Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 CrAccepted-AOC | ₹14.5 Cr Quoted ₹14.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹14.2 CrRejected-AOC | ₹14.2 Cr | L2 | Rejected-AOC L2 |
| 3 | L2₹14.2 CrRejected-AOC | ₹14.2 Cr | L2 | Rejected-AOC L2 |
| 4 | L3₹14.9 CrRejected-AOC | ₹14.9 Cr | L3 | Rejected-AOC L3 |
| 5 | L3₹14.9 CrRejected-AOC | ₹14.9 Cr | L3 | Rejected-AOC L3 |
Tender Value
₹15.2 Cr
EMD Value
₹15.2 L
Closing Date
4 Jul 2023, 5:00 pmClosed
Superintending Engineer (Airport)
Executive Engineer (APIV), CIDCO Ltd., Navi Mumbai International Airport (NMIA), Belapur Railway Station complex, Tower No.10, 3rd Floor, CBD-Belapur, Navi Mumbai
Balanced integrated development in Sector - 1 to 3 of Pushpak Nagar at Dapoli, Navi Mumbai under NMIA Project. (Part II near Bhangarpada Gaothan).
2023_CIDCO_914152_1
CANO05/CIDCO/EE(AP-IV)/23-24
Open Tender
Civil Works
548 days
CIDCO LTD
Please refer Tender documents.
5 documents required · 5 mandatory
₹35,400
₹15.2 L
Yes
16 Oct 2024
9 Jun 2023
6 Jul 2023
9 Jun 2023
4 Jul 2023
9 Jun 2023
eProcurement System Government of Maharashtra Created By: Ishan Munjewar Created Date/Time: 21-Aug-2023 04:31 PM Tender Title: Balanced integrated development in Sector - 1 to 3 of Pushpak Nagar at Dapoli Navi Mumbai under NMIA Project Part II near Bhangarpada Gaonthan Tender ID: 2023_CIDCO_914152_1
Tender Inviting Authority: SUPERINTENDING ENGINEER (AIRPORT), CIDCO LTD.
Name of Work : Balanced integrated development in Sector - 1 to 3 of Pushpak Nagar at Dapoli, Navi Mumbai under NMIA Project. (Part – II near Bhangarpada Gaothan).
Contract No: C.A.NO.05/CIDCO/EE(AP-IV)/2023-24
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 P.P.KHARPATIL CONSTRUCTIONS PRIVATE LIMITED(GSTN-27AACCP4003B1Z4) 148561510.710 -4.500 141876242.728 Fourteen Crore Eighteen Lakh Seventy Six Thousand Two Hundred and Fourty Two
2.00 Saket Infraprojects Ltd.(GSTN-27AAKCS4532L1ZY) 148561510.710 -5.040 141074010.570 Fourteen Crore Ten Lakh Seventy Four Thousand Ten
3.00 THAKUR INFRAPROJECTSPVT LTD(GSTN-27AACCT6451F1ZC) 148561510.710 0.000 148561510.710 Fourteen Crore Eighty Five Lakh Sixty One Thousand Five Hundred and Ten
4.00 J M Mhatre Infra Pvt Ltd(GSTN-27AACCJ2959E1ZJ) 148561510.710 0.000 148561510.710 Fourteen Crore Eighty Five Lakh Sixty One Thousand Five Hundred and Ten
5.00 Ajwani Infrastructure Pvt. Ltd.(GSTN-27AAACG7651C1ZT) 148561510.710 -4.500 141876242.728 Fourteen Crore Eighteen Lakh Seventy Six Thousand Two Hundred and Fourty Two
Lowest Amount Quoted BY: Saket Infraprojects Ltd.(141074010.570)
BOQ Summary Details Tender Title: Balanced integrated development in Sector - 1 to 3 of Pushpak Nagar at Dapoli Navi Mumbai under NMIA Project Part II near Bhangarpada Gaonthan Tender ID: 2023_CIDCO_914152_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Saket Infraprojects Ltd. 141074010.570 L1
2 P.P.KHARPATIL CONSTRUCTIONS PRIVATE LIMITED 141876242.728 L2
3 Ajwani Infrastructure Pvt. Ltd. 141876242.728 L2
4 THAKUR INFRAPROJECTSPVT LTD 148561510.710 L3
5 J M Mhatre Infra Pvt Ltd 148561510.710 L3
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid