| 1 | Admitted-Finance DN 108 UNIT 23 ZONE 08 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
19 Sept 2022, 2:00 pmClosed
The Additional Chief Engineer Kanchipuram EDC
ADDITIONAL CHIEF ENGINEER KANCHIPURAM.ELECY.DISTN.CIRCLE NO.1,OLIMOHAMEDPETTAI, ANNA MAALIGAI, TANGEDCO, KANCHIPURAM 631502
110 KV, 33 KV Sub Stations ( OH lines and UG Cables including Sub-Station Maintenance ) in AEE/Operation/Sub Division in North Kanchipuram Division of Kanchipuram EDC for a period of ONE YEAR
2022_EB_250762_1
SE/KEDC/KPM/W.C.No.61/22-23 dt 08.09.2022
Open Tender
Electrical and Maintenance Works
Works
365 days
Kahchipuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
3 Oct 2022
9 Sept 2022
20 Sept 2022
9 Sept 2022
19 Sept 2022
9 Sept 2022
9 Sept 2022 - 17 Sept 2022
Excavation of Pole pit of size 2'x2'x1/6 of the height of the pole upto 8 mtr pole by using JCB or Manual
Excavation of Pole pit of size 2'x2'x1/6' of the height of the pole above 8mtr by using JCB or Manual
Excavation of pit in Hard soil (common to all size of poles)
Excavation of pit in Rocky area (common to all size of poles) by blasting /Manual
Excavation of Stay pit 2'x2'x5' depth by using JCB or manual
Excavation of Stay pit 2'x2'x5' depth in hard rock soil
Erection of RCC poles/PSC poles/Metal poles up to 8.00 M (27' ) by using JCB or manual
Erection of RCC poles/PSC poles/Metal poles above 8.00 M by using JCB or maual
Erection of metal supports above 9m/RSJ/Rail pole/Tubular poles
Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc.,
Erection of additional stay in the same rod, excluding excavation of stay pit and burial of stay rod
Erection of stay set complete in the rock area by blasting
Fixing of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of HT pin Insulators 11 KV/ 22 KV/ 33 KV
Fixing of HT 11 KV strain disc.
Fixing of HT 22 KV/33 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
Fixing of Aluminium Knob
Earthing of pole with pin including looping binding and burying
Earthing of additional Cross arm
Fixing of top channel 10' centre/15' centre
Fixing of bed channel
Fixing of centre support for bed channel
Fixing of belting angle
Erection of 11 KV AB Switch
Erection of 11 KV Vertical type AB Switch for single pole DT
Erection of 11 KV HG Fuse set
Erection of 11 KV Solid core HG Fuse set
Feeder arrangements with open type fuse units
Fixing of HT LAS
Fixing of LT LAS
HT Jumpering complete for Transformer DT Structure
HT Jumpering complete for DP Structure
Fixing of cross bracing(4 nos angles) 10' Centre/15' centre
Fixing of danger board
Erection of Transformer centre set arrangments
Fixing of Distribution Transformer Name Board (Name of the 22/11KV #, Name of the SS and Capacity) including Supply of board (1' x 1.5' x 3 mm thickness) including the cost of paint and labour charges
Fixing of LT Cable arrangements while erecting single pole DT
Fixing of Earth coller for earth pits
Erection of Aluminium bus bar pipe complete for HT bus bar arrangements for DP structure
For Triple pole and four pole structure
Fixing of 2 Tapping cross arm per cut point upto 33 KV line including fixing of discs insulators and jumpering etc.,
Fixing of support insulator angle and erection of 3 nos Pin insulator
Fixing of MCD box
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes upto 7/3.35mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor
Releasing and reerection (resagging) of one run of all sizes of conductor
Numbering of pole by using Enamel paint including cost of paint and painting charges (Numbering in black letters with yellow base by using stencils/skilled painters. The height of lettering shall be 40 mm for numbers and 50 mm for alphabets)
Painting of Cement Poles by Distemper coating including cost of distemper
Painting of iron Poles upto 36 ft length with double coats including cost of paint
Painting of iron Poles upto 40 ft 200/100 length with double coats including cost of paint
Painting of top channel
Painting of AB switch
Painting cross Bracing (4 Nos. Angles) both 10' & 15' centre
Painting of Distribution Transformer of all capacities (paint supplied by the Board) including clening of DT
Painting of HG fuse.
Painting of HT metering set and Box
Painting of structure materials distribution transformer with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor) (Paint to be supplied by Board)
Painting of poles and all other metal parts while erecting D.P. Structure
Painting of pole and all other metal parts while erecting new single pole distribution transformer Structure
Service connection details painting
Structure Concreting , Concreting of poles with size (2'x2'x5') including cost of Cement ,20 mm jelly and Sand with a mixture of 1:2:4 and plastering of concrete with ratio 1:2
Sleeve concreting with size (2'x2'x3') including cost of excavation Cement ,40 mm jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials
Stay concreting of Stay with Size 1.5' X 1.5' X 3.0' including cost of Cement, 40mm Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2.
Erection of DP structure with stay as per TNEB Standard including fixing of top channel, cross bracing concreting, painting, colour washing etc., With 11 KV/22 KV/33 KV AB switch using all types of poles of size 9.14m and above length:(Per Structure) Excavation of Structure pole pit
Erection of 9.14m RCC pole
Excavation of pit and erection of stay set including concerting (4 sets) ((4X375) +(4X250)+(4X750))
Fixing of top channel 2 numbers
Fixing of cross bracing 1 set
Erection of 11 KV AB switch 1 set
Earthing complete with pipe
Concreting DP poles
Painting structure colour poles
Labour for DT yard cleaning and making uniform surface
Erection of Double Pole Transformer Structure complete as per TNEB standard including painting, feeders arrangement, colour washing of RCC poles etc., Fixing of poles type to be unit HT/LT LAS and jumpering 3 nos earth pits with earth trough except erection of DT:(Per Structure) Excavation of structure pole pit 3’ x 6’ by using JCB or Manual
Transportation of pole from road side to pole pit by using JCB or Manual
Erection of poles by using JCB or Manual
Excavation of stay pit by JCB or Manual
Erection of stay set complete
Mass concreting for structure
Erection of Structure materials a) Top channel
b) Bed Channel
C) Belting Angle
Erection of AB switch
Erection of H.G. Fuse
Structure earthing complete with 3 pits and earth loops
Feeder arrangements with open type fuse unit for 2 feeders
HT-LAS fixing
LT-LAS fixing
HT jumpering complete
Painting of all clamps and other iron materials and painting of structure pole.
LT Bus arrangement
Fixing of support insulator angle and erection of 3 Nos. Pin insulator
Fixing of Danger board
Labour for DT yard cleaning and making uniform surface
(i) Erection of 11 KV Single pole Transformer Structure including erection of DT complete with centre support :(Per Structure) Excavation of structure pole pit 3’ x 3’ x 6’ by using JCB or Manual
Transportation of pole from road side to pole pit by using JCB or Manual
Erection of poles by using JCB or Manual
Excavation of stay pit by JCB or Manual
Erection of stay set complete
Mass concreting for Poles including Base Concreting
Stay concreting
Erection of Structure material: a)Tapping channel
b)Transformer Bed structure (Bed channel +Centre support for bed channel)
Erection of 11 KV Vertical type AB switch
Erection of 11 KV Solid core H.G. Fuse set
Structure earthing complete with 3 pits and earth loops
Fixing of MCD box
HT-LAS fixing
LT-LAS fixing
HT jumpering complete
Painting of all clamps, other materials and painting of structure pole.
Erection with central supporting arrangement
Fixing of Danger board
Labour for DT yard cleaning and making uniform surface
(ii) Erection of 11 KV Single pole Transformer Structure including erection of DT complete without centre support:(Per Structure) Excavation of structure pole pit 3’ x 3’ x 6’ by using JCB or Manual
Transportation of pole from road side to pole pit by using JCB or Manual
Erection of poles by using JCB or Manual
Excavation of stay pit by JCB or Manual
Erection of stay set complete
Mass concreting for Poles including Base Concreting
Stay concreting
Erection of Structure material: a)Tapping channel
b)Transformer Bed structure (Bed channel +Centre support for bed channel)
Erection of 11 KV Vertical type AB switch
Erection of 11 KV Solid core H.G. Fuse set
Structure earthing complete with 3 pits and earth loops
Fixing of MCD box
HT-LAS fixing
LT-LAS fixing
HT jumpering complete
Painting of all clamps, other materials and painting of structure pole.
Fixing of Danger board
Labour for DT yard cleaning and making uniform surface
(iii) Erection of 11 KV Single pole Transformer Structure including erection of DT complete without centre support:(Per Structure) Excavation of structure pole pit 3’ x 3’ x 6’ by using JCB or Manual
Transportation of pole from road side to pole pit by using JCB or Manual
Erection of poles by using JCB or Manual
Excavation of stay pit by JCB or Manual
Erection of stay set complete
Mass concreting for Poles including Base Concreting
Stay concreting
Erection of Structure material: a)Tapping channel
b)Transformer Bed structure (Bed channel +Centre support for bed channel)
Erection of 11 KV Vertical type AB switch
Erection of 11 KV Solid core H.G. Fuse set
Structure earthing complete with 3 pits and earth loops
Fixing of MCD box
HT-LAS fixing
LT-LAS fixing
HT jumpering complete
Painting of all clamps, other materials and painting of structure pole.
Erection with central supporting arrangement
Fixing of Danger board
Labour for DT yard cleaning and making uniform surface
(iii) Erection of 11 KV Single pole DP structure with stay as per TNEB Standard including fixing of top channel, cross bracing concreting, painting, colour washing etc., with single earth
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa (i) Upto 25 KVA Distribution transformer / Metering set.
(ii) Above 25 KVA to 100 KVA
(iii) Above 100 KVA to 250 KVA
(iv) 500 KVA and above
(V) Failed DT replacement below 100 KVA
(vi) Failed DT replacement 100 KVA and above
LT split neutral guarding
Flat guarding including fixing of 2 Nos. cross arms HTLT
D.O.T. Crossing
Railway Crossing ( cradle guarding).
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Provision of spike including earthing arrangement
Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length
Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
Replacement of corroded earth pipe
Earthing of D.P.complete
Earthing of new single pole distribution transformer structure complete
Loading or unloading of Distribution Transformer (i) Upto 100 KVA
(ii) Above 100 KVA and upto 500 KVA
(iii) Metering set of all ratios
Loading or unloading of various sizes of poles (i) REC, RCC, PSC pole upto 8.00 m length
(ii) All REC, RCC pole above 8.00 m length
(iii) Metal poles all sizes
Loading of Conductor
Unloading of Conductor
Loading / Unloading of Iron & Steel
Loading / Unloading of Oil
Loading / Unloading of line materials
Loading / Unloading of 11 KV strain disc
Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
Loading / Unloading of single phase meters
Loading / Unloading of three phase meters
Loading and unloading of cement bag of 50Kg.
Loading and Stacking of Materials
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 5 KM
(ii) Above 5 KM of lead of every KM
Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location (i) Upto 1 KM
(ii) Above 1 KM per each KM
Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor
(i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
(i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) (ii) Above 10 KM
Erection of street light including fixure fitting
Erection of street light service
Fixing of new SV/MV/LED lamp fittings
Assisting for survey of HT/LT
Hut service fixing
Agricultural service fixing / service
Breaking and Releasing of grills from RCCPSC poles
Releasing of single phase service wire and re-fixing.
Releasing of 3 phase service wire and (upto 50 HP) re-fixing.
Releasing of 3 phase service wire and (above 50 HP) re-fixing.
Labour charges for alteration of Back clamps to suit for the works
Labour charges for alteration of Stay clamps to suit for the works
Providing LT bus bar arrangement in distn. Trs. Structure location
Fixing of meter on LV side of DT
Erection of concrete earth tub to Distribution Transformer earth pipe
Dismantling of detoriated cables/Replacement of various size(95,120,185 Sq.mm) from Distribution Transformer LT bushing to LT open type clamp and provision of suitable lugs at both the ends.
Dismantling and Erection of LT open type fuse unit Aluminium clamps
Dismantling of Distn. Transformer from structure Transporting to special Maintenance assisting the special maintenance crew in overhauling and reerection at the structure a)up to 8Kms
b)Above 8Kms per km
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
Tiding of service connection with erection of clamp jumper in Low tension single phase SC/line,Aerial Board, Fuse unit and looping.
Tiding of service connection with erection of clamp jumper in Low tension three phase line, Aerial Board, Fuse unit and looping.
Renewal of jumper from 22/11 KV line to AB switch to HG Fuse, HG Fuse to Distn. Transformer with PG clamps.
Cutting of coconut leaves /tree branches
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of flat
Cutting of channel
Cutting of Angle
Cutting of pipe
RSJ pole cutting
RSJ pole welding
Providing of line spacers for single phase line
Providing of line spacers for three phase line
Hiring Charges for JCB
Clearing of Jungle
Clearing of scrup in Yard (DT/SS)
Set right of all sizes of leaning of poles
Erection of LT Shunt Capacitor
Ground patrolling of HT lines during Breakdown
Rectification of snapped HT line during Break down
Rectification of snapped LT line during Break down
Erection of Single phase meters
Erection of Three phase meters
Monthly Maintenance Maintaining Transformer Yard and earth pits neat and tidy
Cleaning the entire transformer including the bushings
Checking for oil level and reportingif the level is below the mark
Checking the earth connections and watering the earth pits
Checking the oil leaks and reporting if any noticed
Reconditioning the breather (by reactivating Silicagel or replacing it if necessary)
Checking the LT fuses and renewing them if necessary
Quarterly Maintenance Renewing the HG fuses
Measuring the insulation resistance and Load currents
Annual Maintenance Lubricating the AB switches and checking their operation
Checking the lines and earth connections of AB switch
Checking the lines and earth connections of HT and LT lightning arresters
Checking the HV and LV bushing connections
Substation Maintenance Complete maintenance of Power Transformer of all capacities
Complete maintenance of Breaker,CT/PT for 110 KV and above
Complete maintenance of Breaker,CT/PT for capacity less than 110 KV
Complete maintenance of Centre Rotating Switch 110 KV and above
Complete maintenance of Centre Rotating Switch below 110 KV
Replacement of Clamps of all sizes
Complete maintenance of LAS 110 KV and above
Complete maintenance of LAS below 110 KV
Replacement of Jumpers less than 1 metre
Replacement of Jumpers more than 1 metre
Maintenance of earth pits and watering
Cleaning of control and relay panels (Front,Back and inside)
Mainenance of Capacitor Bank cell
Replacement of capacitor bank cell
Replacement of PT Insulator
Replacement of Female/Male contact for 110 KV
Replacement of Female/Male contact for less than 110 KV
Maintenance of Battery
Dismantling charges Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
For breaking the mass concrete of all supports
Dismantling of stay set complete (i) including stay rod
(ii) Without stay rod
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of Cross arm clamps TI fitting hardwares, insulators etc.,
Dismantling of line materials/ other items for which the rate have not been given
Laying of HT Cable Loading and unloading of HT Cable including coiling and recoiling
Transport of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 km
Transport of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 km
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights indication arrangements wherever necessary all lead,lift, labour and tools and plants etc., complete Normal Road (earth)
Tar Road
Concrete Road
LAYING OF HT CABLE Laying of 11 KV 3X300 sq mm XLPE cable
Laying of 11 KV 3X120 sq mm XLPE cable
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 km
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 km
Laying of LT Cable Loading and unloading of LT Cable including coiling and recoiling
Transport of LT cable from departmental stores to work spot by engaging private vehicle upto 5 km
Transport of LT cable from departmental stores to work spot by engaging private vehicle above 5 km
Excavation of cable trench 45 cm width and 75 cm depth including cost of providing sign boards, danger lights, indication arrangements wherever necessary, lead, lift, labour and tools and plants etc., complete, Normal Road (earth)
Tar Road
Concrete Road
Laying of LT Cables Laying of 4 X 240 sq.mm cable
Laying of 4 X 120 sq.mm XPLE cable
Laying of 4 X 25 sq.mm cable
Laying of 2 X 16 sq.mm cable
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
Trenchless cable laying (New/Rectification) Laying of HT UG Cable using Trenchless technique without pipes
Erection of pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing the pillars below ground level 1 feet and above 2 feet/3 feet from ground level including cost of all materials, cost of labours including electrical works, transportion, lead, lift complete etc., Mini pillar boxes for 3 feet
4/6/8 way pillar box 3 feet
4/6/8 way pillar box 4 feet
Cleaning, painting with Aluminium paint 2 coats & numbering pillar box with feeder details. (Estimate sanction, mandatory) including cost of all materials 8 way pillar box
6 way pillar box
4 way pillar box
Mini way pillar box
Cleaning, painting with Aluminium paint 2 coats & numbering pillar box with feeder details. (Estimate sanction, mandatory) without materials 8 way pillar box
6 way pillar box
4 way pillar box
Mini way pillar box
Dismantling of pillar box Dismantling of old 5/6/8 way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
Dismantling of old mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
Maintenance of pillars works such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing 8 way pillar box
6 way pillar box
4 way pillar box
Mini pillar box
Earthing of Pillar boxes 8/6/4 and mini pillar boxes
LT Cable fault rectification works Earth Work Exacavation to the (Cable Route) required depth, width Normal
Concrete
Laying of LT Cable Laying of 4 X 240 sq.mm cable
Laying of 4 X 120 sq.mm XPLE cable
Laying of 4 X 25 sq.mm cable
Laying of 2 X 16 sq.mm cable
Refilling the trench cable
Transport of all materials to attending the fault from office to site and site to office vice versa
Provision of joint 240/120 Sq mm
1. HT Cable fault rectification works 2. ATTENDING TO FAULTS IN 11KV & 33KV CABLES BY DOING IT MANUALLY Earth work Excavation to the required depth, width(cable route) is 1.2m x 0.6m respectively (As per prevailing PWLC Rates) Normal
Concrete
Laying of HT Cable /M (As per prevailing PWLC Rate) 11 KV
33 KV 1 X 630 sqmm
33 KV 3 X 630 sqmm & 3X 400 sqmm
Installation of terminations by employing private jointer in the absence of company jointer (intimation to be given to company through mail/company phone Nos and record to be maintained) 11 KV 120/300 sqmm Indoor/Outdoor terminations
33 KV 1x630 sqmm Indoor/Outdoor terminations
33 KV 3x400/3x630 sqmm Indoor/Outdoor terminations
Installation of joint by employing private jointer in the absence of company jointer (intimation to be given to company through mail/company phone Nos and record to be maintained) (i)LT
(iii)33 KV(1X630Sqmm)
(iv)33 KV(3x400Sqmm)
Refilling with M- sand over the cable and jointscost of M- sand PWD Schedule of Rate 11 KV
Refilling labour charges /mtr (As per PWLC Rate) 11 KV
Transporting of cables and joint kits from stores to site 11 KV
Transporting of cables and joint kits from office to site 11 kv
Engaging JCB For Excavation of Earth and Back filling the earth after rectification of fault
Engaging JCB For Excavation of Earth and Back filling the earth after rectification of fault 11 kv
Engaging Hydraulic compressor (Tractor) for Breaking concrete/Tar Roads (Wherever Necessary) 11 kv
Rental for de-watering pump as per PWD schedule of Rate (Wherever necessary) 11 kv
Engaging Labour for Manual excavation and cleaning the trench, joint pit excavation and identify the cable in addition to engaging JCB. 11 kv (Rs.562/-x 2 person)
33 kv (Rs.562/-x 3 person)
Concreting after rectification of fault by using PCC 1:3:6 ( If applicable, with necessary justification & certification by concern Executive Engineer For reqd length,width and depth as per site condition) 11/33 KV
Releasing the service connection cable from OH line, cutting the service cable of required length for terminating in the newly erected pillar boxesand handing over of released cable in section storesduring OH line to UG cable conversion works LTUG 2x16 sqmm cable
LTUG 4x25 sqmm cable
LTUG 4x120 sqmm cable
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .