Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-Finance PHYANG LEH | L1 | Accepted-Finance Admitted | |
| 2 | L2₹16.5 L+₹2.9 L (21.5%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹14.8 L
EMD Value
₹33,680
Closing Date
8 Sept 2021, 4:00 pmClosed
Divisional Forest Officer Leh
Divisional Forest Office, Forest Division Leh Fort Road UT Ladakh
Construction of stone walling, retaining wall and P/L of c.concrete canal at Badami bagh nursery of Leh forest Range (Under SDP On Going Scheme Up Gradation of Nursery).
2021_FEE_4157_1
E-Tender (28) of FDL 2021-22
Open Tender
Civil Works - Others
Works
60 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
Divisional Forest Officer Leh Ladakh
₹33,680
11 Sept 2021
19 Aug 2021
9 Sept 2021
19 Aug 2021
8 Sept 2021
19 Aug 2021
Amount
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: 39x4’.00”x2’.00”x5’.6”=1716 cfts 212’x2’.00x3’.00”=1272 cfts T otal= 2988 cfts 84.56 cum of complete job
Providing and fixing upto floor level precast cement concrete solid blocks including hosting and setting in position with cement motor 1:3(1 cement:3 coarse sand) 39x2’.0”x2’.6”x5’.6”=1072 cfts or 30.35 cum of complete job
Random Rubble masonry with hard stone in foundation and plinth with mud motor of complete job. 320’x2’.00”x5’.6”=3520 cfts 322’x1’.6”x1’.00”=483 cfts 90’x2’.00”x0.6”=90 cfts 125’x1’.6”x4’.6”=843.75 cfts
15mm thick cement plaster on rough side of stone wall of mix 1:4(1 cement: 4 Fine sand) 793’x5’.6”=4361 sqft. Or 405.18 sqm Add pillar sides’s edges: 39x0.6”x5’.6”=107.25 sqft. area of a circle 213.52 sqft
Providing and fixing upto floor level precast cement concrete 1:3:6(1cement 3 finesand 6 graded stone agg.20mm nominal size)1 crushed for coping of complete job. 1x781’x2’.6”x 0.3”+0.6”+0.3”= 781 cfts 3 Base=550’x2’.00”x0.6’’=550 cft Side=2x550’x0.6”x1’.6”=825 cfts
Earth excavation by means of manual labour for lying foundation of khul 550’x’3.00x0.6’=825 cfts or 23.34 cum
Centering and shuttering including structing propping etc.and removal of form work. 2x80x1’.6”=240 sqft. Or 22.29 sqmt
Providing and laying DPC 50mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5mm nominal size) Nallah of complete job 125’x1’.6”=187.5 sqft=17.41 sqm
Stone filling dry pitching complete work including cost of stone Nallah stone. 3629.84 sqftx1’.00”=3629.84sqfts or 102.72 sqm.
Providing and laying in position of cement concrete of specified grade, excluding the cost of centering and shuttering. all work up to plinth level 1:3:6 (1 cement :3 coarse and 6 graded stone aggregate (40mm nominal size) , carriage of material up to the site complete job in the area of a circle: Area of a circle of 34”diameter=A=πr^2 3629.84 sqft x 0.2”=580.77 cft or 16.43 cum
M/S STANZIN TSETAN GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .