| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L Quoted ₹6.9 L | L1 | Accepted-AOC Accept |
| 2 | L2₹7.1 LRejected-AOC | ₹7.1 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | R Chandrasekaran L2 | A2A CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Construction of RCC Slab Culvert 1.50m Span @ Colony Nallathangal Kovil in Vadapoondi Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton soil and hard gravelly soil as per SS 20 B for foundation 0.-0.30 | 50.88 | no | 288.7 ₹14,689.06 | 253.7 ₹12,908.26 |
| 1.02 | Cement concrete 1:4:8 mix using 40 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed | 6.36 | rm | 5,541.42 ₹35,243.43 | 5,506.42 ₹35,020.83 |
| 1.03 | Cement concrete 1:3:6mix using40 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed | 58.67 | rm | 5,845.94 ₹3.4 L | 5,810.94 ₹3.4 L |
| 1.04 | Towards Centering for soffitrs of RCC items of works including cost and conveyance all labour charges etc, complete. Abutment I II III | 55.62 | no | 572.5 ₹31,842.45 | 537.5 ₹29,895.75 |
| 1.05 | Towards Centering for soffitrs of RCC items of works including cost and conveyance all labour charges etc, complete. Abutment Above | 73.19 | no | 1,122 ₹82,119.18 | 1,087 ₹79,557.53 |
| 1.06 | Cement concrete 1:2:4 mix using 20 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed | 3.36 | no | 6,936.04 ₹23,305.09 | 6,901.04 ₹23,187.49 |
| 1.07 | Cement concrete 1:1.5:3 mix using 20 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed | 3.31 | no | 9,434.97 ₹31,229.75 | 9,399.97 ₹31,113.90 |
| 1.08 | Supply and fabrication of steel including cost and conveyance to site and all labour charges for cutting, bending and tying the rods and as directed etc complete. | 0.35 | m | 91,920.3 ₹32,172.11 | 91,885.3 ₹32,159.86 |
| 1.09 | Provision for Name board charges | 1 | no | 4,500 ₹4,500 | 500 ₹500 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
22 Dec 2025, 3:00 pmClosed
BDO THIYAGADURGAM
BDO THIYAGADURGAM
Construction of RCC Slab Culvert 1.5m Span at Colony Nallathangal Kovil in Vadapoondi Panchayat
2025_RDTN_633212_1
TN/KKI/TGM/PMAGY25-56/4
Open Tender
Civil Works
90 days
BDO THIYAGADURGAM
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,000
Yes
21 Jan 2026
17 Dec 2025
22 Dec 2025
17 Dec 2025
22 Dec 2025
17 Dec 2025
Amount
Construction of RCC Slab Culvert 1.50m Span @ Colony Nallathangal Kovil in Vadapoondi Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton soil and hard gravelly soil as per SS 20 B for foundation 0.-0.30
Cement concrete 1:4:8 mix using 40 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed
Cement concrete 1:3:6mix using40 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed
Towards Centering for soffitrs of RCC items of works including cost and conveyance all labour charges etc, complete. Abutment I II III
Towards Centering for soffitrs of RCC items of works including cost and conveyance all labour charges etc, complete. Abutment Above
Cement concrete 1:2:4 mix using 20 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed
Cement concrete 1:1.5:3 mix using 20 mm IS HBG metal including cost and conveyance to site and all labour charges including curing etc complete as per specification and as directed
Supply and fabrication of steel including cost and conveyance to site and all labour charges for cutting, bending and tying the rods and as directed etc complete.
Provision for Name board charges
Provision for photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R Chandrasekaran (BID ID -1540433)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_757556.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid