| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.7 LAccepted-AOC | ₹97.7 L Quoted ₹98.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 CrRejected-Finance | ₹1.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.1 CrRejected-Finance | ₹1.1 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | JANGBO L2 | Chhering L3 | KAMI SHERPA L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 metres complete in all respects as per direction of the Engineer-in-charge. (Pick work 40%, Jumper work 20% & Chiselling/wedging out of rock where blasting is prohibited : Hard Rock 40%) (Pattra Cutting) | 685.25 | Cum | 1,900 ₹13,01,975 | 2,000 ₹13,70,500 | 1,700 ₹11,64,925 |
| 2.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 metres complete in all respects as per direction of the Engineer-in-charge. (Pick work 100%) (R/walls) | 14.17 | Cum | 450 ₹6,376.5 | 500 ₹7,085 | 425 ₹6,022.25 |
| 3.00 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres complete in all respects as per direction of the Engineer-in-charge. (Pick work & Jumper work 50% Each) | 851.34 | Cum | 900 ₹7,66,206 | 950 ₹8,08,773 | 880 ₹7,49,179.2 |
| 4.00 | Providing and laying in position cement concrete 1:3:6 (1 Cement : 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 4.63 | Cum | 24,500 ₹1,13,435 | 25,000 ₹1,15,750 | 24,000 ₹1,11,120 |
| 5.00 | Providing and laying in position cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 3 | Cum | 23,500 ₹70,500 | 24,000 ₹72,000 | 23,200 ₹69,600 |
| 6.00 | Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand) : 10 graded stone aggregate 40 mm nominal size) in retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchorblocks, plain window sills, fillets, sunken floor etc., up to floor five level, excludingthe cost of centering, shuttering and finishingin all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 88.68 | Cum | 21,200 ₹18,80,016 | 21,500 ₹19,06,620 | 20,900 ₹18,53,412 |
| 7.00 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 0.69 | Cum | 25,200 ₹17,388 | 25,500 ₹17,595 | 25,000 ₹17,250 |
| 8.00 | Providing and laying in position reinforced cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 0.6 | Cum | 26,100 ₹15,660 | 26,200 ₹15,720 | 25,600 ₹15,360 |
| 9.00 | Providing and laying reinforced cement concrete 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 1.62 | Cum | 25,700 ₹41,634 | 25,800 ₹41,796 | 25,600 ₹41,472 |
| 10.00 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 2.11 | Cum | 27,500 ₹58,025 | 28,100 ₹59,291 | 26,350 ₹55,598.5 |
Tender Value
₹1.0 Cr
EMD Value
₹1.8 L
Closing Date
8 Apr 2026, 10:30 amClosed
Executive Engineer
O/O Executive Engineer Jal Shakti Division Keylong District Lahaul Spiti HP
CO Diversion Weir Crate walls Inlet Chamber Retaining Wall Anchor Blocks RCC Pillars Providing laying jointing and testing of HDPE pipe 355mm dia including Pattra cutting 450 Rmt MSERW pipe 350mm dia 6 Rmt at various location in between RD 7350 to
2026_HPIPH_132864_1
16955-17005 dated 30.03.2026 FIS KhandipJob 3
Open Tender
Civil Works - Water Works
730 days
Keylong Lahaul Spiti HP
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,000
₹1.8 L
16 Jun 2026
30 Mar 2026
8 Apr 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.68 MB
Form6.pdf
Tender Documents • 0.44 MB
Form8KhandipJob3.pdf
Tender Documents • 1.41 MB
TCJob3.pdf
Additional Documents • 2.45 MB
BOQ_196491.xls
BOQ • 0.31 MB
CorrKhadip3.pdf
PDF • 0.78 MB
Download all tender documents and submit your bid