| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹34.8 L+₹2.0 L (6.04%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
1 Jan 2019, 9:00 amClosed
EE MGCCD-7, BIJNOR
EE MGCCD-7 BIJNOR
Construction of Canal From km11.200 to km.11.300 and D.R.B. at km. 11.207 of Panwasa Dy.
2018_UPIDC_287991_2
07/EE/2018-19
Open Tender
Civil Works - Canal
Item Wise
120 days
Panwasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
EE MGCCD-7 BIjnor
₹70,000
13 Jan 2020
27 Dec 2018
1 Jan 2019
27 Dec 2018
1 Jan 2019
27 Dec 2018
Amount
Earth work in Cutting in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and lead 30 m. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distances as directed by Engineer-in-Charge.
Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required levels and slopes also including carriage 600 M up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer-in-Charge.
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work per cum.
Cement concrete in 1:3:6 including all cost of material, labour , T&P etc. for completion of work per cum.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work. Per cum
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. per Sqm.
For C.C. Work
For R.C.C. Work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement concrete in 1:2:4 (M-15) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work. R/M
Supply and laying Tarfelt sheet in three layers on Bed Block including all cost of material, labour and T&P etc. complete. Per sqm.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete. Per sqm.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete. Per No..
Earth work in filling in ordinary soil including ramming and dressing the surface to be required level and slope also including carriage 600 M up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer-in-Charge.
Dry brick on edge soling laid dry filling joints including all cost of material, labour and T&P etc. all complete. Per sqm.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete. Per No..
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete. Per No..
Removal of diversion including 1.50 m lift and up to 100 m lead.
M/S J.V. CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .