durable & approved quality for foundation, plinth works including preparation of base by close hacking / chipping the old surface, racking out the joints & cleaning, mixing, transporting, laying, spreading, consolidation, levelling, finishing, curing, providing; fixing & removing necessary formwork, providing, fixing & removing staging / platform / scaffoldiong, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. | - | cum | 11,952 | - |
| 1.07 | Providing and laying Heavy Dencity [designed] Concrete of Grade H/30/20 of minimum density 3.75g/cc usinging 20 mm & downsize clean, crushed, well graded, Heavy aggrigate & sand of hard, durable & approved quality for foundation, rafts, bedding, platform, Hatch blocks and all insitu,pre cast concrete works including preparation of base by close hacking / chipping the old surface, racking out the joints & cleaning, mechanical mixing, transporting, laying, spreading, consolidation, levelling, finishing, joints filling (All joints shall be sealed with Polysulphide Caulking compound ) & curing, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard & manufacturers technical specification and as per drawing. | - | cum | 1,48,000 | - |
| 1.08 | Providing and laying RCC M 30 grade using 20 mm & downsize clean, crushed, well graded, aggregates of hard, durable , approved quality for foundation, rafts, columns, beams, walls, bedding, platform, pathways, and water tightness test of the vault shall be conducted from inside to outside and outside to inside etc all insitu concrete works including preparation of base by close hacking / chipping the old surface, racking out the joints & cleaning, mechanical mixing, transporting, laying, spreading, consolidation, levelling, finishing, and curing, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. Note : (1) Minimum Cement content shall not be less than 360 Kg/Cum. (2) Weigh Batching shall be adopted to measure Sand , Aggregate & Cement | - | Cum | 16,854 | - |
| 1.09 | Providing, placing and removing formwork for Concrete Works such as foundation, raft, columns, beams, slab, footings, Wall, & all other miscellaneous RCC works including providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 meters. from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. Note: The measurement for the form work will be actual area of form in contact with the concrete surfaces. | - | sqm | 1,409 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.44 MB
GCC.pdf
Tender Documents • 3.06 MB
TechnicalSpecificationsET919.pdf
Tender Documents • 11.99 MB
Drawing.pdf
Tender Documents • 10.85 MB
BOQ_329217.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .