Tender Value
₹32.1 L
EMD Value
₹64,300
Closing Date
18 Jun 2026, 5:00 pm
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Boundary wall of Kabristan in Village Nangla Handa, YEIDA. WC-06
2026_YEIDA_1157329_40
YEA/GM(PROJECT)/2026/517 DT-04/06/2026
Open Tender
Civil Works
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹915
₹64,300
9 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1 m above ground level and removal of rubbish up to distance of 50m outside the periphery of the area cleared UPPWD/SOR/DAR-18/2.31 | |||||
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a load of 50m | - | Cum | 1 | - |
| 3Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work | |||||
| 4.01 | Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc.for mass concrete. | - | Sqm | - | - |
| 4.02 | Centring and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumer sand cantilevers. | - | Sqm | - | - |
| 4.03 | Centring and shuttering including strutting, propping etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | Sqm | - | - |
| 5Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) | |||||
| 6Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: All work above plinth level upto floor V level | |||||
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete uoto plinth level. Thermo Mechanically Treated bars | 1 | Kg | 1 | ₹1 |
| 8M-150 brick work in 1:6 cement & fine sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a UPPWD SOR 305a | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
BOQ_2171212.xls
BOQ • 0.29 MB
40.pdf
Tender Documents • 2.67 MB
Download all tender documents and submit your bid