| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC VILL RAMPUR P O ARUARA DIST PURBA BARDHAMAN | ARUARA | PURBA BARDHAMAN | WEST BENGAL | ₹5.8 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹5.8 L+₹117 (0.02%)Rejected-Finance VILL SARANGPUR HABASPUR DISTRICT PURBA BARDHAMAN PIN 713401 | HABASPUR | PURBA BARDHAMAN | WEST BENGAL | 713401 | ₹5.8 L+₹117 (0.02%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹5.8 L+₹292 (0.05%)Rejected-Finance 61 KALI BAZAR AMTALA BARDHAMAN | BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | ₹5.8 L+₹292 (0.05%) | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹5.8 L
EMD Value
₹11,676
Closing Date
22 May 2026, 11:00 amClosed
EE-I/DAMODAR CANAL DIVISION
EE-I/DAMODAR CANAL DIVISION
M and R to Cart Bridge at ch 32.00 of 6 JMC along with allied works under Kusumgram Section of D. C. No-I Sub-Division within D. C. Division (2nd Call).
2026_IWD_1024197_3
WBIW/EE-I/DCD/e-NIT-01/2026-27
Open Tender
CIVIL WORKS
Percentage
45 days
Kusumgram Section
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,676
Yes
17 Jun 2026
15 May 2026
22 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(iv) Without pumping out water and shoring | 76.52 | Cum. | 135.87 | ₹10,396.77 |
| 2 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. | 1 | Cum. | 823.78 | ₹822.96 |
| 3 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a)) Pakur Variety | 57.76 | Cum. | 5,743.19 | ₹3,31,726.65 |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety | 5.76 | Cum. | 6,346.71 | ₹36,557.05 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications | 1 | MT | 73,217.47 | ₹73,144.25 |
| 6 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface(ii) With 1:4 cement mortar (b) 15 mm thick plaster | 49.5 | Sqm. | 176.65 | ₹8,744.18 |
| 7 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches | 119.15 | Sqm. | 28.6 | ₹3,407.69 |
| 8 | Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications | 18 | Each. | 137.06 | ₹2,467.08 |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.
(II) By Mechanical Means ,a) Cement Concrete | 4.86 | Cum. | 560.15 | ₹2,722.33 |
| 10 | Dismantling of Structures: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.
(II) By Mechanical Means
b) Reinforced Cement Concrete | 1.2 | Cum. | 921.26 | ₹1,105.51 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_2517175.xls
BOQ • 0.25 MB
2911i.pdf
Tender Documents • 1.26 MB
1.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .