| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.9 L+₹35,134 (1.28%)Rejected-AOC 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S RATHIKA CONSTRUCTIONS L1 | Vidhyut Nirman Corporation L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Light jungle and disposed away from the site as per instruction of Engineer at site including cost of all labour, lead, lift T&P etc complete. | 728 | m2 | 6 ₹4,368 | 1 ₹728 Lowest |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay,stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20B (Benching) | 237 | m3 | 200 ₹47,400 | 125 ₹29,625 Lowest |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 104 | m3 | 300 ₹31,200 | 225 ₹23,400 Lowest |
| 4.00 | SDR - (Not Requiring Blasting) Earth work excavation for foundation and depositing on bank with Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting and as per standard specification. | 63 | m3 | 300 ₹18,900 | 225 ₹14,175 Lowest |
| 5.00 | MR-&-DMR Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in medium rock and dense medium rock not requiring blasting complete. | 32 | m3 | 500 ₹16,000 | 225 ₹7,200 Lowest |
| 6.00 | Earth work excavation in hard rock by wedging , chisseling and trimming to proper shape where blasting is prohibited including all lead, lift etc as per standard specification. | 11 | m3 | 1,000 ₹11,000 | 500 ₹5,500 Lowest |
| 7.00 | Plain cement concrete in CC 1:3 :6 using 20mm HB metal without form work including cost of cement and all materials, labour, leads, lift etc., complete as per standard specification. | 29 | m3 | 4,800 ₹1,39,200 Lowest | 5,500 ₹1,59,500 |
| 8.00 | Reinforced cement concrete in C.C. 1:1 1/2 :3 mix, using 12 mm to 20mm HBG metal machine crushed without steel formwork including cost of cement, all materials, labour, curing, all leads & lifts, as per standard specification . ( but excluding cost of steel reinforcement ) | 59 | m3 | 7,000 ₹4,13,000 Lowest | 7,500 ₹4,42,500 |
| 9.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for curing,bending,tying and fixing in position as per specification including cost of all materials, lead,lift,labour, cost of binding wire etc., complete | 5,015 | Kg | 70 ₹3,51,050 Lowest | 85 ₹4,26,275 |
| 10.00 | Plain cement concrete in CC 1:2 :4 using 20mm HBG metal concrete with steel form work including cost of cement, all materials, labour charges, consolidation, curing, all lead, lift as per standard specification etc., complete. | 66 | m3 | 6,000 ₹3,96,000 Lowest | 8,500 ₹5,61,000 |
Tender Value
Refer Docs
EMD Value
₹28,100
Closing Date
16 Jun 2025, 2:00 pmClosed
SE GCC CBE
OFFICE OF THE SUPERINTENDING ENGINEER GENERAL CONSTRUCTION CIRCLE 182 Dr SUBBARAYAN STREET TATABAD COIMBATORE 641 012
Providing Various structural and equipment Plinths cable duct metal spreading water line for earthing system and other allied civil works for enhancement of the existing Power Transformer capacity at Marudhur 110 22 KV SS
2025_EB_563729_1
TS No. 09/25-26 of SE GCC Cbe
Open Tender
Civil Works
Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,100
Yes
18 Sept 2025
31 May 2025
16 Jun 2025
31 May 2025
16 Jun 2025
31 May 2025
Amount
Clearing the Light jungle and disposed away from the site as per instruction of Engineer at site including cost of all labour, lead, lift T&P etc complete.
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay,stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20B (Benching)
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20B
SDR - (Not Requiring Blasting) Earth work excavation for foundation and depositing on bank with Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting and as per standard specification.
MR-&-DMR Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in medium rock and dense medium rock not requiring blasting complete.
Earth work excavation in hard rock by wedging , chisseling and trimming to proper shape where blasting is prohibited including all lead, lift etc as per standard specification.
Plain cement concrete in CC 1:3 :6 using 20mm HB metal without form work including cost of cement and all materials, labour, leads, lift etc., complete as per standard specification.
Reinforced cement concrete in C.C. 1:1 1/2 :3 mix, using 12 mm to 20mm HBG metal machine crushed without steel formwork including cost of cement, all materials, labour, curing, all leads & lifts, as per standard specification . ( but excluding cost of steel reinforcement )
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for curing,bending,tying and fixing in position as per specification including cost of all materials, lead,lift,labour, cost of binding wire etc., complete
Plain cement concrete in CC 1:2 :4 using 20mm HBG metal concrete with steel form work including cost of cement, all materials, labour charges, consolidation, curing, all lead, lift as per standard specification etc., complete.
Labour charges for assembling of various plinths template for providing concrete,including transporting from one plinth to another aligning fixing to correct level and dismantling the template after concrete , including cost of labour , lead,lift etc.complete as per standard specification
Supplying and fabrication of grouting bolt in various sizes including cutting,bending,threading 100 mm length with galvanized and providing 2 nos . nuts with washer etc and fixing them in plinth including cost of materials , labour, lead, lift etc complete as per standard specification.
Brick work in C.M. 1:5, using chamber burnt bricks including, cost of cement, all materials, labour, curing, all leads and lifts ete,complete as per standard specification,
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 50 mm thickness in RCC 1:11/2:3, using 12 to 20mm HBGS jelly excluding cost of steel reinforcement in position but including cost of moulding charges, casting of slab, finishing, curing etc., complete complying with standard specification and as directed by the Engineer at site.
Supplying and fixing of galvanized angle to required length and fixing keeping in required alignment and level for cable duct and Chain Link fencing and wicket gate including cost of material and lead, lift, etc., complete, as per standard specification.
Labour charges for transporting cable duct cover slab from casting yard to site and placing over the cable duct properly according to the sizes as directed by the Engineer at site including cost of labour,lead,lift etc ..complete.
Supplying, laying and fixing of 75 mm dia. PVC pipe 4 Kg/cm2 to proper alignment & slope for weep hole of boundary wall including cost of pipe lead, lift labour as per standard specification etc., complete
Supplying and fixing RCC readymade collar of size 600mm dia and 300mm dia height with water pipe seating arrangements including cost of materials, transport to site , labour, leads, lifts, etc., complete.as per standard specification.
Supplying and fixing 25 mm dia GM gate ball valve ISI make of approved quality including cost of all materials, labour, lead, lift, etc., complete., as per standard specification
Supplying and fixing 40 mm dia GM gate ball valve ISI make of approved quality including including cost of all materials, labour, lead, lift, etc., complete., as per standard specification.
Supplying and laying and testing of 25 mm dia PVC pipe to resist 10 kg/cm2 pressure of approved good Quality ISI mark including cost of pipe, GI specials, all materials, lead, lift, etc., complete, as per standard specification.
Supplying and laying and testing of 40 mm dia PVC pipe to resist 10 kg/cm2 pressure of approved good Quality ISI mark including cost of pipe, GI specials, all materials, lead, lift, as per standard specification ,etc., complete.
Providing , fixing of brass chromium plated 15/ 12mm screw down bib cock(heavy duty) for water supply tap including cost of pipe and labour charges for fixing charges lead, lift, etc., complete, as per standard specification
Supplying, laying and tensioning of GI Chain link fencing with mesh size 50x50mm10gauge including cost of materials, all labour charges, lead, lifts as per standard specification, etc., complete.
Supplying and spreading 100 mm thick of 20 mm metal over crusher dust of 100 mm thick, including trimming charges, all materials, labour, all leads, and lifts, etc., complete.as per standard specification.
Plastering with CM 1:5, 12mm thick, including cost of cement, labour, curing, all leads and lifts etc., complete. as per standard specification
colour washing two coats of plastered wall surface with ready mixed weather proof emulsion paint of first quality apex or equivalent of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, complete complying with standard specification.
Re filling with excavated earth other than sand including watering consolidation in 150mm thick layer and forming platform around tower legs with excess earth etc., complete.
Dismatling existing PCC including cost of all labour, lead, lift etc complete as per instruction of Engineer at site as per standard specification .
Disposal of Excess surplus earth and concrete debris away in low lying area with a lead of 100m including cost of labour chrages etc.,
Uprooting existing trees including all labour, transporting charges etc complete as per instruction of Engineer at site complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Vidhyut Nirman Corporation (BID ID -1367695)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .