| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | -34.01% | ₹7.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.1 L+₹21,132.43 (2.67%)Admitted-Fee/PreQual/Technical/Finance | -32.25% | ₹8.1 L+₹21,132.43 (2.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.4 L+₹48,148.31 (6.08%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹8.4 L+₹48,148.31 (6.08%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.7 L+₹75,764.54 (9.56%)Admitted-Fee/PreQual/Technical/Finance | -27.70% | ₹8.7 L+₹75,764.54 (9.56%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.8 L+₹90,173.01 (11.4%)Admitted-Fee/PreQual/Technical/Finance | -26.50% | ₹8.8 L+₹90,173.01 (11.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
11 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_323470_1
e-NIT No. 160 REW UDHAMPUR of 2026-27 Dated 03-09-2026
Open Tender
Civil Works
Percentage
60 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹24,000
14 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1O sqm on plan, depth upto 1.5mtr. Including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in any kind of soil. | 25.91 | cum | 479.3 | ₹12,418.66 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.29 | cum | 5,202.9 | ₹22,320.44 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.63 | cum | 9,395.7 | ₹43,502.09 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.21 | cum | 7,788.4 | ₹32,789.16 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 9.43 | cum | 9,821.85 | ₹92,620.05 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 16.61 | cum | 5,733.6 | ₹95,235.1 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 10.37 | cum | 7,571.55 | ₹78,516.97 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 10.37 | cum | 1,455.65 | ₹15,095.09 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 62.83 | sqm | 286.35 | ₹17,991.37 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, pillars, piers, abutments, posts and struts | 33.46 | sqm | 742.55 | ₹24,845.72 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_1088773.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .