Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAdmitted-Finance 0 MELROSE BYPASS NETAJI COLONY ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | ₹18.7 L | L1 | Admitted-Finance |
| 2 | L2₹19.5 LAdmitted-Finance | ₹19.5 L | L2 | Admitted-Finance |
| 3 | L3₹21.6 LAdmitted-Finance | ₹21.6 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 133 131 | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | Rejected-Technical Not Eligible for part 1 |
| Sl No | Description | Qty | Unit | M/S BALAJI ENTERPRISES L1 | M/s Shukla Enterprises L2 | Hindustan Electric Work L3 |
|---|---|---|---|---|---|---|
| 1.00Part - A ( Material) Following Material Supplied by the Contractor:- | ||||||
| 1.01 | LT Clamp | 50 | Nos. | 250 ₹12,500 | 280 ₹14,000 | 200 ₹10,000 |
| 1.02 | LT Shackle Insulator | 50 | Nos. | 35 ₹1,750 | 30 ₹1,500 | 180 ₹9,000 |
| 1.03 | Aluminum Lug(Long Barrel) | 30 | Nos. | 110 ₹3,300 | 100 ₹3,000 | 150 ₹4,500 |
| 1.04 | Holding Clamp with Nut & Bolt | 70 | Nos. | 200 ₹14,000 | 190 ₹13,300 | 225 ₹15,750 |
| 1.05 | Nut & Bolt | 150 | Kg | 200 ₹30,000 | 150 ₹22,500 | 198 ₹29,700 |
| 1.06 | LT Clamp with Nut & Bolt | 40 | Nos. | 100 ₹4,000 | 190 ₹7,600 | 195 ₹7,800 |
| 1.07 | Aluminum lug For 150 sqmm | 22 | Nos. | 150 ₹3,300 | 125 ₹2,750 | 80 ₹1,760 |
| 1.08 | Aluminum lug For 63 KVA T/F | 10 | Nos. | 150 ₹1,500 | 190 ₹1,900 | 85 ₹850 |
| 1.09 | Stay Clamp for 8.5 Mtr. PCC Pole | 60 | Nos. | 300 ₹18,000 | 348 ₹20,880 | 280 ₹16,800 |
Tender Value
₹19.5 L
EMD Value
₹19,500
Closing Date
19 Jan 2026, 5:00 pmClosed
SE, EDC, Ayodhya
SE, EDC, Civile Line Ayodhya.
99H(F)(W)/2025-26
2026_MVVNL_1105157_1
99H(F)(W)/2025-26
Open Tender
Electrical Works
90 days
Ayodhya
As per tender Form
2 documents required · 2 mandatory
₹3,540
SE, EDC, Ayodhya
₹19,500
12 Feb 2026
10 Jan 2026
20 Jan 2026
10 Jan 2026
19 Jan 2026
10 Jan 2026
Part - A ( Material) Following Material Supplied by the Contractor:-
LT Clamp
LT Shackle Insulator
Aluminum Lug(Long Barrel)
Holding Clamp with Nut & Bolt
Nut & Bolt
LT Clamp with Nut & Bolt
Aluminum lug For 150 sqmm
Aluminum lug For 63 KVA T/F
Stay Clamp for 8.5 Mtr. PCC Pole
11 KV Stay Insulator
X- Arm Holding Clamp for PCC Pole
11 KV F- Clamp for 8.5 Mtr. PCC Pole
ST Pole Clamp
St Pole Stay Clamp
S.T. F Clamp
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 50 Km.)
Safe cartage of 8.5/9.0 Mtr. Long PCC poles.
Safe cartage of 11.0 Mtr. Long ST poles.
ACSR Weasel Conductor
AB Cable (1x16+1x25) sqmm
AB Cable (3x50+1x35+1x16) sqmm
AB Cable (3x95+1x70+1x16) sqmm
AB Cable (3x120+1x95+1x16) sqmm
Distribution Box Three Phase/Single Phase
Transformer 25 KVA
Transformer 63 KVA
Transformer 100 KVA
Transformer 250 KVA
11 KV Cable Jointing Kit Outdoor 3x70 sqmm
11 KV Cable Jointing Kit Outdoor 3x120 sqmm
11 KV Cable Jointing Kit Staight Through 3x70/120 sqmm
11 KV XLPE Cable 3x70mm2
11 KV XLPE Cable 3x120 mm2
11 KV XLPE Cable 3x185 mm2
11 KV Pilfer Proof Metring Cubical
Other Line material i.e. cross arm /conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of PCC/ST Pole as per RESPO Norms.
Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, binding and jumpering of AB Cable Size (1x16+1x25)/ (3x50+1x35+1x16)/ (3x95+1x70+1x16) and (3x120+1x95+1x16) as per RESSPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 100 KVA Transformer as per RESSPO Norms.
Mounting of 250 KVA Transformer as per RESSPO Norms.
Erection & Commissioning of of Single/Three Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x70 mm2/3x120/3x185 sqmm confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x70/120 sqmm confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Laying of underground 11 KV 3x70/3x120/3x185 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x70 mm2/3x120/3x185 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contractor)
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Construction of Transformer Plinth size 2x2x1.5 including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
Construction of Fencing of Transformer by MS Sqaremash Fabricated on MS Angles 0 Size 50x50x6mm and MS Strip (50x6mm) fencing (6 fit Hight including Civil Work) having OVerall dimension Complete with one no gate with provision of hinges roller & lacking arrangemtn properly grouted and painted with one coat of ret oxide Primer and two coats of Bus Green Super Enamel Paint.
Installation of 11 KV Pilfer Proof Metering Cubical
Supply and Laying of G.I. Pipe 6'' dia
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_2039170.xls
BOQ • 0.27 MB
TenderForm.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid