| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-AOC 142 | ₹5.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.3 Cr+₹42.4 L (7.15%)Rejected-AOC | ₹6.3 Cr+₹42.4 L (7.15%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.4 Cr+₹1.5 Cr (25.7%)Rejected-AOC | ₹7.4 Cr+₹1.5 Cr (25.7%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | - | - | Rejected-Technical INCOMPLETE DOCUMENTS |
Tender Value
₹7.7 Cr
EMD Value
₹15.4 L
Closing Date
29 Jan 2020, 10:00 amClosed
SE EGCCC HARIDWAR
SE EASTERN GANGSA CANAL CONSTRUCTION CIRCLE HARIDWAR
Construction of Gulalwali Cross Regulator At Km. 34.870 of Eastern Ganga MainCanal In Distt. Bijnor
2020_UPIDC_424857_1
02/SE/2019-20
Open Tender
Civil Works - Canal
Item Rate
180 days
BIJNOR
PLEASE REFER TERNDER DOCUMENTS
2 documents required · 2 mandatory
₹354
UP e-Tender Online Account
₹15.4 L
Yes
22 Mar 2021
22 Jan 2020
29 Jan 2020
22 Jan 2020
29 Jan 2020
22 Jan 2020
Amount
Uprooting Jhunds i/c Back Filling and disposal upto 30 m.
Earthwork in Excavation in foundation in Ordinary Soil i/c all lift and lead, and earth from Excavation to be used for raising banks i/c labour and T&P for proper completion of work.
Earthwork in raising of banks in Ordinary Soil i/c compacting and dressing the surface to required levels and slopes and also i/c all lift and lead upto 3.000 Km by power transport and i/c cost of all Labour and T&P for proper completion of work.
Supplying and Filling R.B.M. in back Filling of foundation i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work.
Supplying and Laying Boulders (minimum 300 mm) in launching Apron i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work.
Supplying and Laying Boulders (minimum 300 mm) in Pitching i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work.
Supplying and Placing graded Filter in Layers i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work.
Coarse Sand
Pea Gravel 4.75-10 mm
Shingle 10mm to 37.25 mm Size.
Supplying and Laying Ready Mix Concrete in M-10 PCC with 43 grade OPC cement i/c all lead and lift, mechanical vibration and i/c cost of material and labour but excluding cost of centering and shuttering.
Supplying and Laying Ready Mix Concrete in M-15 PCC with 43 grade OPC cement i/c all lead and lift, mechanical vibration and i/c cost of material and labour but excluding cost of centering and shuttering.
Supplying and Laying Ready Mix Concrete in M-25 PCC with 43 grade OPC cement i/c all lead and lift, mechanical vibration and i/c cost of material and labour but excluding cost of centering and shuttering.
Form work for Concrete Block and sleepers
Casting and Laying in position Concrete Block i/c cost of all material, form work, labour and T&P etc required for proper completion of work.
Supplying and Laying well graded Shingle in Gaps of Cement Concrete Block i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work.
Supplying and Laying Ready Mix Concrete in M-30 PCC with 43 grade OPC cement i/c all lead and lift, mechanical vibration and i/c cost of material and labour but excluding cost of centering and shuttering.
Supplying and Laying Ready Mix Concrete M-25 in RCC with 43 grade OPC cement i/c all lead and lift, mechanical vibration and i/c cost of material and labour but excluding cost of reinforcement and centering and shuttering.
HYSD (fe-415) Steel Reinforcement for R.C.C. work i/c bending, binding, cutting, placing, cost of all material, labour and T & P etc for proper completion of work.
R.R. Masonary in C.C. in 1:3:6 in Parapet i/c all cost of material, labour,T&P etc required for proper completion of work.
Cement Pointing (Raised) in 1:2 C.M on Stone masonry i/c cost of all materials, labour and T&P etc for proper completion of work
Centering and shuttering in Curves.
Ordinary Centering of line ply wood or steel shuttering for RCC work.
Providing and fixing expansion joint in bridge slab including cost of all material (M.S. Angle ISA 50X50X6 and Ply Board) cutting, welding, labour and T&P as required for proper completion of work.
Supplying & Fixing 75 mm dia P.V.C pipe for drainage spouts i/c Cost of all Material, Labour and T&P etc.
Providing and fixing Diamond seal i/c cost of all material, labour T & P etc as required for proper completion of work.
Providing and fixing P.V.C. Water Stop seal i/c cost of material, its Cutting and fixing in position, labour T & P etc as required for proper completion of work.
Dewatering by Diesel Pumping Set of 5 HP Capacity including hire charges of Pumping set and its POL, Labour and T&P required for proper completion of work.
M/S ARUN CONSTRUCTION
OMPRAKASH SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .