Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical All as per tender conditions |
| 4 | Rejected-Technical | Rejected-Technical All as per tender conditions |
| 5 | Rejected-Technical | Rejected-Technical All as per tender conditions |
Tender Value
₹33.1 L
EMD Value
₹66,200
Closing Date
11 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer, CHPA
No.1, Rajaji salai, opp. to RBI, Chennai port Authority Chennai-01
TENDER FOR REPLACING THE EXISTING AC SHEET ROOFING BY PROVIDING GALVALUME SHEET, RIDGES, GUTTER AND TOUGHENED GLASS IN HEAVY WORK SHOP AT SOUTH ZONE
2022_ChPT_702115_1
T/WMA6/ 65 /2022/E
Open Tender
Civil Works
Works
180 days
Chennai Port Authority, Chennai-1
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹66,200
Yes
7 Nov 2022
22 Jul 2022
12 Aug 2022
22 Jul 2022
11 Aug 2022
5 Aug 2022
1.Providing double scaffolding arrangement to the full height of the Heavy work shop building / shed inner side, outer side and wherever required to carryout the repair/ improvement works for renewal of toughened glass, galvalume gutter, galvalume sheet etc. by using Steel pipes of required diameter or by Casuarina poles, including providing necessary tie members, bracings etc.,all-round and platforms at various level with adequate strength including removing the scaffolding with platform after completion of repair/improvement works all as per relevant specification and all as directed at site including all labour, materials, tools, equipment, coir, transport, fuel, etc., complete. Note:1. Payment of 75% only may be released, after erecting of scaffolding in all respects. 2.The balance 25% of payment will be released after completion of repair/improvement works and removal of scaffolding. 3.If casuarina poles used for scaffolding, the bottom and top dia.of casuarina poles are of 100mm and 50mm respectively. 4. Scaffolding will be measured only one time for entire repair work.
2. Dismantling and removing the existing damaged Asbestos cement corrugated roofing sheet and ridges, valley gutter etc., wherever required without damaging near by structures/ North light roofing including collecting and stacking the broken ACC sheets within a lead of 50m for disposal and handing over the retrieved materials such as Non Asbestos / Asbestos cement corrugated sheets, J/ L bolts, nuts etc., to RSD yard within a lead of 1Kms all as specified and as directed at site of work including all labour, tools, tackles, equipments, scaffolding, transport, fuel, safety ladder / safety belts / safety helmets / safety nets etc., complete.
3 (a).Providing and fixing roofing with Galvanised powder coated color corrugated sheet of 0.47mm thickness to the required size for the Heavy work shop bay centre, cladding portions and wherever required as available in the Market and fixing in proper position with necessary screws/bolts to the existing C Channel/ L angle including joining the sheets to the required lap length without damaging the near by North light roofing glass and other structures all as per site condition and relevant specifications and as directed at site of work including all labour, tools, tackles, equipments, scaffolding, transport, fuel, safety ladder / safety belts / safety helmets / safety nets etc., complete. Note: Payment will be made only for the actual area of sheet provided
3(b). Providing and fixing Galvanised powder coated colour corrugated roofing sheets (0.47mm thick) with curved shape at end for bay end/eaves portion in Heavy work shop and wherever required as available in the Market and fixing in proper position with necessary screws/bolts to the existing C Channel/ L angle including joining the sheets to the required lap length without damaging the near by North light roofing glass and other structures all as per site condition and relevant specifications and as directed at site of work including all labour, tools, tackles, equipments, scaffolding, transport, fuel, safety ladder / safety belts / safety helmets / safety nets etc., complete. Note: Payment will be made only for the actual area of sheet provided .
4. Supplying and fixing of serrated adjustable Galvanised powder coated colour ridge sheets in pairs for heavyworkshop to suit the Galvalume colour coated corrugated roofing sheets (0.47mm thick) as available in the market and fixing in proper position with necessary accessories , screws, bolts etc. to the existing C Channel/ angle and joining the ridge sheets to the required lap length without damaging the near by North light roofing glass and other structures all as specified and as directed at site of work including all labour, materials, tools, tackles, equipments, scaffolding, transport, fuel, safety ladder, safety belts, safety helmets, safety nets etc., complete. Note: Payment will be made only the actual length of ridge sheet provided
5.Supplying of galvalume colour coated roofing sheets ( 0.47mm thick) or nearest size as available in the market and fabricating the sheet to the required shape and size ( to match with the existing gutter shape) for valley gutter to suit with the slope of the roofing sheets of shed and fixing in position over MS bracket made up of 60x6mm flat at 0.45m intervals and bending, welding and fixing the MS flat with the existing C Channel / angle with suitable fasteners, bolts & nuts and other accessories all as per site condition joining the gutter sheets to the required lap length without damaging the near by North light roofing glass and other structures, providing holes in the Galalume sheet at both ends for fixing PVC 110mm dia rain water pipe all as specified and as directed at site of work including applying two coats of synthetic enamel paint over a coat of primer to the MS flat surface including all labour, materials, tools, tackles, equipments, welding plant , scaffolding, transport, fuel, safety ladder, safety belts, safety helmets, safety nets etc., complete.
6.Supplying and fixing 6mm thick Toughened glass of required size to suit in the existing aluminium channel and fixing the toughened glass in position using silicon gel and tufflen tape including removing the existing damaged pinheaded glass all as directed at site of work, including all labour, material, scaffolding, transporting, tools, equipments, fuel, safety ladder, safety belts, safety helmets, safety nets etc., complete. Note: Payment will be made only for the actual area of Toughened glass provided
Providing and fixing in position rigid unplasticised PVC pipes of 110mm dia outside diameters (4 Kgf/cm2 pressure) for Rain water pipe (Finolex (or) Trubore (or) Varun) with necessary bends, Tees with door provision and fixing with Special G.I. Clamps and other specials etc., wherever required including removing the existing damaged PVC pipe including jointing the pipes with Galvaume sheet gutter using necessary adhesives and sealants making the joints water tight and making good the disturbed portions all as directed at site of work , including all materials, labour, tools, scaffolding, equipments, safety ladder, safety belts, safety helmets, safety nets etc., complete.
JP ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .