Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-AOC | ₹40.7 L | L1 | Accepted-AOC Work order issued |
| 2 | L1₹40.7 LRejected-Finance AT MADHUBAN W NO 07 BARIPADA DIST MAYURBHANJ PIN 757001 | BARIPADA | MAYURBHANJ | ODISHA | 757001 | ₹40.7 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 3 | L1₹40.7 LRejected-Finance | ₹40.7 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 4 | L1₹40.7 LRejected-Finance W NO 26 PO BHANJPUR DIST MAYURBHANJ PIN 757002 | BHANJPUR | MAYURBHANJ | ODISHA | 757002 | ₹40.7 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 5 | L1₹40.7 LRejected-Finance AT PRAFULLA NAGAR WARD NO 06 PO PS BARIPADA DIST MAYURBHANJ ODISHA 757001 | BARIPADA | MAYURBHANJ | ODISHA | 757001 | ₹40.7 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
Tender Value
Refer Docs
EMD Value
₹40,700
Closing Date
17 Jul 2026, 5:00 pmClosed
SE Mayurbhanj (R and B) Division Baripada
O/o the SE Mayurbhanj (R and B) Division Baripada
Repair and Renovation of Circuit House Old Kitchen Building and RCC Drain work at Baripada in the District of Mayurbhanj for the year 2026-27.
2026_EICCL_134575_1
Bid Id No. SE- 08/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹40,700
Yes
10 Sept 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | - | Sqm | 8.6 | - |
| 2 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | - | Cum | 282.9 | - |
| 3 | Filling Foundation and Plinth with sand watered and rammed etc as pe the direction of the Engineer-in charge. | - | Cum | 503.1 | - |
| 4 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. | - | Cum | 6,337 | - |
| 5 | Providing & applying Post constrution of Antitermite treatment by drilling 12 mm dia holes at a distance of 30cm@ junction of wall and floor about 300mm apart deep enough to each the soil below and chemical emulsion(PREMISE,IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with475 ltr water) pumped these holes to soak the soil @1Ltr solution of each holea as per manufactures specification and the holes should be pluged with filling materials including cost of all materials,labour charges,conveyance and all taxes and hiring charges of machinaries as per direction of Engineer in charges. | - | Sqm | 150.8 | - |
| 6 | Cement concrete (1:2:4) with 12mm hard granite chips(Crusher broken) per 1 cum etc all complete as per Direction of Engineer-in-Charge. | - | Cum | 8,018 | - |
| 7 | 2.5 cm thk DPC with Cement concrete (1:2:4) including punning using 12mm size hand broken granite chipps. | - | Sqm | 395.7 | - |
| 8 | Fly Ash. brick masonry of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with approved grade cement and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | 1 | Cum | 5,591 | ₹5,585.41 |
| 9 | Fly Ash. brick masonry of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with approved grade cement and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge
Ground Floor | - | Cum | 5,624.3 | - |
| 10 | First Floor | 1 | Cum | 5,985.1 | ₹5,979.11 |
stage.html
html • 0.23 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_599892.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
dtcn.pdf
Tender Documents • 5.02 MB
BOQ_599892.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .