Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.8 L+₹27,842.50 (5.00%)Admitted-Finance | ₹5.8 L+₹27,842.50 (5.00%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹45,384.10 (8.15%)Admitted-Finance | ₹6.0 L+₹45,384.10 (8.15%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical PURAINA PURE HIMANCHAL HOUSE NO 123 MALAON PARASPUR GONDA | GONDA | UTTAR PRADESH | 271001 | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | PRAGATI CONSTRUCTION L1 | AKASH ASSOCIATES L2 | Prakash Work Construction L3 |
|---|---|---|---|---|---|---|
| 1.00All these below items/materials from S.N. 1.01 to 1.08 will be given and errected by the contractor at his own cost as per estimate/Resspo Norms. | ||||||
| 1.01 | Nut and bolt off size with washers | 17 | Kg. | 250 ₹4,250 Lowest | 262.5 ₹4,462.5 | 270.38 ₹4,596.46 |
| 1.02 | Suspension Clamp | 82 | No. | 290 ₹23,780 Lowest | 304.5 ₹24,969 | 313.64 ₹25,718.48 |
| 1.03 | PG clamp | 24 | No. | 280 ₹6,720 Lowest | 294 ₹7,056 | 302.82 ₹7,267.68 |
| 1.04 | Dead end clamp | 23 | No. | 300 ₹6,900 Lowest | 315 ₹7,245 | 324.45 ₹7,462.35 |
| 1.05 | LT clamp with nut and bolt | 105 | No. | 300 ₹31,500 Lowest | 315 ₹33,075 | 324.45 ₹34,067.25 |
| 1.06 | Eye-hook | 105 | No. | 280 ₹29,400 Lowest | 294 ₹30,870 | 302.82 ₹31,796.1 |
| 1.07 | Three phase distribution box with clamp | 30 | No. | 350 ₹10,500 Lowest | 367.5 ₹11,025 | 378.53 ₹11,355.9 |
| 1.08 | Battery Charger | 1 | Set | 8,000 ₹8,000 Lowest | 8,400 ₹8,400 | 8,652 ₹8,652 |
| 2.00Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.10) from Electricity Store Centre, Gonda to the work site/dump site. | ||||||
Tender Value
₹5.7 L
EMD Value
₹5,700
Closing Date
23 Jun 2026, 5:00 pmClosed
SE EDC GONDA
EDC GONDA
46/EDC(G)/2026-27
2026_MVVNL_1156836_17
NVS-30-46/EDC(G)/2026-27
Open Tender
Electrical Works
Item Rate
90 days
EDC GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
SE EDC GONDA
₹5,700
Yes
EDC GONDA
3 Jul 2026
4 Jun 2026
24 Jun 2026
4 Jun 2026
23 Jun 2026
4 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1All these below items/materials from S.N. 1.01 to 1.08 will be given and errected by the contractor at his own cost as per estimate/Resspo Norms. | |||||
| 1.01 | Nut and bolt off size with washers | 17 | Kg. | 100 | ₹1,700 |
| 1.02 | Suspension Clamp | 82 | No. | 100 | ₹8,200 |
| 1.03 | PG clamp | 24 | No. | 100 | ₹2,400 |
| 1.04 | Dead end clamp | 23 | No. | 100 | ₹2,300 |
| 1.05 | LT clamp with nut and bolt | 105 | No. | 100 | ₹10,500 |
| 1.06 | Eye-hook | 105 | No. | 100 | ₹10,500 |
| 1.07 | Three phase distribution box with clamp | 30 | No. | 100 | ₹3,000 |
| 1.08 | Battery Charger | 1 | Set | 100 | ₹100 |
| 2Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.10) from Electricity Store Centre, Gonda to the work site/dump site. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_2167768.xls
BOQ • 0.25 MB
46.pdf
Tender Documents • 0.58 MB
3146.pdf
PDF • 0.22 MB
TN31To46BP.pdf
PDF • 0.17 MB
3046.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .