Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | -22.70% | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹31,265.83 (28.1%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹1.4 L+₹31,265.83 (28.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 L+₹32,634.61 (29.3%)Admitted-Fee/PreQual/Technical/Finance | -0.05% | ₹1.4 L+₹32,634.61 (29.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.5 L+₹34,147.47 (30.7%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹1.5 L+₹34,147.47 (30.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹2,880
Closing Date
4 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of B Path from Main road to Primary School nai Basti W.no 4 Pyt Sujandhar Block Bhomag Distt Reasi under capex PRI for the year 2026-27
2026_RDPR_317790_36
e-NIT No. 65 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
REASl Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,880
8 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (All kinds of soils for a lead up to 1.0m from cutting edge.) | 3.91 | Cum | 479.3 | ₹1,874.06 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.8 | Cum | 4,826.5 | ₹27,993.7 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 7.5 | Cum | 4,463.72 | ₹33,477.9 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for. Foundation. | 50 | Sqm | 286.35 | ₹14,317.5 |
| 5 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . 11.29.1 Light shade using white cement | 39.06 | Sqm | 1,293.6 | ₹50,528.02 |
| 6 | Carriage of sand, Bajri & Stone Agg 31.00 KM by MT and 100 mtr AT | 15 | Cum | 775.74 | ₹11,636.1 |
| 7 | Carriage of cement from 31.0 KM by MT . And 100 mtr by At | 1.96 | MT | 640.25 | ₹1,254.89 |
| 8 | Provission for Citizen information Board | 1 | Nos | 3,000 | ₹3,000 |
stage.html
html • 0.02 MB
finance_1044647.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1044647.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .