Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | -6.13% | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.20% | ₹1.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.2 LAdmitted-Fee/PreQual/Technical/Finance KANCHALHKOOT | KANNAUJ | UTTAR PRADESH | 209720 | +0.00% | ₹1.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.2 L
EMD Value
₹3,540
Closing Date
18 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONSTRUCTION OF CULVERT NLO Asif Manzoor Sheikh
2026_RDPR_320416_46
NIT NO 94 OF 2026-27 ADF WAVOORA
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹3,540
23 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
11 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30cm and upto 1.5mtr in depth, 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth to be levelled and neatly dressed in all kinds of soil. | 6 | CUM | 479.3 | ₹2,875.8 |
| 2 | Providing and laying of RBM / Nallah Musk including spreading and compacting Complete Job | 1.5 | CUM | 1,000 | ₹1,500 |
| 3 | 1:4:8 (1 cement :` coarse sand : 6 graded stone aggregate 40 mm nominal size) | 1.2 | CUM | 5,202.9 | ₹6,243.48 |
| 4 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.5 | CUM | 5,733.6 | ₹25,801.2 |
| 6 | 1:1:5:3(1 cement : 1:5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.3 | CUM | 7,275.25 | ₹16,733.07 |
| 7 | CENTERING & SHUTTERING INCL REMOVAL OF F/WORKK | 23.5 | SQM | 576 | ₹13,536 |
| 8 | Providing and Fixing in position of TMT steel bars for reinforcement steel in the Slab , beam | 371 | KGS | 120 | ₹44,520 |
| 10 | Carriage of material by mechnical transporT Sand for an avg. lead of 40km | 12.5 | CUM | 465 | ₹5,812.5 |
| 11 | Add Cost Of CIB | 1 | NO | 1,600 | ₹1,600 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1065475.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].