Tender Value
₹3.6 Cr
EMD Value
₹1.9 L
Closing Date
28 Sept 2026, 3:30 pmDue tomorrow
superintending engineer
SIPCOT Head office Egmore chennai
Providing Water Supply Arrangements such as Construction of 25LL Sump and Construction of 2 Nos 5LL O.H.T at SIPCOT Industrial Park, Gangaikondan Phase - II
2026_SIPCT_704022_1
NIT.No.25/CD/T.No.25/2026-27
Open Tender
Civil Works
Lump-sum
SIPCOT Industrial Park, Gangaikondan Phase - II
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹1.9 L
SIPCOT Head office
12 Sept 2026
12 Sept 2026
29 Sept 2026
12 Sept 2026
28 Sept 2026
21 Sept 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of 25LL Capacity U.G. Sump | |||||
| 1.01 | Earthwork excavation and depositing on bank with an initial lead of 10 meters and initial lift of 2 metres removing hard rock by wedging chiesling and trimming to proper shape where plasting is prohibited and as per standard specification and as directed by SIPCOT officers. | - | - | - | - |
| 1.02 | Upto 2m depth | 1,355 | Cum | - | - |
| 1.03 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in medium rock and dense medium rock not requiring blasting and as per standard specification and as directed by SIPCOT officers. | - | - | - | - |
| 1.04 | 2 to 3m depth | 680 | Cum | - | - |
| 1.05 | Providing plain cement concrete 1:4:8 using 40 mm ISS HBG Metal including cost and conveyance of all materials at site and all labour charges for mixing, laying and curing etc., complete as per standard specification and as directed by SIPCOT officers. | 66 | Cum | - | - |
| 1.06 | Providing and laying in position, Standardised Concrete Mix M-25 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kg/mᶾ and maximum water cement ratio of 0.50, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by "SIPCOT" Officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | - | - | - | - |
| 1.07 | Foundation and basement | 359 | Cum | - | - |
| 1.08 | Above GL and upto 4.50m height in ground floor | 145 | Cum | - | - |
| 1.09 | Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 x 25x 3mm for boarding laid over silver joints for size 10cm and supporting by Casurino props 10cm - 13cm spaced at 75cm c/c etc, complete and as directed by SIPCOT officers. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TechnicalannexureI.pdf
Tender Documents • 0.56 MB
TechnicalannexureII.pdf
Tender Documents • 0.99 MB
BOQ_846196.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .