Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹27.0 L+₹1.4 L (5.57%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹27.8 L+₹2.2 L (8.64%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹28.4 L+₹2.8 L (11.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹28.4 L+₹2.8 L (11.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹28.5 L
EMD Value
₹2.9 L
Closing Date
8 Oct 2026, 5:00 pmClosed
Sachiv Mawana
Sachiv Mawana
02 - Sahkari ganna vikas samiti ltd mawana ke prangan mai avasiya bhawan no - 2 ke jirnodhwar ka kariya
2026_CDSI_1191562_2
489/C Dt 28-09-2026
Open Tender
Miscellaneous Works
Percentage
180 days
Mawana
Tender Fee, EMD and documents as per Tender Document/NIT
2 documents required · 2 mandatory
₹1,354
Sachiv Sehkari Ganna Vikas Samiti Ltd Mawana
₹2.9 L
17 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old Exisiting plaster I/C disposal of refuse as directed by Engineer-in-charge. | 792.95 | Sqm | 38.5 | ₹30,528.42 |
| - | Dismentling of old Door or windows i/c chaukhats with hold fast I/C stacking of material asa directed be the eng.-in-charge. | 32.64 | Sqm | 258.8 | ₹8,447.23 |
| - | Dismantling brick work or stone work in lime or cement mortar & I/C stacking of material asa directed be the eng.-in-charge. | 29.21 | Cum | 267.8 | ₹7,822.55 |
| - | Dismantling Reinforced cement concrete or brick work slab I/C base conc. All comp. of work.Si no-697. | 24.13 | Cum | 2,502.8 | ₹60,397.57 |
| - | Dismantling cement concrete or brick work or granolithic floors I/C base conc. All comp. of work. | 24.13 | Sqm | 31.7 | ₹764.98 |
| - | Conc with 4 Cm gauge Stone ballast Coarse sand of 2.20 FM and cement in proportion of (1:4:8) in foundation and under floors including supply of all materials. | 10.6 | Cum | 4,800.9 | ₹50,889.54 |
| - | R.C.C. (1:1.5:3) with cement ,approved coarse sand &2 cm gauge stone girt for Plinth Beam & Lintel band | 14.6 | Cum | 7,648.9 | ₹1,11,673.94 |
| - | M-150 class brick work (1:6) with cement & fine sand mortar in sup-structure foundation plinth I/c all comp of work | 59.77 | Cum | 6,417.7 | ₹3,83,556.41 |
| - | R.C.C. (1:1.5:3) with cement ,approved coarse sand &2 cm gauge stone girt for Slab | 20.6 | Cum | 8,108.8 | ₹1,67,041.28 |
| - | M.S. item work such as R.C.C. Completion of work as per | 19.82 | Qtl | 7,601 | ₹1,50,685.19 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
Tendernotice_2.pdf
PDF • 4.86 MB
BOQ_2248564.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .