| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAdmitted-Finance ASHOK NAGAR ETAWAH ETAWAH UTTAR PRADESH 206001 | ETAWAH | UTTAR PRADESH | 206001 | L1 | Admitted-Finance | |
| 2 | L2₹16.6 L+₹28,252.14 (1.73%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹16.8 L+₹41,943.86 (2.57%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹18.4 L+₹2.0 L (12.5%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical ETAWAH | - | Rejected-Technical point no 1,5 of nit |
| Sl No | Description | Qty | Unit | M/S SHREYA ENTERPRISES L4 | Singh Iron Industries L1 | M/S Saajan Tripathi L2 | M/s SINGH BROTHERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dewatering | 85 | HOURS | 110 ₹9,350 | 2,112 ₹1,79,520 | 102 ₹8,670 Lowest | 150 ₹12,750 |
| 2.00 | Excavation of Earth work with Machine including lead and lift work etc proper completion of work as directed by engineer i/c | 13,485.16 | CUM | 64 ₹8,63,050.24 | 64 ₹8,63,050.24 | 58 ₹7,82,139.28 Lowest | 58 ₹7,82,139.28 Lowest |
| 3.00 | Earth work by labour | 2,379.73 | CUM | 70 ₹1,66,581.1 | 23 ₹54,733.79 Lowest | 64 ₹1,52,302.72 | 61 ₹1,45,163.53 |
| 4.00 | Extra 1 lead and 2 lift (50% of labour) | 1,189.87 | CUM | 50 ₹59,493.5 | 52 ₹61,873.24 | 46 ₹54,734.02 Lowest | 48 ₹57,113.76 |
| 5.00 | Compaction with mechanical machine including watering charges ( 100% of total exxavated quality) | 15,864.89 | CUM | 20 ₹3,17,297.8 | 9.5 ₹1,50,716.45 Lowest | 18 ₹2,85,568.02 | 19.5 ₹3,09,365.35 |
| 6.00 | Earth work in excavation in soil for foundation inlet and outlet | 75.5 | CUM | 84.5 ₹6,379.75 | 54.4 ₹4,107.2 Lowest | 80 ₹6,040 | 68.5 ₹5,171.75 |
| 7.00 | GSB CC (1:3:6) CEMENT SAND AND 22-40 MM STONE BALLAST | 7.64 | CUM | 7,587.14 ₹57,965.75 | 3,240 ₹24,753.6 Lowest | 7,050 ₹53,862 | 6,440 ₹49,201.6 |
| 8.00 | M 15 BRICK Massonay (1:3) Cement Sand Mortar | 19.46 | CUM | 6,446.34 ₹1,25,445.78 | 3,807 ₹74,084.22 Lowest | 5,750 ₹1,11,895 | 5,350 ₹1,04,111 |
| 9.00 | Plaster of Brick Massonay (1:3) Cement Sand Mortar | 59.22 | SQ. M. | 231.9 ₹13,733.12 | 104.8 ₹6,206.26 Lowest | 205 ₹12,140.1 | 189 ₹11,192.58 |
| 10.00 | P.C.C. (1:2:4) CEMENT SAND AND 20 MM GS GRIL | 0.4 | CUM | 9,414.55 ₹3,765.82 | 3,985 ₹1,594 Lowest | 8,550 ₹3,420 | 7,700 ₹3,080 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
5 Feb 2021, 2:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer Minor Irrigation ETAWAH
CONSTRUCTION / RENOVATION OF ATARA NISP TALAB AT VILLAGE - ATARA NISP TIRWA BLOCK JALALABAD - KANNAUJ.
2021_UPMID_550241_1
867 /M.I/Acct/TENDER /POND/2020-21 Date25.01.2021
Open Tender
Civil Works
Fixed-rate
60 days
KANNAUJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
EEMI
₹2.0 L
8 Feb 2021
30 Jan 2021
6 Feb 2021
30 Jan 2021
5 Feb 2021
30 Jan 2021
Amount
Dewatering
Excavation of Earth work with Machine including lead and lift work etc proper completion of work as directed by engineer i/c
Earth work by labour
Extra 1 lead and 2 lift (50% of labour)
Compaction with mechanical machine including watering charges ( 100% of total exxavated quality)
Earth work in excavation in soil for foundation inlet and outlet
GSB CC (1:3:6) CEMENT SAND AND 22-40 MM STONE BALLAST
M 15 BRICK Massonay (1:3) Cement Sand Mortar
Plaster of Brick Massonay (1:3) Cement Sand Mortar
P.C.C. (1:2:4) CEMENT SAND AND 20 MM GS GRIL
M.S. WORK IN PLANE WORK SUCH AS RCC
ISI NP3 CLASS RCC SPUN PIPE 1000 MM 2.5 M LONG EACH
COLLER OF ISI NP3 CLASS RCC SPUN PIPE 1000 MM 2.5 M LONG EACH
M/S Saajan Tripathi
M/s SINGH BROTHERS
M/S SHREYA ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .