| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L Quoted ₹9.3 L | L1 | Accepted-AOC Work was Awarded |
| 2 | L2₹9.7 LRejected-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 8 | TUTICORIN | TAMIL NADU | 626202 | ₹9.7 L | L2 | Rejected-AOC Work was not Awarded |
| Sl No | Description | Qty | Unit | SARASWATHY ENGINEERING AND CONTRACTORS L1 | KUMAAR ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for routine cleaning of wall through Bushing CTs inside and outside at an elevtion of 10.5 mtrs to make insulator healthy and to avoid carona discharge at 230KV Indoor Switchyard-1 | 34 | Nos | 1,74,896 ₹2.1 L | 1,81,900 ₹2.1 L |
| 2.00 | Routine cleaning of strung bus insulators at an elevation of 15 mtrs for 2 ends to make insulators healthy and to avoid carona discharge, in 230kV Indoor Switchyard-I end and power house column. | 48 | Nos | 1,44,144 ₹1.7 L | 1,49,904 ₹1.8 L |
| 3.00 | Routine cleaning under hung bus bar support insulators stack consists of 6 Nos insulators and cleaning of steel structures at an elevation of 13.5m including movement of telescopic type till table ladder, discharge rods from Switchyard-I stores to the work spot and back on completion of works to make insulators healthy and to avoid carona discharge. | 178 | Nos | 1,68,343.5 ₹2.0 L | 1,75,152 ₹2.1 L |
| 4.00 | Cleaning, tightness checking,. and assisting in MRT Testing works and attending glow, changing the defective clamps, finger contacts and moving contacts, etc., in 230KV Breakers, LAs, CVT, CC Wave traps etc., at Switch yard I for Quarterly maintenance. | 45 | Nos | 3,03,480 ₹3.6 L | 3,15,630 ₹3.7 L |
| 5.00 | Cleaning tightness checking and assisting in MRT Testing works (a) In 230KV Main buses / Transfer bus , bus sections for SF6 Breakers and Isolators. | 4 | Nos | 51,104 ₹60,302.72 | 53,148 ₹62,714.64 |
| 6.00 | Cleaning and tightness checking of 3Nos HV Bushings and 6Nos LV Bushings in 230kV Station Transformer-I & II including cost of consumables | 2 | Nos | 8,520 ₹10,053.60 | 8,860 ₹10,454.80 |
| 7.00 | Cleaning and tightness checking 3 Nos lightning arrestors, 3 Nos Pedestal support insulators and its jumpers connection clamps tightness checking work , earth resistor box and neutral grounding transformer & arresting oil leaks in station transformer-I & II including cost of consumables | 2 | Nos | 15,204 ₹17,940.72 | 15,812 ₹18,658.16 |
| 8.00 | Removing jumpers of HV bushings, LV links Neutral bushings, LAs & Assisting MRT testing work and reconnecting of all jumpers after MRT testing work and tightness checking of Station Transformer-I & II including cost of consumables | 2 | Nos | 9,864 ₹11,639.52 | 10,260 ₹12,106.80 |
| 9.00 | Dismantling jumpers of HV bushing and assisting for MRT testing work and reconnection of jumpers after completion of MRT testing and cleaning of transformer, HV Bushing, LV bushing & Neutral bushing and arresting oil leaks of 230kV Spare Generator Transformer including cost of consumables | 1 | Nos | 3,426 ₹4,042.68 | 3,564 ₹4,205.52 |
| 10.00 | Half yearly maintenance of Spare Generator Transformer & Station Transformer-I,II. Cleaning & tightness checking of HV & LV bushing, Las, Pedestal support Insulator of 230kV Station Transformer-I,II and Spare Generator Transformer including arresting of oil leaks & cleaning of Transformer including cost of consumables | 1 | Opn | 15,205 ₹17,941.90 | 15,814 ₹18,660.52 |
Tender Value
Refer Docs
EMD Value
₹8,400
Closing Date
31 Dec 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM I Annual Maintenance and testing of WBCT BREAKER LAS CVT isolators CC wave traps main bus I II and III PT CTs transfer bus Station transformer I II and spare generator transformer under hung bus earth bus and its frame under hung bu
2025_EB_633106_1
CE/SE/ES/TTPS/41/2026-27
Open Tender
Electrical and Maintenance Works
365 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹8,400
Yes
23 Mar 2026
16 Dec 2025
2 Jan 2026
16 Dec 2025
31 Dec 2025
16 Dec 2025
Charges for routine cleaning of wall through Bushing CTs inside and outside at an elevtion of 10.5 mtrs to make insulator healthy and to avoid carona discharge at 230KV Indoor Switchyard-1
Routine cleaning of strung bus insulators at an elevation of 15 mtrs for 2 ends to make insulators healthy and to avoid carona discharge, in 230kV Indoor Switchyard-I end and power house column.
Routine cleaning under hung bus bar support insulators stack consists of 6 Nos insulators and cleaning of steel structures at an elevation of 13.5m including movement of telescopic type till table ladder, discharge rods from Switchyard-I stores to the work spot and back on completion of works to make insulators healthy and to avoid carona discharge.
Cleaning, tightness checking,. and assisting in MRT Testing works and attending glow, changing the defective clamps, finger contacts and moving contacts, etc., in 230KV Breakers, LAs, CVT, CC Wave traps etc., at Switch yard I for Quarterly maintenance.
Cleaning tightness checking and assisting in MRT Testing works (a) In 230KV Main buses / Transfer bus , bus sections for SF6 Breakers and Isolators.
Cleaning and tightness checking of 3Nos HV Bushings and 6Nos LV Bushings in 230kV Station Transformer-I & II including cost of consumables
Cleaning and tightness checking 3 Nos lightning arrestors, 3 Nos Pedestal support insulators and its jumpers connection clamps tightness checking work , earth resistor box and neutral grounding transformer & arresting oil leaks in station transformer-I & II including cost of consumables
Removing jumpers of HV bushings, LV links Neutral bushings, LAs & Assisting MRT testing work and reconnecting of all jumpers after MRT testing work and tightness checking of Station Transformer-I & II including cost of consumables
Dismantling jumpers of HV bushing and assisting for MRT testing work and reconnection of jumpers after completion of MRT testing and cleaning of transformer, HV Bushing, LV bushing & Neutral bushing and arresting oil leaks of 230kV Spare Generator Transformer including cost of consumables
Half yearly maintenance of Spare Generator Transformer & Station Transformer-I,II. Cleaning & tightness checking of HV & LV bushing, Las, Pedestal support Insulator of 230kV Station Transformer-I,II and Spare Generator Transformer including arresting of oil leaks & cleaning of Transformer including cost of consumables
Opening the LV side champer door, releasing the LV terminal, cleaning the terminal and assisting with MRT for Transformer winding Tan delta testing, reconnecting of terminals and assembling the door after completion of MRT testing. (both ST-I,II) including cost of consumables
KUMAAR ENTERPRISES (BID ID -1547044)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_757433.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid