Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC MITTAL FARM LOHARU ROAD CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹2.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹2.5 Cr+₹14.4 L (6.23%)Rejected-AOC VPO PANCH JATTAN SONEPAT 131001 | SONEPAT | SONIPAT | HARYANA | 131001 | ₹2.5 Cr+₹14.4 L (6.23%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹2.7 Cr+₹35.0 L (15.1%)Rejected-AOC BEHIND ANAJ MANDI SHASTRI NAGAR GALI NO 4 BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | ₹2.7 Cr+₹35.0 L (15.1%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹2.9 Cr+₹56.6 L (24.5%)Rejected-AOC 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | ₹2.9 Cr+₹56.6 L (24.5%) | L4 | Rejected-AOC Rejected |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
6 Jun 2023, 3:00 pmClosed
PARDEEP KUMAR
EE PHE Division Mohindergarh
Estimate for Construction of Aug. water works at Village Kherki Tehsil and Distt. Mohindergarh
2023_HRY_285227_1
202338DFE84A FB56 4E68 A4E7 7ED94F7D26E9597PUH
Open Tender
Civil Works
Works
480 days
KHERKI
Estimate for Construction of Aug. water works at Village Kherki Tehsil and Distt.Mohindergarh Construction of 1Raw water pumping station, 1 water works, laying the raw and clear water Rising main lines of different sizes Supply, Erection, testing
3 documents required · 3 mandatory
₹15,000
₹5.2 L
Yes
Mohindergarh
13 Jul 2023
26 May 2023
6 Jun 2023
26 May 2023
6 Jun 2023
26 May 2023
26 May 2023 - 29 May 2023
29 May 2023
Amount
Providing and fixing of LED Light 100 Watt , make of Standard Brand Complete in all respect
Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked 700 LPM 12 mtr head 5.00 BHP 2 No.
Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked 1050 LPM 40 mtr head 17.50 BHP 2 No.
Operation and maintenance for complete scope of work mentioned in the DNIT ( Disinfection material supplied by PHED)as per schduled -IV a period of five year after 12 month during defect liability period and 03 month trial run will be change to the A/mtc. estimate complete in all respect as per approved NIT. Operation and maintenance during defect liability period(operation only) after 03 month trial run.
Operation and Maintenance during 1st year after defect liability period.
Operation and Maintenance during 2nd year.
Operation and Maintenance during 3rd year.
Operation and Maintenance during 4th year.
Operation and Maintenance during 5th year.
Bidder Name
Amount
SUNIL KUMAR CONTRACTOR(GSTN-NA)
Devender Singh Contractor(GSTN-NA)
ANAND KUMAR CONT(GSTN-NA)
M/S SHREE BALAJI BUILDERS(GSTN-NA)
SUNIL KUMAR CONTRACTOR
Devender Singh Contractor
M/S SHREE BALAJI BUILDERS
Devender Singh Contractor
SUNIL KUMAR CONTRACTOR
M/S SHREE BALAJI BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .