Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹18.9 L+₹2.6 L (15.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹19.1 L+₹2.8 L (16.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.5 L
EMD Value
₹38,910
Closing Date
24 Sept 2026, 6:00 pmClosed
Executive Engineer
RnB Division Kralpora
Improvement/ Upgradation of Tarathpora inner lins, including Shiekh Mohalla Tarathpora and Hajam Mohalla Tarathpora
2026_PWDJK_324666_2
E tendering NIT No 37/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
45 days
Kralpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer RnB Division Kralpora
₹38,910
3 Oct 2026
14 Sept 2026
25 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
14 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A | |||||
| 2 | Site Clearance including dismatling of RCC slab and abutments etc and disposal of the same (Complete job) incl. diversion of Nallah and dewatering of Foundation Trenches till sub structure is completed | 1 | No | 7,000 | ₹7,000 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:in all kinds of soil | 12 | Cum | 256.85 | ₹3,082.2 |
| 4 | Supply and laying of Nallah muck behind abutments and in approaches including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 21.9 | Cum | 1,000 | ₹21,900 |
| 5 | Supply and laying of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density and level surface including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 1.8 | Cum | 1,000 | ₹1,800 |
| 6 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level. including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 1.2 | Cum | 5,500 | ₹6,600 |
| 7Centering and shuttering including strutting, propping etc. and removal of form work for | |||||
| 7.1 | Foundation footings, Basis of colums, Plinth beams, walls & Mass concrete | 4.2 | Sqm | 286.35 | ₹1,202.67 |
| 7.2 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 24.32 | Sqm | 628.95 | ₹15,296.06 |
| 7.3 | Suspended floors, roofs, landings, balconies and access platforms. | 33 | Sqm | 718.2 | ₹23,700.6 |
stage.html
html • 0.02 MB
finance_1095371.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.58 MB
BOQ_1095371.xls
BOQ • 0.39 MB
ExtensionNIT37.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .