Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC BAHIRSARBAMANGALAPARA JAILKHANA MATH BURDWAN | BURDWAN | BURDWAN | WEST BENGAL | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹10.2 L+₹33,753.79 (3.43%)Rejected-AOC WEST BENGAL | DINAJPUR DAKSHIN | WEST BENGAL | 733101 | L2 | Rejected-AOC L2 BIDDER | |
| 3 | L3₹10.3 L+₹43,623.32 (4.44%)Rejected-Finance | L3 | Rejected-Finance EMD TO BE REFUNDED |
Tender Value
₹9.9 L
EMD Value
₹19,739
Closing Date
28 Feb 2026, 11:00 amClosed
EXECUTIVE ENGINEERCIVIL)
1ST ADMINISTRATIVE BUILDING,CITY CENTRE,DURGAPUR
CIVIL WORKS
2026_ADDA_1012229_1
ADDA/DGP/ED/N-88/2025-26(SL-1)
Open Tender
CIVIL WORKS
Percentage
90 days
CITY CENTRE, DURGAPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,739
18 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (i) With pumping out water including shoring as required.
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
Supplying and laying Polythene Sheet (150gm/ sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (c) M-15 Grade: Using concrete mixer.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
Add, G S T. @ 18.00% over the Item no. - 1 to 5
Add, C E S S @ 1.00% over the Item no. - 1 to 6
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
BOQ_2485749.xls
BOQ • 0.28 MB
TenderBook.pdf
Tender Documents • 1.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .