Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹21.9 L
EMD Value
₹22,000
Closing Date
3 Jan 2025, 12:00 pmClosed
Superintending Engineer
132 KV Lalkuan Campus , Ghaziabad
Increasing Capacity at Vaishali sub-station
2024_UPTCL_982933_2
E-Tender No- T-08/ETC/GZB/2024-25
Open Tender
Electrical Works
Fixed-rate
30 days
132 kv s/s vaishali
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AS PER NIT
₹22,000
ghaziabad
10 Jan 2025
13 Dec 2024
3 Jan 2025
13 Dec 2024
3 Jan 2025
13 Dec 2024
1 Jan 2025
Amount
Dismantling OLD Equipments 132 KV/33KV level & Shifting to the store.
Dismantling of 132 KV Circuit Breaker
Dismantling of 132 KV Current Transformer
Dismantling of 132 KV Bus/Tendom Isolator
Dismantling of 120 KV L.A
Dismantling of 132/33 KV C&R Panel with control cable
Dismantling of 33 KV Circuit Breaker
Dismantling of 30 KV L.A
Erection of following bay equipment as per instruction manual of various equipment’s and technical specification including shifting of material / equipment from store to erection site including all other associated works to complete the job satisfactorily.
Erection & Commissioning of 145KV, 2000A, 40KA, SF6 Circuit Breaker with timing test and report
Erection of 145 Kv CT Ratio 400-200-100-01 A ,0.2 Class, 3 Core With Terminal Connector & installation of junction box.
Erection of 120 Kv, 10 KA, Surge Arresters
Erection of 145 Kv, 1250 A, 31.5 KA,Motorised Isolator (BI).
Erection of 145 Kv, 1250 A, 31.5 KA ,Motorised Isolator (TI).
Erection & Commissioning of VCB,36KV,2000A,31.5KA/3SEC
Erection of 30 Kv Surge Arresters
Erection of 33 Kv CT Ratio 2000-1250/01 A ,0.2 Class, 3 Core With Terminal Connector & installation of junction box.
Erection of following control and relay Panels as per instruction manual/Hydra and technical specification including shifting of panel from store to erection site First Floor on Control Room including all other associated works to complete the job satisfactorily.
Installation, Commissioning & Testing of 132/33 KV control Relay panel for 63 MVA Transformer.
Bay wise interconnection of equipment with specified conductor of various 132 KV & 33 KV Equipment with Main /Transfer / jack Bus bar of ACSR Zebra /Panther conductor. The work Includes cutting of conductor. Bending in proper shape clamping with the help of clamp and all other associated work to complete job.
132 KV Side Jumper with 132 KV Equipments.
33 KV side jumper with 33KV Equipments.
Laying and Termination of following size control cable in trench/cable trays from different control room equipment to 132&33 KV Isolator, circuit breakers CT/PT & their junction boxes. Transformer marshaling box. Isolator box & other outdoor equipment’s installed in 132/33 KV switch yard as per cable schedule with ferruls and lugs . Including carriage of cable drum from store and all other associated work.
Control cable of size 2 core x 2.5 mm2
Control cable of size 4 core x 2.5 mm2
Control cable of size 6 core x 2.5 mm2
Control cable of size 10 core x 2.5 mm2
Termination of control cable
Painting & Earthing of equipment’s by cutting straightening, bending, laying 700mm below ground and above ground of following size of MS flat for earthing of main and auxiliary structure, equipment’s structure. Transformer body and its neutral point including welding with main earthmat and with object to be earthed excavation of trenches its back filling. All other associated work as required to complete the work(MS flat will be provided by UPPTCL).
Laying of MS Flat of size 75x10 mm
Laying of MS Flat of size 50x6 mm
Erection of 63 MVA Transformers
Shifting of 63MVA Transformer main tank from unloading site to transformer plinth at 132KV S/S Vaishali approx. distance 20mtrs
Complete, erection of new 63 MVA T/F work includes erection of radiator, conservator tank, bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making control cables connection, buchholz relay etc. for completing the work, topping of T /F oil and final oil filling in tank, radiator, conservator tank and all other associated work for completion of job satisfactorialy.
Earthing of main tank of new 63 MVA T /F by using M.S. flat 50X6 / 75X10 mm size, it’s jointing with already laid earth mat / Deltas. Neutral bushing support for its earthing work.
Erection of new RTCC panel of this new 63 MVA T /F in control room at 132KV S/S VAISHALI
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating the T/F oil through PVT. centrifuging machine and taking the BDV/Water Content (PPM) value of the oil periodically till the required value is achieved .Approx. 22KL per T/F
Pre charging testing of Transformer with duly calibrated instruments along with proper submission of test reports including but not limited to following tests: 1. WRM 2. Turns ratio measurement 3. Tan Delta 4. SFRA 5. PIR tests
Dismantling of 40 MVA Transformers
Dismantling of 132/33KV, 40MVA Transformer at 132KV Substation Vaishali by dismantling the accessories, radiator, marshaling box etc
Partly drain out Transformer oil from tank, opening of Electrical connections etc
Shifting of 40MVA Transformer main tank from unloading site to transformer plinth at 132KV S/S Vaishali approx. distance 20mtrs
Additional Shifting 80M @ 5M per job
Packing of HV/LV/Neutral bushings into empty wooden crates
Loading, Carriage and Unloading for 63 MVA Transformers
Loading of 63 MVA T/F main tank along with accessories, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle.
Carriage of 63 MVA T/F tank from 220 KV Sub-station Sec-129 Noida to 132 KV Sub Station Vashali & carriage of all accessories by Pvt. Truck / Multi Axle Trailer . Distance about 30 Km.
Opening of latching of main tank of 63 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 63 MVA T/F like oil filled drums, bushing conservator tank, cooling fan etc. from Track/ Trailer at site 132 KV S/S Vaishali.
Technocrat Electrical (BID ID -4824048)
M/S AJAY TOMAR CONTRACTOR (BID ID -4829050)
M/s S.S. Refregeration (BID ID -4825691)
Hi-tech power transmission (BID ID -4830879)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .