| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 Cr+₹9.5 L (4.29%)Rejected-AOC | ₹2.3 Cr+₹9.5 L (4.29%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.8 Cr+₹61.7 L (27.9%)Rejected-AOC 3209 SECTOR 44 D CHANDIGARH 160047 | CHANDIGARH | CHANDIGARH | 160047 | ₹2.8 Cr+₹61.7 L (27.9%) | L3 | Rejected-AOC L3 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
22 Jan 2020, 2:30 pmClosed
Executive Engineer Patiala Drainage Division Patia
Executive Engineer Patiala Drainage Division Patiala
REPAIRING AND CHANNELIZATION OF JACOB DRAIN FORM RD 47960 TO 52000
2020_WR_42644_1
08A/spl
Open Tender
Civil Works - Others
Item Rate
365 days
patiala drainage division patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
TIA
₹4.4 L
patiala drainage division patiala
11 Mar 2020
1 Jan 2020
22 Jan 2020
1 Jan 2020
22 Jan 2020
1 Jan 2020
16 Jan 2020
Amount
PROVIDING AND LAYING CONCRETE LINING CEMENT 7.5CM TH OR LESS LAID MANUALLY FOR IRRIGATION CHANEL USING CEMENT CONRETE M-15 MIXED IN AN AUTOMATIC COMPUTERIZED BATCHING & MIXING PLANT AND TRANSPORTED TO THE SITE IN TRANSIT MIXER INCLUDING SUPPLY, CARRIAGE, LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECT AS PER DRAWING AND PWD SPECIFICATION
PROVIDING AND LAYING CEMENT CONCRETE M-15 (1:2:4) WITH STONE BALLAST OR SHINGLE USING CONCRETE MIXER VOLUMETRIC TYPE AND NEEDLE VIBRATOR INCLUDING SUPPLY, CARRIAGE, LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECT.
PROVIDING AND LAYING CEMENT CONCRETE M-15 FOR SLEEPERS MIXED IN AN AUTOMATIC COMPUTERIZED BATCHING & MIXING PLANT AND TRANSPORTED TO THE SITE IN TRANSIT MIXER INCLUDING SUPPLY, CARRIAGE, LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECT IN PWD SPECIFICATION
COMPACTION OF EARTHWORK IN 20 CM LAYERS, DRESSING, WATERING, ROLLING OF EARTH COMPLETE IN ALL RESPECT
DRESSINGBED AND PREPRATION OF SUB GRADE FOR LINING COMPLETE IN ALL RESPECT
JUNGLE CLEARANCE ON RUNNING CANALS AND BRANCHES AND DRAIN WITH DISCHARGE MORE THAN 9 CUM/S (MEDIUM)
Construction of Bundh and ramp by using hydraulic JCB and HYDRAULIC Tractor trolley with disposal upto I/c Cutting and loading in trolley TRIMMING BOTTOM AND SIDE SLOPES, IN ACCORDANCE WITH REQUIREMENT OF GRADES AND CROSS SECTIONS, and transporting to embankment location with all lead 28 km
Removal of bundh and ramps by USING HYDRAULIC EXCAVATOR CK 90 excavation with hydraulic excavator 0.90 cum bucket capacity i/c cutting AND LOADING IN TIPPERS AND trimming bottom and side slopes in accordance with requirement of lines, grades and cross sections WITH ALL LIFTS combined lead upto 60mtr
PROVIDING & LAYING P.C.C. 1:3:6 (M-10) WITH 40MM GAUGE STONE AGGREGATE USING CONCRETE MIXER VOLUMETRIC TYPE I/C, S/O AND C/O & LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECTS AS PER P.W.D SPECIFICATIONS
LAYING FIRST CLASS BRICK MASONRY IN 1:4 C.S.M. IN FOUNDATION AND PLINTH INCLUDING S/O, C/O, LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECTS.
PUTTING 1:3 (CEMENT:WATER) CEMENT SLURRY WITH CEMENT @2.25 KG/SQM ON PREPARED BED AND SIDE SLOPE LAYING CONCRETE ON BED AND SIDE SLOPES I/C, S/O AND C/O & LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECTS
PROVIDING AND LAYING FIRST LAYER OF 12.5 MM THICK CEMENT PLASTER 1:3 ON SUB GRADE AND FINISHED EXISTING BRICK LINING IN SIDE SLOPES INCLUDING S/O, C/O, LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECTS.
PROVIDING AND LAYING SECOND LAYER OF 10 MM THICK CEMENT PLASTER 1:3 PROPERLY RENDERED AND FINISHED OVER FIRST LAYER INCLUDING S/O, C/O, LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECTS
PROVIDING AND LAYING 12.50 MM THICK CEMENT PLASTER IN 1:4 C.S.M FOR FENCING TOE WALL i/c s/o ,c/o , LOADING AND UNLOADING OF MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECT
EXTRA ALLOWANCE FOR SCAFFOLDING FOR PLASTER FOR SIDE SLOPES ONLY
PAINTING ONE COAT OF BITUMEN OVER CONCRETE SURFACE AT JOINT OF SIDE LINING & TOP OF SLEEPER FOR CONSTRUCTION JOINT EXPANSION JOINT & CONTRACTION JOINT @ 0.69 KG PER SQM COMPLETE IN ALL RESPECT.
FILLING EXPANSION JOINT 12.5MM WIDE , 75MM DEEP WITH SEALING COMPOUND INCLUDING SUPPLY AND CARRIAGE OF ALL MATERIAL COMPLETE IN ALL RESPECT
PROVIDING, RUNNING AND MAINTENANCE OF PUMPING SET 8 H.P. / GENERATOR SET FOR DEWATERING ARRANGEMENTS COMPLETE IN ALL RESPECT
REMOVAL/CLEARANCE OF SLUSH FORM WET DRAIN BY MECHANICAL MEANS.
CARRIAGE OF SLUSH TO THE DUMP SITE WITH LEAD UPTO 3.50KM(PUCCA) USING HYDRAULIC EXCAVATOR AND TIPPERS INCLUDING CUTTING AND LOADING IN TIPPERS AND TRANSPORTING TO EMBANKMENTS LOCATIONS WITH ALL LIFTS AND LEAD.
RAKING CLEANING AND FILLING OF HOLLOW JOINTS IN CEMENT SAND 1:3 ON SIDE SLOPES OF LINED CHANNEL WHEN DEPTH IS MORE THAN 5 FT AND WORK IS DONE IN CLOSURE
PROVIDING AND FIXING STRUCTURAL STEEL IN FLATS, ANGLES, TESS, RIVETINGS AND WELDING I/C CUTTING, FIXING ALL GUSSET PLATES BOLTS, NUTS, RIVETS, WELDING ROADS ETC WITH HOISTING AND ERECTION IN POSITION:
TEES, ANGLES AND CHANNELS
FLATS
PROVIDING G.I. WIRE AT SITE OF WORK 4MM DIA on top of angles.
PROVIDING AND FIXING 5 FFET IRON MESH FENCING ON ANGLE IRON INCLUDING SUPPLY CARRIAGE LOADING UNLOADING MATERIALS COMPLETE IN ALL RESPECT (M.R)
PAINTING TWO COATS ANTI CORROSIVE BITUMASTIC PAINT TO GIVE AN EVEN SHADE WITH SPECIAL QUALITY
PROVIDING ORANGE COLOUR SAFETY FOOT REST MININMUM 6MM THICK PLASTIC ENCAPSULATED AS PER IS 10910 ON 12MM DIA STEEL BAR CONFIRMING IS 1786 HAVING MINIMUM CROSS SECTION AS 23MM X 25MM AND OVERALL MINIMUM LENGTH 283MM AND WIDTH AS 165MM WITH MINIMUM 112MM SPACING BETWEEN PROTUTED LEGS HAVING 2MM TREAD ON TOP SURFACE BY RIBBING OR CHEQUERING BESIDES NECESSARY AND ADEQUATE ANCHORING PROJECTIONS ON TRAIL LENGTH ON 138 MM AS PER STANDARD DRAWING AND SUITABLE TO WITH STAND THE BEND TEST AND CHEMICAL RESISTANCE TEST AS PER SPECIFICATION AND HAVING MANUFACTURER’S PERMANENT IDENTIFICATION MARK TO BE VISIBLE EVEN AFTER FIXING, INCLUDING FIXING IN MANHOLES WITH 230X150X75CM CONNCRETE BLOCK 1:2:4( 1 CEMENT: 2 SAND : 4 STONE AGGREGATE) AS PER STANDARD DESIGN
Earth work in excavation in foundation, trenches etc in all kind of soil where pick jumpers work is not involved and not exceeding to 2.0 mtr depth i/c dressing of bottom sides of trenches, stacking the excavated soil clear from edges of excavation
M S RAJINDER PAL
M/s Jaswant Rai Verma
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .