Loading…
Loading…
Tender Value
₹99,000
EMD Value
₹1,980
Closing Date
18 Sept 2026, 6:55 pm
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627105814- CO FPB FROM HO BILAL AH BHAT TO ONWARDS ON ZALKHUNA ROAD AT BUNPORA CHERSOO I. BLOCK AWANTIPORA
2026_RDPR_320716_54
e- NIT No. 94/2026-27 Dated 12-08-2026
Open Tender
Civil Works
Percentage
45 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹1,980
12 Aug 2026
12 Aug 2026
19 Sept 2026
12 Aug 2026
18 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil : | - | Cum | - | - |
| 2 | Providing and laying of soling handpacked including carriages all complete. | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | Cum | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone using Quarry Stones. | - | Cum | - | - |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 1 | Sqm | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 0.8 | Kgs | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundations, walls (any thickness). | - | Sqm | - | - |
| 9 | Carriage of sand and aggregates by MT for average lead of 14 Kms | - | Cum | - | - |
| 10 | Add provision for Signboard/Photographs | - | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1067327.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].