Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance | -19.99% | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.4 CrAdmitted-Finance | -18.66% | ₹4.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹4.5 CrAdmitted-Finance AT PENTHA PO PENTHA KENDRAPADA ODISHA 754244 | KENDRAPARA | ODISHA | 754244 | -18.09% | ₹4.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹4.5 CrAdmitted-Finance AT SAMALESWARI NAGAR BURLA SAMBALPUR PIN 768017 | SAMBALPUR | ODISHA | 768017 | -17.99% | ₹4.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹4.5 CrAdmitted-Finance PLOT NO VIM 844 SAILASHREE VIHAR CHANDRASEKHARPUR BHUBANESWAR 751016 | BHUBANESWAR | KHORDHA | ODISHA | 751016 | -16.87% | ₹4.5 Cr | L5 | Admitted-Finance |
Tender Value
₹5.4 Cr
EMD Value
₹5.4 L
Closing Date
16 Apr 2026, 5:00 pmClosed
CHIEF ENGINEER OPHWC
OPHWC BHUBANESWAR
Building Work
2026_OSPHW_127737_8
31/OPHWC/2025-26
National Competitive Bid
Civil Works - Buildings
365 days
Sambalpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹5.4 L
Yes
18 May 2026
2 Apr 2026
17 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | CVL | - | - | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | 50000002
Earthwork in disintintigrated rock not requiring blastingto be removed by pickaxe crowbars and depositing materials within 50m. initial lead and 1.5m. initial lift including rough dressing as per direction and specification of the deptt. includig stacking useful materials separately as ordered in foundation.
Ground Floor | 238.93 | CUM | 679.83 | ₹1,62,431.78 | BI01010001010000000000000515BI0100001114 |
| 3 | 50000003
Providing and laying plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curing, shuttering etc. complete at all depth and height.
Ground Floor | 37.34 | CUM | 5,159.61 | ₹1,92,659.84 | BI01010001010000000000000515BI0100001115 |
| 4 | 50000017
Supplying of filling sand in foundation and plinth including watering, ramming, consolidating and dressing, labours, tools all complete.
Ground Floor | 147.14 | CUM | 724.78 | ₹1,06,644.13 | BI01010001010000000000000515BI0100001116 |
| 5 | 50000020
12mm thick cement plaster in cement mortar 1:6 (1cement:6sand) including necessary scaffolding curing etc. all complete at all depth and height.
Ground Floor | 83.2 | SQM | 188.53 | ₹15,685.7 | BI01010001010000000000000515BI0100001117 |
| 6 | First Floor | 361.03 | SQM | 196.25 | ₹70,852.14 | BI01010001010000000000000515BI0100001118 |
| 7 | Second Floor | 361.03 | SQM | 204.35 | ₹73,776.48 | BI01010001010000000000000515BI0100001119 |
| 8 | Third Floor | 361.03 | SQM | 212.85 | ₹76,845.24 | BI01010001010000000000000515BI0100001120 |
| 9 | Forth Floor | 106.85 | SQM | 221.77 | ₹23,696.12 | BI01010001010000000000000515BI0100001121 |
| 10 | 50000021
6mm thick cement plaster in cement mortar 1:4 (1 cement:4 sand) to R.C.C surfaces finished smooth including closed deep chipping and slurry treatment with necessary scaffolding, curing etc. all complete at all depth and height for inside and outside surfaces.
Ground Floor | 284.69 | SQM | 208.34 | ₹59,312.31 | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
DTCN8.pdf
Tender Documents • 1.47 MB
BOQ_586930.xls
BOQ • 1.54 MB
Download all tender documents and submit your bid